Thermal Expansion Coefficient and Young's Modulus by Material
Parts do not stay the size they were measured at. This table gives the typical linear thermal expansion coefficient and Young's modulus of common shop materials, so you can estimate how much a part grows or flexes before you set a tolerance or an inspection temperature.
| Material | Family | CTE (um/m per K) | Young's modulus (GPa) | Growth, mm per m per 100 K |
|---|---|---|---|---|
Carbon steel 1018 | Steel | 11.7 | 205 | 1.17 |
Alloy steel 4140 | Steel | 12.3 | 205 | 1.23 |
Stainless 304 | Stainless | 17.2 | 193 | 1.72 |
Stainless 316 | Stainless | 16 | 193 | 1.6 |
Stainless 410 | Stainless | 9.9 | 200 | 0.99 |
Stainless 17-4 PH | Stainless | 10.8 | 197 | 1.08 |
Gray cast iron | Steel | 10.5 | 100 | 1.05 |
Aluminium 6061-T6 | Aluminium | 23.6 | 68.9 | 2.36 |
Aluminium 7075-T6 | Aluminium | 23.4 | 71.7 | 2.34 |
Aluminium 2024-T3 | Aluminium | 23.2 | 73.1 | 2.32 |
Copper C11000 | Copper alloy | 17 | 117 | 1.7 |
Brass C36000 | Copper alloy | 20.5 | 97 | 2.05 |
Phosphor bronze C51000 | Copper alloy | 17.8 | 110 | 1.78 |
Titanium Ti-6Al-4V | Titanium | 8.6 | 114 | 0.86 |
Inconel 718 | Nickel alloy | 13 | 200 | 1.3 |
Nickel 200 | Nickel alloy | 13.3 | 204 | 1.33 |
Invar 36 | Nickel alloy | 1.3 | 141 | 0.13 |
Magnesium AZ31B | Other metal | 26 | 45 | 2.6 |
Zinc (pure) | Other metal | 30 | 108 | 3 |
Tungsten | Other metal | 4.5 | 411 | 0.45 |
Borosilicate glass | Glass | 3.3 | 64 | 0.33 |
Acetal (POM) | Plastic | 110 | 3 | 11 |
Nylon 6/6 | Plastic | 80 | 2.8 | 8 |
Polycarbonate | Plastic | 65 | 2.4 | 6.5 |
ABS | Plastic | 90 | 2.3 | 9 |
PTFE | Plastic | 120 | 0.5 | 12 |
Values are typical room-temperature to about 100 degrees C figures from common handbook data. Real values vary with alloy, temper, temperature range and, for plastics, fillers, moisture and grade. Use the supplier data sheet for any tolerance-critical calculation.
Link material data to inspection records
We can discuss how to connect material attributes with inspection results in your ERP or quality system.
Optional. The tool and every export work without this. No spam.
How to use the table
Find your material, then multiply its CTE by the length and the temperature change. Growth in micrometres equals CTE in um/m per K times length in metres times temperature change in K. The last column does that for one metre and a 100 K rise, in millimetres, so you can scale it quickly. Young's modulus helps estimate deflection and stress when a constrained part cannot expand. Export to Excel to link the values to a quote or a tolerance study.
Where it matters in a plant
Dimensional inspection is standardised at 20 degrees C, so a warm aluminium part measured at 30 degrees C reads larger than it really is. Mixed-material assemblies, such as an aluminium housing with a steel shaft or a plastic part on a metal frame, see differential growth that changes fits and seal loads. Machine tools and fixtures drift as the shop warms during a shift, which shows up as size trends in the SPC chart.
- 100 mm aluminium part, 10 K warmer: about 0.024 mm larger
- Steel and aluminium differ by roughly a factor of two
- Plastics expand five to ten times more than steel
- Invar is used where size stability beats cost
Common mistakes
People often use a single steel value for all steels, although stainless 304 expands almost one and a half times as much as carbon steel. Another error is using the room-temperature CTE for a wide temperature span, where the coefficient rises. Finally, many forget that plastics absorb moisture and swell, which adds to thermal change. For critical work, measure at a controlled temperature rather than correcting by calculation.
Frequently Asked Questions
What is the CTE of aluminium compared to steel?
Aluminium 6061 is about 23.6 um/m per K, roughly twice carbon steel at about 11.7. A one metre aluminium bar warms and grows about 0.24 mm for a 10 K rise, against 0.12 mm for steel.
How do I calculate thermal growth?
Change in length equals CTE times original length times temperature change. With CTE in um/m per K, length in m and temperature in K, the result is in micrometres. Divide by 1000 for millimetres.
Why is Invar listed?
Invar 36 has an unusually low expansion near room temperature, about 1.3 um/m per K, so it is used for gauges, moulds and optical or measurement fixtures where dimensional stability matters more than strength or cost.
Are the plastic values reliable?
They are only typical. Fillers such as glass fibre can cut expansion a lot, and grades, moisture and temperature change the result. Use the resin supplier data sheet for design work.
If you want measured sizes, inspection temperatures and material data to sit together in your quality records, we can help wire that up from your ERP and inspection data.
Related Tools
Thermal Expansion Measurement Error Calculator
Find the measurement error caused by part and gage temperatures that differ from the 20 C reference, using each material's expansion coefficient.
Engineering & PLMMetric Bolt Property Class Reference (ISO 898-1)
Strength values for the common metric bolt property classes with a computed yield-to-tensile ratio.
Quality & InspectionRockwell Hardness Scales Reference
Lookup table of the common Rockwell scales with indenter type, minor load, total load and the materials each scale is normally used for.
Engineering & PLMPipe NPS Schedule 40 and 80 Dimensions and Weight Reference
NPS 1/2 to 12 with DN, outside diameter, Schedule 40 and 80 walls and calculated steel weight per metre.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
- Cloud MRP BOM Data Cleanup Worksheet
Keep exploring
Free tools
- Thermal Expansion Measurement Error CalculatorFind the measurement error caused by part and gage temperatures that differ from the 20 C reference, using each material's expansion coefficient.
- Spring Wire Material Properties ReferenceLook up shear modulus, elastic modulus, density and typical upper service temperature for common spring wire materials.
- Linear Thermal Expansion Calculator (Two Materials)Find how much a part grows between two temperatures, and how much two mating materials move relative to each other.