Thin Film Quarter-Wave AR Coating Calculator
A single quarter-wave layer is the simplest anti-reflection coating and the baseline against which multilayer designs are compared. This calculator gives the thickness to deposit and the reflectance you should measure at the design wavelength.
Your numbers
MgF2 is about 1.38 in the visible.
BK7 is about 1.519 at 550 nm; fused silica about 1.46.
Your results
Lossless, non-dispersive single quarter-wave layer at normal incidence. Broadband and angle performance needs multilayer design software.
Coated reflectance (%) vs coating index
Sweeps Coating refractive index from 1.1 to 2.6, holding your other inputs fixed.
Trace coating lots through your ERP
Optional expert review of how to link coating runs, witness samples and optic serial numbers.
Optional. The tool and every export work without this. No spam.
How to use the calculator
Enter the design wavelength, the coating material index, the substrate index and the incident medium, usually air at 1.0. The thickness output is the physical thickness for a quarter-wave optical thickness, which is the target for a quartz crystal or optical monitor. The two reflectance outputs let you see how much a single layer recovers. The sweep chart plots reflectance against coating index so you can see how close available materials come to the ideal index.
- Use indices measured at the design wavelength, not a nominal catalog value.
- Run the tool for each substrate material in your lot, since glass type changes the ideal index.
- Remember the result is per surface; a lens has two.
The physics
A film of optical thickness one quarter of the wavelength produces reflections from its two interfaces that are out of phase by half a wave. Complete cancellation requires equal amplitudes, which happens when the film index is the square root of the product of the incident and substrate indices. The residual reflectance with a quarter-wave film is ((n0 ns - n1^2) / (n0 ns + n1^2)) squared. Away from the design wavelength, reflectance rises, which is why multilayers are used for broadband.
Worked example
On BK7 glass with an index of 1.519, a bare surface reflects about 4.3 percent. A quarter-wave of MgF2 at 550 nm is about 99.6 nm thick and reduces the residual to approximately 1.3 percent per surface. The ideal index would be 1.23, which no durable dense film provides, which is why two- and three-layer designs exist. Higher index substrates such as SF11 get better results with MgF2 since their ideal index is higher.
Common mistakes
People often quote the physical thickness at normal incidence and then deposit onto steeply curved parts where the thickness varies across the surface. Another is neglecting that deposited films have lower packing density and index than bulk, shifting the result. Always correlate with a witness sample measured on a spectrophotometer, and record the monitor tooling factor and batch in your quality system with each coating lot.
Frequently Asked Questions
What is QWOT?
Quarter-wave optical thickness means the product of physical thickness and refractive index equals one quarter of the design wavelength. It is the building block of most optical coatings and sets the wavelength of minimum reflectance.
Why not use a coating with the ideal index?
Few durable materials have an index near 1.23 for glass. MgF2 at 1.38 is the common compromise. Porous or sol-gel films can approach lower indices, but durability and environmental stability become concerns.
Does this work for infrared?
The same formulas apply with the right indices and wavelength. Thicknesses are larger, and IR materials like ZnSe or germanium need their own index values. Enter the wavelength in nm, for example 10600 for CO2 laser optics.
How does angle of incidence change things?
At non-normal incidence the optical path through the film changes and the reflectance becomes polarization dependent. This calculator is for normal incidence only; use thin-film software for angled use.
If your coating lot records, witness sample data and rework history are scattered, Netray can help link them to your ERP lot traceability.
Related Tools
Fiber Coupling Efficiency and Mode Mismatch Calculator
Estimate how much laser or diode power couples into a single-mode fiber given mode field radii, lateral misalignment and one uncoated glass surface.
Industry TemplatesLaser Pulse Energy, Peak Power and Fluence Calculator
Turn average power, repetition rate, pulse width and spot size into pulse energy, peak power, peak fluence and peak irradiance.
Industry TemplatesFocused Laser Spot Size and Depth of Focus Calculator
Estimate the focused spot diameter and depth of focus of a laser through a lens, and compare against the diffraction-limited Airy disk.
More Industry Templates tools
See all- Gaussian Beam Spot Size and Rayleigh Range Calculator
- Beam Expander Magnification and Divergence Calculator
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
- Sheet Metal Cut List and Material Takeoff Worksheet
Keep exploring
Free tools
- Optical Coating Types and Performance ReferenceCompare common optical coatings by operating band, typical reflectance or transmission, strengths and limitations before you write a purchase spec.
- Coating Dry Film Thickness Measurement Log WorksheetLog DFT readings per spot, auto-calculate the average and minimum, and see the margin to the specified minimum thickness. Exports to Excel.
- Optical Coating Inspection ChecklistA 36-item checklist for incoming and final inspection of coated optics: paperwork, cosmetics, adhesion, spectral results, damage threshold and packaging.
Guides
- Optical Coating Cost Estimating for AR, HR and Bandpass CoatingsHow to estimate optical coating cost: chamber loading, layer count, deposition method, witness samples, rework risk and testing for AR, HR and filter coatings.
- ERP for Optics Manufacturers: What a Lens and Coating Shop Actually NeedsWhat an ERP must handle for optics makers: blank lot tracking, rework loops, coating batches, yield costing, metrology records and export-controlled parts.
- AI for Optics Manufacturers: Yield, Rework and RFQ TriagePractical AI uses for optics and photonics makers: yield analysis, rework patterns, RFQ triage and coating queues, run privately over ERP data.