Quality & InspectionFree checklistPDF, Excel, Word exportPhotonics and Lasers

Optical Coating Inspection Checklist (AR, HR and Filter Coatings)

Coated optics fail in quiet ways: a good-looking part with the wrong reflectance at the working angle, a coating that peels after cleaning, or a laser line coating that burns at half the expected fluence. This checklist walks through the paperwork, cosmetic, durability, spectral and laser damage checks that catch those problems at incoming or final inspection.

0%

0 of 36 items complete

9 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Documents and traceability

Cosmetic and visual inspection

Adhesion and durability

Spectral and optical performance

Laser damage and special requirements

Cleanliness, packaging and disposition

Mark each item as pass or not. Any critical item that fails should stop acceptance until the issue is resolved or a documented deviation is approved. Adapt limits and test methods to your drawing, specification and customer requirements.

Receiving inspection plan for optics in your ERP

Optional: an expert review of mapping these checks to inspection characteristics and lot records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work down the groups in order. Start with documents, since a wrong revision invalidates every measurement after it. Then do cosmetic inspection under controlled lighting, followed by durability checks on witness samples, spectral measurements against the drawing and any laser damage requirements. Tick each item as you go and note the disposition at the end. Items marked critical should hold the lot if they fail. Export the completed list to PDF or Excel and file it with the receiving or final inspection record.

  • Use the drawing as the source of limits, not memory
  • Record instrument IDs and calibration dates
  • Measure at the working angle and polarization, not just at normal incidence
  • Keep spectral plots with the record

Standards and methods behind the checks

Surface imperfections are specified as scratch and dig under MIL-PRF-13830B or the ISO 10110 part 7 system, and the drawing must say which. Coating durability tests such as the tape adhesion and moderate abrasion tests come from MIL-C-675C and MIL-C-48497A style practice and are often restated in company specifications. Laser-induced damage threshold testing follows the ISO 21254 series. Spectral performance is measured with a spectrophotometer using the calibration reference your quality system defines. Treat the standards as the structure of the check and use your own specification for the numbers.

What goes wrong in practice

Common problems are measuring at normal incidence when the part works at 45 degrees, where the polarization split is large, and accepting a certificate of conformance without a spectral plot. Another is inspecting under room light that hides haze. Cleaning with the wrong solvent or wiping a soft coating can damage it before the customer ever sees the part. Finally, a coating that passes at a witness position can differ from the production parts if the witness sat in a different place in the chamber.

Records and supplier feedback

Keep the completed checklist, the spectral plot and the lot number together so a field failure can be traced to a coating run. Feed rejects into supplier corrective action with the failing item, the measured value and photos of defects. Track the pass rate by supplier and coating design over time. In an ERP, the lot, inspection plan and nonconformance record are the natural anchors, and this checklist maps to the inspection characteristics on a receiving inspection plan.

Frequently Asked Questions

What does scratch-dig 60-40 mean?

It is a cosmetic grade under MIL-PRF-13830B: the first number is a scratch visibility rating compared against a standard, the second is the maximum dig diameter in hundredths of a millimeter. So 60-40 allows digs up to 0.4 mm. Lower numbers mean tighter cosmetics.

Why is the tape test performed on witness samples?

A tape pull can lift a weakly bonded coating and ruin the part. Testing a witness sample or a sacrificial piece from the same run shows adhesion quality without damaging shipping product.

Do I need LIDT data for every lot?

Usually not. LIDT is a destructive test and is typically qualified per coating design and process, then monitored by audit samples. Require it when the application is high-power, and require lot-level data only if your risk assessment says so.

Should reflectance be measured at normal incidence?

Measure at the angle of incidence and polarization the part will use. A coating that is excellent at 0 degrees can behave very differently at 45 degrees, especially for S and P polarization on beamsplitters and mirrors.

If coated optics arrive through your ERP receiving process, Netray can help connect inspection results, spectral files and supplier history to the lot, privately and on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring