Tooling and NRE Amortization Quote Worksheet
Tooling and non-recurring engineering are real cash that leaves before the first good part ships. This worksheet lists each item, takes off what the customer pays directly, and spreads the remainder over the pieces you expect to sell. Export to Excel to attach to the quote file.
| Item | Type | Total cost | Customer funded (%) | Pieces to amortize over | To recover in price | Per piece | |
|---|---|---|---|---|---|---|---|
$1,800 | 3.6 | ||||||
$7,250 | 1.45 | ||||||
$2,400 | 4.8 | ||||||
$0 | 0 | ||||||
$1,200 | 2.4 |
Per piece uses each line's own amortization quantity. If lines share one quantity, the sum of per piece charges is the NRE loading to add to each unit price. Revisit if the volume forecast is not firm.
Track tooling recovery against actual volume
Optional: see how ERP data can report NRE recovery by program.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per tooling or NRE item. Enter the full cost, the percentage the customer will fund as a separate line item or tooling purchase order, and the quantity over which you intend to recover the rest. The sheet computes the unrecovered amount and the per piece charge. Add the per piece total to your unit price, or show it as a separate tooling line. Be honest about the amortization quantity: use committed volume, not the optimistic forecast.
- Include programming and first article effort, not just physical tooling
- Set funded percent to 100 for fully customer-paid items
- Use one row per item so a change is traceable
The method behind it
Amortization here is straight-line by volume: unrecovered cost divided by planned pieces. It ignores interest, which is acceptable for short programs and understated for multi-year ones. For long programs add a cost of capital factor or shorten the recovery period. Tooling owned by the customer should not be amortized into your price at all, and the contract should say who owns it, who maintains it and what happens at end of life.
Reading the result
The customer funded share tells you how much risk you carry. In the example, roughly a third of the spend is covered, so the rest depends on volume materializing. If actual volume is half the forecast, the per piece recovery doubles and you absorb the difference. Compare the per piece total against your target margin: if it is more than a few percent of price on low volumes, ask for a tooling purchase order or a minimum order quantity.
Common mistakes
Leaving out maintenance and replacement of wear items such as dies and inserts, amortizing over a forecast the customer has not committed to, and burying NRE in margin so nobody can see it when the program is repriced. In an ERP, post tooling to a capital or work-in-process account consistently, and use a separate cost element for NRE so recovery can be reported.
Frequently Asked Questions
Should NRE be a separate line or built into piece price?
A separate line is clearer and protects you if the program is cancelled, because the customer has agreed to pay it. Building it into piece price is simpler for the buyer but leaves you exposed if volume falls short.
What quantity should I amortize over?
Use committed volume or a conservative portion of the forecast. Amortizing over the optimistic forecast makes the quote look better but leaves unrecovered cost if the program underdelivers.
Who owns tooling the customer paid for?
That is a contract matter. Commonly the customer owns fully funded tooling and you hold it for their use. Put ownership, maintenance and return terms in writing. This worksheet is not legal advice.
Does this include interest on tooling spend?
No. It is straight-line by volume. For multi-year programs add a financing factor to the recovered amount, or shorten the recovery period so the carrying cost is covered.
If tooling and NRE live in several spreadsheets, we can help pull actual program spend from your ERP so recovery is tracked against what you quoted.
Related Tools
Quote Assumptions and Exclusions Template
A fill-in page that states what a manufacturing quote includes, what it assumes and what it leaves out, ready to attach to the price.
Costing & FinanceSubcontract and Outside Processing Cost Worksheet
Cost each outside operation with price per piece, vendor minimum charge and freight, and see the true cost per part.
Costing & FinanceJob Shop Setup Cost Per Piece Calculator
See how setup hours, run time, material and margin combine into a per-piece cost and price, and how it falls as the lot size grows.
Costing & FinanceEstimate Review and Approval Form Template
A one-page gate that records cost, margin, risks and approvals before a manufacturing quote is released.
More Costing & Finance tools
See all- Manufacturing KPI Formula and Definitions Reference
- Manufacturing Cost Variance Types Reference
- Price, Volume and Cost Margin Variance Calculator
- Month End Reporting Readiness Checklist for Manufacturers
- OEE Improvement Value Calculator
- Improve OEE vs Buy a New Machine Calculator
- Six Sigma Project Savings Tracker Worksheet
- Should Cost Model Worksheet for Machined Parts
- Overhead Cost Pool Allocation Worksheet
Keep exploring
Free tools
- Tooling and NRE Amortization Per Piece CalculatorAmortize tooling and NRE over lifetime volume, add financing, and see the effect on piece price at different volumes.
- Tooling Cost Amortization Per Piece Price CalculatorCompare paying for tooling up front with amortizing it into the piece price, including interest, and find the volume at which the two options cost the same.
- PCBA NRE and Stencil Amortization Per Unit CalculatorAmortize stencil, programming, fixture and DFM NRE plus line setup and first article time over your order size, then see loaded cost, quoted unit price and how much of the price is one-time cost.
Guides
- Pricing Composite Tooling: Mold Cost, Life and NRE in the QuoteHow to price composite tooling in a quote: NRE versus amortization, mold life by tool material, repair and rework, and how to protect margin on small runs.
- Forging Die Cost Amortization: How to Price Tooling Into a QuoteHow forge shops price die cost into quotes: amortize over committed quantity, build in rework and resink, and decide when the customer owns the tooling.
- Where EMS Quotes Lose Margin: NRE, Overage and Excess MaterialThe hidden margin leaks in EMS and PCBA quoting: unbilled NRE, overage, leftover reels, expedites, rework, and how to find them in your closed jobs.