Estimate Review and Approval Form Template

A quote is a commitment, and most bad ones are not caught because nobody looked at them together. This form puts cost, margin, risks and approvals on one page so a second person can review before release. Fill it in and export a PDF or Word copy.

Fill in

Live preview
Download:

Estimate Review and Approval Form Template

Estimate Review and Approval

Quote: Q-26-1184 Customer: Northfield Aerostructures Part: BRK-4410 Rev C Estimator: R. Mehta Date: 2026-10-20

Financial summary

MeasureValue
Total estimated cost48500
Proposed price61200
Gross margin percent20.8
Policy minimum margin percent18

Risks and mitigations

Tight flatness tolerance may raise scrap. Aluminum plate price exposed for 30 days. Outside anodize lead time of 5 days not confirmed.

Review checks

CheckDoneComment
Drawing revision and specs confirmed
Routing, setup and run times checked
Material and outside process prices current
Capacity and lead time confirmed
Assumptions and exclusions page attached

Recommendation

Release as quoted

Approvals

Estimator / Date
Operations or engineering / Date
Sales manager / Date
Controller (if below policy margin) / Date

This is a general internal form. Adapt thresholds to your own approval policy. If your quality system requires a contract review record, check that the fields cover what your standard asks for.

Flag low-margin quotes before they go out

Optional: see how margin checks can run against ERP estimates with human approval.

Optional. The tool and every export work without this. No spam.

How to use the form

The estimator fills the header and financial summary from the estimate, then writes the real risks, not generic ones. Reviewers tick the checks, add comments and sign. Route to the controller only if margin falls below policy. Keep the signed copy with the quote file. The decision field forces a clear recommendation: release, release with changes, escalate or decline. A declined quote with a reason is useful data too.

  • Use the same form for every quote above a set value
  • Attach the assumptions and exclusions page
  • Record who approved, not just that it was approved

What the review should test

Reviewers should test the inputs that drive cost, not re-estimate everything. Are the setup and run times consistent with similar jobs? Are material and outside processing prices current? Is capacity real in the weeks promised? Does the margin meet policy after allowing for scrap and rework? Margin here is gross margin: (price minus cost) divided by price, which is not the same as markup on cost. Mixing the two is a common source of underpriced work.

Reading the margin

In the example, cost of 48,500 and price of 61,200 gives a gross margin of about 20.8 percent, above the 18 percent floor. That passes policy but the risk text matters: if scrap runs higher than assumed, the margin may fall below the floor. Reviewers should ask what scrap rate the estimate carries and whether the risk justifies a contingency or a higher price.

Common mistakes

Approving on margin alone, skipping capacity checks, relying on a verbal OK, and not storing the form where order entry can find it. For regulated customers, contract review may be a quality system requirement, so check your standard. Where possible, link the form number to the quote in the ERP so approvals are traceable when the job is audited or repriced.

Frequently Asked Questions

Who should approve a manufacturing quote?

At minimum the estimator and a second reviewer from operations, engineering or sales. Add a controller or manager when margin is below policy or value exceeds a set threshold. Define the thresholds in writing.

What is the difference between margin and markup?

Margin is profit divided by price. Markup is profit divided by cost. A 25 percent markup equals a 20 percent margin. Use one consistently on the form, and say which, so approvers read it correctly.

Is this form a contract review record?

It can support one, but check your quality standard for required content. Aerospace and automotive customers often expect documented review of requirements and capability. Add fields your standard requires.

Should declined quotes use the form?

Yes, a short entry. Recording why you declined, such as capacity or margin, helps you spot patterns in lost work and tune pricing and capacity planning.

If you want approvals routed and recorded inside your ERP, we can help set up a read-only margin check that flags quotes under policy before release.