Migrating materials management into Navision: what drives the cost
Migrating materials management into Navision usually means moving a site or company off SAP MM or a legacy MRP system into Dynamics NAV or, more sensibly today, Business Central. The cost is driven by mapping, not loading: SAP plants, storage locations, material types, valuation and purchasing info records do not map one-to-one to NAV locations, bins, item categories, costing methods and item vendor records. Settle those mapping decisions early and the load itself is a few days of work.
When this makes sense
- A subsidiary is leaving its parent's SAP instance and moving to NAV or Business Central.
- You acquired a company on a legacy MRP and want its materials data in your Navision.
- You already run NAV and are adding a new site whose materials data lives elsewhere.
- You were quoted for an MM to Navision migration and want to understand the effort.
What the engagement covers
Target decision
Confirm whether the target is your existing NAV or Business Central, since NAV 2018 is the last NAV release and new migrations into NAV add a future upgrade.
Material master mapping
Map SAP material master views (general, plant and storage location data) or legacy item records to the NAV item table, item units of measure, item categories, stockkeeping units and item tracking codes.
Organizational structure mapping
Map SAP plants and storage locations or legacy warehouses to NAV locations and, where used, bins and warehouse setup.
Valuation and costing
Translate moving average or standard price valuation into NAV costing methods (Average, Standard, FIFO), set standard costs where needed and agree how opening inventory value is posted.
Vendor and purchasing data
Migrate vendors with payment terms and bank details, item vendor and purchase price records from purchasing info records, and open purchase orders with outstanding quantities.
Opening balances
Load on-hand quantities by location, bin, lot and serial number through item journals, and reconcile quantity and value with the source system.
Load tooling
Use configuration packages (RapidStart) in NAV 2013 and later or Business Central, XMLports or Excel templates, with validation reports before posting.
How it runs
- 1
Mapping and cleansing (2-4 weeks)
- Extract materials, vendors, stock and open POs
- Agree mapping rules for structure, units and valuation
- Cleanse duplicates and obsolete materials
- Sign off mapping document
- 2
Build and trial loads (2-4 weeks)
- Build configuration packages or scripts
- Run trial loads into a test company
- Reconcile quantities and values
- Fix mapping gaps
- 3
Cutover (1-2 weeks)
- Freeze source transactions
- Final extract and load
- Post opening balances
- Reconcile and sign off
What you get
- Mapping document for structure, items, units, valuation and vendors
- Cleansed and transformed load files
- Configuration packages or load scripts
- Trial load reconciliation reports
- Opening balance journal and final reconciliation sign-off
What drives cost and effort
| Number of active materials | More items mean more cleansing and validation; purging obsolete materials before migration is the cheapest saving. |
| Structure complexity | Many plants and storage locations, or a move to bins in NAV, need more mapping and setup. |
| Unit of measure conversions | Material-specific alternative units and conversion factors must be carried into item units of measure correctly. |
| Batch and serial management | Tracked materials need item tracking codes and lot or serial level opening balances. |
| Valuation method change | Moving from moving average to standard cost, or the reverse, needs finance decisions and revaluation planning. |
| Open documents | Migrating open purchase orders and partial receipts adds effort compared with closing them in the source system first. |
| History requirements | Migrating purchase or movement history is expensive; most projects archive it and migrate only open items and balances. |
Fixed-price migration after mapping
Projects where the data volume and mapping decisions are known.
Time and materials
Messy legacy data or carve-outs where scope becomes clear only during extraction.
Migration support to an internal team
Companies with a capable NAV admin who need help with mapping rules and reconciliation.
Questions to ask any Microsoft Dynamics NAV consultant
Should we migrate into NAV or Business Central, and why?
Migrating into NAV now adds a later upgrade; the answer should consider your timeline and licensing.
How will you map plants, storage locations and units of measure?
Structure and unit mapping cause most errors in MM to NAV migrations.
How will you translate our valuation method into NAV costing?
Costing method choices affect inventory value and margins from day one.
What will you reconcile, and who signs off?
Quantity and value reconciliation by location is the proof the migration worked.
What history do you recommend migrating?
History is expensive to migrate; a clear recommendation saves money.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Inventory value mismatch after load
Reconcile quantity and value by location and item category before and after posting opening balances.
Unit of measure errors in purchasing
Test purchase orders and receipts with alternative units in the trial load.
Duplicate items and vendors
Cleanse and deduplicate in the source extract before loading.
Costing method chosen without finance input
Have finance approve costing methods per item group before the trial load.
If the materials data set is small and clean, a capable NAV or Business Central admin can load it with configuration packages and Excel in a few days. A consultant adds value when there are many plants, tracked items, valuation changes or tight cutover windows. If you are still choosing between NAV and Business Central as the target, settle that first.
Frequently asked questions
What does MM mean here?
MM usually refers to materials management, most often the SAP MM module, covering material master, purchasing, inventory management and valuation. The same approach applies to materials data from any legacy MRP system.
Can we migrate directly from SAP MM into NAV?
There is no standard connector. Data is extracted from SAP tables or reports, transformed to NAV structures and loaded with configuration packages, XMLports or scripts.
Should we migrate into NAV or Business Central?
For new migrations, Business Central is usually the better target because NAV 2018 was the last NAV release. If you must load into an existing NAV, plan the later upgrade at the same time.
How long does a materials migration take?
Commonly four to ten weeks including mapping, trial loads and cutover, depending on item count, structure and tracking requirements.
Can AI speed up materials data mapping?
Yes. AI agents can propose mappings for units, categories and descriptions, flag likely duplicates and draft validation checks. Netray uses this approach with people approving every mapping rule.