Microsoft DynamicsFree worksheetPDF, Excel, Word exportMicrosoft Dynamics 365 Business CentralAll Microsoft Dynamics NAV and Business Central on-prem tools

Business Central Data Migration Field Mapping Worksheet

A mapping sheet is the first document a Business Central migration lives or dies by. This worksheet gives you one row per legacy field, the BC table and field it lands in, the rule you will apply and how clean the data is today. Edit it in the browser and export to Excel.

Free, optional. Reopen it on any device.
Download:
Source table / fileSource fieldBC tableBC fieldTransformationRecordsClean %Ready to loadOwner
1,795
1,332
582
4,316
420
171
Total field records
10,270
Total ready to load
8,615
Overall data readiness
83.9%
Weighted share of mapped records that already pass validation
Mapped fields
6

Add one row per field you plan to load. Records are counted per field so weak fields stand out. Export to Excel and share with the data owners listed in the Owner column.

Mapping sheet review

Send us your exported mapping sheet and we will point out missing dependencies and risky fields. Optional.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the worksheet

Start with the master data that everything else depends on: customers, vendors, items, the chart of accounts and dimensions. For each legacy field add a row, choose the target BC table, and type the target field name as it appears in the BC page or in the configuration package field list. Pick the transformation type, then record how many records exist and what share passes your validation rules. The ready-to-load column and the overall readiness figure update as you type.

  • One row per field, not per table, so weak fields are visible
  • Use Lookup / cross-reference for anything that needs a BC code to exist first, such as payment terms or posting groups
  • Assign every row an owner who can fix the source data

What good mapping looks like

Business Central requires that referenced setup records exist before the master data that uses them. Payment terms, units of measure, posting groups, countries and dimension values must be loaded or configured first, or the import of customers, vendors and items fails on validation. Sort your sheet by load sequence, not alphabetically, and add the dependency to the Transformation or Owner text. Keep the numeric key rules explicit: BC number series, code length limits such as 20 characters for many code fields, and case handling all affect legacy IDs.

Reading the readiness figure

Overall readiness is the sum of ready records divided by the sum of records across all rows. It is weighted by volume, so a field with thousands of records drags the figure more than a small table. Treat anything below roughly 80 percent as a signal to schedule a cleansing sprint before the first trial load. A high figure does not prove correctness; it only says records pass the rules you wrote down.

Common mistakes

Teams often map only the visible fields and discover mandatory ones during the first import. Check required fields on each BC page and any extension fields your partner has added. Another frequent gap is ignoring open transactions: balances, open sales and purchase documents, inventory by location and bin, and fixed asset depreciation books each need their own mapping rows and a reconciliation plan.

Frequently Asked Questions

Should I map into configuration packages or use Excel and the Edit in Excel feature?

Configuration packages suit larger first loads of master data across several tables, with validation and error reporting. Edit in Excel suits small corrections to existing records. Many partners use packages for cutover and Excel for cleanup. This sheet works for either approach.

How many fields should a typical BC mapping sheet include?

It depends on scope, but master data alone for customers, vendors, items and accounts often reaches 100 to 300 mapped fields once extensions and dimensions are included. Start with required fields and the fields that drive posting, then add reporting fields.

Does the worksheet connect to my BC environment?

No. It runs entirely in your browser and nothing is sent anywhere. You export the sheet to Excel and use it as a planning and tracking document alongside your own configuration packages or load tools.

How do I handle data that does not fit any BC table?

Choose Other as the BC table, describe the intended handling in the BC field column, and decide whether it needs an extension field, an attachment, a dimension or should be archived outside the system. Record the decision so it is not lost.

If your source is NAV, SyteLine, Epicor or a spreadsheet estate, Netray can help profile the data and build repeatable load scripts under human review. Ask for a review of your mapping sheet.

Get Microsoft Dynamics NAV and Business Central on-prem alerts

Support and maintenance deadlines, release changes that affect Microsoft Dynamics NAV and Business Central on-prem sites, and new free Microsoft Dynamics NAV and Business Central on-prem tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Microsoft Dynamics NAV and Business Central on-prem: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Microsoft Dynamics NAV and Business Central on-prem? Start with the Microsoft Dynamics NAV and Business Central on-prem guide and toolkit.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Comparisons

Software