Infor ecommerce integration: syncing products, prices, stock and orders
Connecting a webstore or B2B portal to Infor CloudSuite means syncing products, customer-specific prices and available stock out of the ERP, and bringing orders, payments and returns back in. The hardest parts are usually pricing and availability, not order import. Decide early whether you use an Infor commerce product, a packaged connector for your platform or a custom build on ION and APIs.
When this makes sense
- Your B2B customers want to see their own prices and order online instead of emailing purchase orders.
- Webstore orders are re-keyed into SyteLine, M3 or LN.
- Online stock levels are wrong and you oversell or show items as unavailable.
- You are launching a new storefront and the ERP link must be designed.
- Returns and refunds from the webstore are handled outside the ERP.
What the engagement covers
Product and catalogue sync
Publish items, descriptions, units of measure, attributes and images from the ERP or a PIM to the storefront.
Pricing
Expose list, contract and quantity-break prices for logged-in B2B customers, either by syncing price lists or calling the ERP pricing logic in real time (for example M3 pricing through MI APIs or SyteLine price calculations through IDO calls), with caching to protect the ERP.
Availability
Publish available-to-promise or on-hand less allocations by warehouse, with safety buffers and update frequency matched to volume, and decide how Infor WMS or Factory Track allocations feed the number.
Order import
Create ERP sales orders from web orders with customer, ship-to, tax, freight and payment references, using ProcessSalesOrder BODs through ION, M3 OIS100MI or SyteLine IDO requests, and write the ERP order number back to the storefront.
Customer accounts
Link web logins to ERP customers and ship-tos, show order history, open invoices and statements, and decide whether new web customers are created automatically or reviewed first.
Fulfilment and status
Send shipment confirmations, tracking numbers and invoices back to the storefront and customer account.
Returns and credits
Map web returns to RMAs and credit memos in the ERP.
How it runs
- 1
Discovery (1-3 weeks)
- Map catalogue, pricing and order processes
- Pick integration approach
- Measure volumes
- 2
Design (1-3 weeks)
- Field mappings and pricing rules
- Availability calculation
- Error handling
- 3
Build (4-10 weeks)
- Catalogue and price sync first
- Then orders and status
- Then returns
- 4
Test and launch (2-4 weeks)
- End-to-end order tests
- Load test pricing calls
- Launch with monitoring
What you get
- Integration design and field mappings
- Pricing and availability rules document
- Built and tested flows
- Monitoring and exception handling
- Runbooks
What drives cost and effort
| Pricing complexity | Customer-specific and contract pricing needs real-time calls or large price syncs, which adds design and testing. |
| Catalogue size and attributes | Large catalogues with variants need a PIM or careful sync design. |
| Order volume | High volumes need queuing and batch design. |
| Platform choice | Packaged connectors reduce build but may not cover all rules. |
| Returns process | Automating returns adds flows and test cases. |
Fixed-scope integration
Standard B2C or simple B2B stores with clear flows.
Phased time and materials
B2B portals with complex pricing added over time.
Managed integration support
Teams without integration staff.
Questions to ask any Infor CloudSuite consultant
Which Infor ERP and storefront platform have you connected?
The combination determines available APIs and connectors.
How will customer-specific pricing be shown?
Pricing is the most common failure point.
How is availability calculated and how often updated?
Wrong stock causes overselling or lost sales.
What happens when an order fails to import?
You need a visible queue and retry.
Who supports the integration after launch?
Both platforms update regularly.
Score candidate partners side by side with the free Implementation Partner Scorecard
Where these projects go wrong
Overselling from stale stock.
Use buffers and frequent updates for fast movers.
Wrong prices online.
Test pricing for real customer scenarios before launch.
Duplicate orders.
Use web order numbers as idempotent keys.
Tax mismatches.
Decide which system calculates tax and keep one source.
If you have low volume, a simple order export and manual entry may be enough for a while. Infor offers commerce options for some CloudSuites, which may fit better than a custom build. Check those first.
Frequently asked questions
Does Infor have its own ecommerce?
Infor has offered commerce products for some of its ERPs. Check current options with Infor for your CloudSuite before choosing a third-party platform.
Should pricing be synced or called in real time?
Small price lists can be synced. Complex customer-specific pricing is often better called in real time or cached with short expiry.
Can ION handle ecommerce orders?
Yes, ION can route orders as BODs or through APIs, but storefront connectors and volume affect the design.
How long does it take?
Simple integrations take weeks; complex B2B portals take a few months.
Where does Netray help?
Netray engineers, with partner Infor experts, design and build integrations and use AI agents to check mappings and generate test cases.