Infor M3 & CloudSuiteFree referencePDF, Excel, Word exportInfor Factory TrackAll Infor SyteLine (CloudSuite Industrial) tools

Infor Factory Track Warehouse Mobility and Time Track Transaction Reference (CSI / SyteLine)

A searchable reference of Infor Factory Track Warehouse Mobility transactions for CloudSuite Industrial and SyteLine, plus the main Time Track functions. For each transaction it shows what the user scans, what the transaction does, what must be set up first and the mistake that most often causes inventory or cost errors.

Download:
ModuleTransactionUser scans or entersWhat it doesPrerequisitesCommon gotcha
Warehouse Mobility
Purchase Order Receipt
PO or GRN number, line, item, quantity, location, lot or serial
Receives material against purchase orders or GRNs, with optional one-step put away
Released PO lines; receiving location set up
Receiving to a dock location without a later Putaway leaves stock in the wrong place
Warehouse Mobility
Putaway
Item or container, from and to location
Puts received items away separately, suggesting locations where the item already exists
Stock in a receiving or staging location
Skipped when one-step put away was used on receipt
Warehouse Mobility
Transfer Order Receipt
Transfer order, line, quantity, location
Receives items from transfer orders, with optional one-step put away
Shipped transfer order lines
Receiving before the shipping transaction is posted
Warehouse Mobility
Transfer Order Shipping
Transfer order, line, quantity, location
Ships items between sites or warehouses
Transfer order with available stock
Lot and serial must be scanned for tracked items
Warehouse Mobility
Job Material Issue
Job, operation, item, quantity, location, lot or serial
Picks and issues raw material to a job from the BOM, outside the BOM, or from containers
Released job with material requirements
Issuing outside the BOM changes job cost; check it is intended
Warehouse Mobility
Job Material UnIssue
Job, item, quantity, return location
Returns unconsumed issued material to a stock location
Material previously issued to the job
Use it instead of a miscellaneous receipt so job cost is reversed
Warehouse Mobility
Work Center Material Issue
Work center, item, quantity, location
Issues material to work centers or recalls previously issued material
Work center set up for material issue
Not tied to a specific job; costs follow work center rules
Warehouse Mobility
Project Material Issue
Project, task, item, quantity, location
Issues project material, similar to Job Material Issue
Project with material requirements
Use the shop floor variant only where the Shop Floor module is in use
Warehouse Mobility
Job Receipt
Job, operation, quantity, location, lot or serial
Reports quantities produced against a job, optionally printing labels
Job at its last operation or receiving operation
Printer not set for the session; use Change Printer first
Warehouse Mobility
WIP Move
Job, operation, quantity
Moves completed items to the next operation; can complete operations, close jobs and combine put away
Job operations defined
Closing the job here stops further postings to it
Warehouse Mobility
JIT Production
Item, quantity, location
Reports production for just-in-time items, optionally with put away
JIT production set up for the item
Backflush of components depends on item setup
Warehouse Mobility
Production Schedule Reporting
Production schedule, item, quantity
Reports production for repetitive manufacturing using production schedules
Production schedules in use
Not for discrete jobs; use Job Receipt there
Warehouse Mobility
Stock Move
Item, from location, to location, quantity, lot or serial
Moves material between locations within a warehouse
Stock at the from location
Moving reserved stock can break a staged pick
Warehouse Mobility
Multi-Site Move
Item, from and to warehouse, quantity, lot or serial
Moves inventory between warehouses, supporting lot and serial control
Both warehouses set up
Check the target site is the intended one before posting
Warehouse Mobility
Quantity Adjustments
Item, location, new quantity, reason
Adjusts an item quantity at a location with a reason code
Reason codes defined
Adjustments skip the count process; use Cycle Count for routine corrections so variances stay reviewable
Warehouse Mobility
Miscellaneous Issue
Item, location, quantity, reason code, document number
Issues items for a miscellaneous reason
Reason codes defined
Using it to correct job issues hides cost from the job
Warehouse Mobility
Miscellaneous Receipt
Item, location, quantity, reason code, document number
Receives items for a miscellaneous reason
Reason codes defined
Value comes from item cost; check cost before receiving
Warehouse Mobility
Cycle Count
Count sheet, location, item, counted quantity
Counts items in locations from generated cycle count sheets, with optional forced re-entry
Cycle count sheets generated
Moving stock during an open count creates false variances
Warehouse Mobility
Cycle Verify
Location, item, recount quantity
Lets supervisors review mismatches or uncounted items and recount
Cycle count with variances
Post variances only after the recount
Warehouse Mobility
Physical Inventory By Sheet
Inventory sheet, location, item, quantity
Counts items using inventory sheets or verifies prior counts
Physical inventory sheets generated
Freeze transactions during the count
Warehouse Mobility
Physical Inventory By Tag
Tag number, item, location, quantity
Counts items using inventory tags
Tags generated and printed
Account for every tag, including unused ones
Warehouse Mobility
Customer Order Picking
Order, line, item, quantity, location
Reserves reservable items and moves them to the staging location
Staging location defined
Ship with Customer Order Shipping, not Pick N Ship
Warehouse Mobility
Customer Order Shipping
Order or container at staging
Ships reserved items that are at the staging location
Items picked to staging
Only staged, reserved items can be shipped
Warehouse Mobility
Pick N Ship
Order, line, item, quantity, location
Picks and ships customer order lines from regular locations in one step
Order lines with stock
Works for reservable and non-reservable items; no staging step
Warehouse Mobility
PPS Picking / PPS Packing / PPS Shipping
Pick list, item, quantity, package
Pick, pack and ship by pick list
SyteLine Pick, Pack, and Ship in use
Mixing PPS and standard picking on the same orders
Warehouse Mobility
Build Container
Container, items, quantities
Adds items to new or existing containers
Container setup and labels
Moving loose items that belong in a container
Warehouse Mobility
Empty Container
Container, items
Removes items from containers
Existing container
Relabel loose items afterwards
Warehouse Mobility
Item Inquiry / Location Inquiry / Container Inquiry
Item, location or container
Read-only views of on-hand, reserved and container quantities, lots and locations
None
Use before moving stock to avoid touching reserved quantity
Warehouse Mobility
Change Printer / Change Warehouse
Printer or warehouse
Temporarily changes the printer or warehouse for the current session
Printers and warehouses defined
Check the current printer before Job Receipt or PO receipt labels print in the wrong area
Warehouse Mobility
Label Reprint
User, transaction, label, printer, item or request ID
Reprints barcode labels
Label printing configured
Reprinting a serial label creates duplicates on the floor
Warehouse Mobility
Labor Reporting
Employee, job or order, operation
Starts and stops employee work on jobs, projects and service orders
Employees linked to users
If Time Track also records labor, choose one so hours are not booked twice
Warehouse Mobility
Device Allocation
Device, employee
Issues and returns devices
Devices registered
Unreturned devices at shift end are hard to trace without it
Time Track
Attendance (clock in and out, breaks)
Badge or employee ID
Records attendance time for payroll and labor reconciliation
Employees, shifts and pay rules set up
Shift and rounding rules decide paid time; test overnight shifts
Time Track
Job and indirect time
Badge, job operation or indirect code
Records time on production and indirect work for job costing
Indirect codes defined
Overlapping open jobs split time; check the split rule

Warehouse Mobility transaction names follow the Factory Track CSI Warehouse Mobility user guide (Using Warehouse Mobility on a Mobile Scanner). Time Track rows describe functional areas; exact menu labels depend on your release and configuration, so check the Infor Factory Track for CSI Time Track User Guide. Kanban, QCS and SRO transactions also exist and require the related modules.

Get scanner work instructions for your site

Tell us which Factory Track transactions each role uses and we will return a one-page scanner instruction per role, matched to your locations and labels.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by transaction name or by what you are trying to do: receive, issue, move, count, ship. Use the table to write scanner work instructions, to train new warehouse staff, or to decide which transaction to give each role on its scanner menu. Export to Excel and add columns for your own site: which users get the transaction, which label prints, which location type is involved. When a user reports a wrong stock figure, the gotcha column usually points to the transaction that caused it.

  • Give each role only the transactions it needs on its menu.
  • Train with real barcodes in a test environment, not screenshots.

How Factory Track relates to CSI

Factory Track runs alongside CloudSuite Industrial and posts the scanned transaction into CSI in real time, so a Job Material Issue on the scanner appears as an issue against the job material in CSI, and a Purchase Order Receipt appears as a receipt on the PO line. The CSI forms remain the system of record. Warehouse Mobility covers receiving, inventory, counting, picking, shipping and production reporting; Time Track covers attendance and labor; the Shop Floor module adds Kanban and shop floor transactions. Some transactions, such as the PPS ones, require the matching CSI functionality to be enabled.

Picking and shipping: three different flows

Customer Order Picking reserves items and moves them to a staging location; Customer Order Shipping then ships only those reserved, staged items. Pick N Ship does both in one step from regular locations and handles reservable and non-reservable items. The PPS transactions follow SyteLine Pick, Pack, and Ship with pick lists, packing and shipping. Pick one flow per warehouse or customer type and stick to it. Mixing them on the same orders is the common cause of shipments that look picked but never ship, or stock reserved at staging that nobody can find.

Production transactions and job cost

Job Material Issue, Job Material UnIssue, WIP Move and Job Receipt drive job cost in CSI. Return unused material with Job Material UnIssue rather than a Miscellaneous Receipt, or the job keeps the cost of material it did not use. Issuing outside the BOM is allowed and changes job cost, which is correct for substitutions and wrong for mistakes. WIP Move can complete operations and close the job; closing too early blocks later postings. If both Labor Reporting and Time Track record labor, decide which one books job hours so the same time is not posted twice.

Frequently Asked Questions

What is Infor Factory Track Warehouse Mobility?

It is the barcode scanning module of Infor Factory Track. Warehouse staff use handheld scanners or the Android app to receive, move, count, pick, ship and report production, and each transaction posts to CloudSuite Industrial (SyteLine) or LN in real time.

What is the difference between Pick N Ship and Customer Order Shipping?

Customer Order Shipping ships items already reserved and moved to a staging location by Customer Order Picking. Pick N Ship picks and ships order lines in one step from regular locations, without a staging step, for both reservable and non-reservable items.

How do I return material issued to a job in Factory Track?

Use Job Material UnIssue. It returns unconsumed issued material to a stock location and reverses the issue against the job. Avoid Miscellaneous Receipt for this, because it leaves the cost on the job and records a receipt with no link to it.

Does Factory Track replace CSI forms?

No. Factory Track gives scanner and kiosk transactions for floor and warehouse users, and posts them into CSI. Planning, setup, costing, inquiries and corrections that need full context are still done in CSI forms by office users.

If you want supervisors to ask what was received, issued or counted today in plain English across Factory Track and CSI, we can add a private AI layer on your own servers.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Runs with your ERP

Guides