Infor WMS integration with ERP and warehouse automation

An Infor WMS integration has two sides: upstream with the ERP (items, purchase receipts, sales orders, shipments and inventory adjustments, usually over ION BODs) and downstream with automation such as conveyors, sorters, AS/RS or robots through a warehouse control system. Most of the risk sits in timing and exception handling, not in the message formats.

When this makes sense

  • Distributors and manufacturers adding Infor WMS beside SyteLine, LN or M3
  • Warehouses adding conveyors, sortation, AS/RS or mobile robots that must take tasks from the WMS
  • Teams whose inventory differs between ERP and WMS every week
  • Companies replacing a legacy WMS interface written as flat files or database triggers
  • Sites deciding between Infor WMS and Factory Track warehouse mobility

What the engagement covers

ERP to WMS master data

Sync items, units of measure, lot and serial rules, customers, suppliers and carriers from the ERP to Infor WMS, with clear ownership of storage attributes such as dimensions and handling classes.

Inbound flow

Send expected receipts from purchase orders and transfers, receive confirmations back with quantities, lots and discrepancies, and post them to the ERP.

Outbound flow

Release sales orders and transfer orders to the WMS for waves, picking and packing, and return shipment confirmations with tracking so the ERP can invoice.

Inventory synchronization

Handle adjustments, cycle counts, holds and quality status changes, plus a scheduled reconciliation to catch drift between systems.

Automation and WCS interface

Define task messages to conveyors, sorters, AS/RS or AMR fleets through a WCS or WES: pick tasks, container moves, confirmations, faults and recovery when equipment is down.

Labels, parcel and carriers

Integrate label printing and parcel carrier rating and manifesting, either from the WMS or a shipping system.

Monitoring and replay

Use ION Desk monitoring or the chosen middleware to surface failed BODs, with documented steps to correct and replay.

How it runs

  1. 1

    Process and interface design (3-5 weeks)

    • Map inbound, outbound and inventory flows end to end
    • Define message timing and triggers
    • Document automation task and confirmation messages with the equipment vendor
  2. 2

    Build and configure (6-12 weeks)

    • Configure ION connection points and document flows
    • Build mappings for non-standard fields
    • Develop WCS interface with the automation integrator
  3. 3

    Integration testing (3-6 weeks)

    • Run volume tests at peak wave sizes
    • Simulate equipment faults and network outages
    • Reconcile inventory between ERP and WMS after each cycle
  4. 4

    Cutover (1-3 weeks)

    • Load opening inventory by location
    • Freeze and count before switching
    • Provide hypercare on the warehouse floor

What you get

  • Interface catalog with each BOD or API, direction, trigger and owner
  • Field mappings for items, orders, receipts, shipments and adjustments
  • WCS interface specification agreed with the automation vendor
  • Exception handling and replay run book
  • Volume test results at peak conditions
  • Daily inventory reconciliation report between ERP and WMS

What drives cost and effort

Automation scopeEach piece of material handling equipment adds task, confirmation and fault messages, plus joint testing with its vendor.
Volume and wave sizeHigh order counts need performance testing and careful batching of messages to avoid backlogs in ION.
Lot, serial and quality controlLot traceability, expiry and quality holds add fields and rules to every inbound and inventory message.
ERP customizationsCustom order types or statuses in the ERP must be mapped and retested at each update.
Number of sitesEach warehouse can bring different equipment, carriers and processes, multiplying test cycles.
Middleware choiceUsing ION with standard BODs is usually lower effort than custom file interfaces or adding another middleware layer.

Fixed-scope ERP to WMS integration

Standard inbound, outbound and inventory flows using supported BODs with few customizations.

Time and materials with a cap

Projects including automation and WCS links, where equipment vendor timelines create unknowns.

Managed integration support

Warehouses that need someone watching failed messages and reconciling inventory daily after go live.

Questions to ask any Infor CloudSuite consultant

Which Infor WMS and ERP combination have you integrated, and with which BODs?

Messages and patterns differ between SyteLine, LN and M3; you want proven flows for your pair.

How do you coordinate with our automation integrator?

WCS interfaces fail at the boundary; someone must own joint design and testing.

How will you test peak volumes and equipment faults?

Integration that works at low volume often backs up during real waves.

What is your approach to daily inventory reconciliation?

Drift between ERP and WMS is inevitable; detecting it early prevents large write-offs.

Should we use Infor WMS or Factory Track for our warehouse?

A neutral partner should size the solution to your complexity rather than default to the bigger product.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Inventory drift between ERP and WMS

Run automated daily reconciliation by item and location, and investigate differences before they compound.

Messages back up during peak

Volume-test at realistic wave sizes and tune batching and ION processing before go live.

Equipment faults strand orders

Design manual fallback processes and recovery messages with the automation vendor.

Shipments not invoiced

Monitor shipment confirmations that fail to post and alert finance and warehouse leads the same day.

If your warehouse is a single site with simple picking and no automation, Factory Track warehouse mobility or the ERP's own warehousing with barcode scanning may be enough, without a full WMS integration. Infor's standard BOD-based flows also cover many cases, so start from them before paying for custom interfaces.

Frequently asked questions

How does Infor WMS connect to Infor ERPs?

Typically through Infor ION using BODs for master data, orders, receipts, shipments and inventory changes. The exact documents depend on your ERP and release, so map them with the integration designer before build.

Can Infor WMS control conveyors and robots directly?

Usually the WMS sends tasks to a warehouse control or execution system, which drives the equipment. The WCS interface is agreed between the WMS team and the automation integrator.

What is the difference between Infor WMS and Factory Track?

Infor WMS is a full warehouse management system with waves, task management and labor features. Factory Track warehouse mobility adds barcode-driven transactions on top of the ERP's own inventory and suits simpler warehouses.

How do we keep inventory accurate between systems?

Make the WMS the master for location-level stock, post summary movements to the ERP, and run a scheduled reconciliation that flags differences by item and location.

How long does an Infor WMS integration take?

ERP-to-WMS flows using standard BODs can take a few months including testing. Adding automation and WCS links commonly extends that, depending on equipment vendor schedules.

Talk to a Infor CloudSuite consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.