How to audit SAP Basis: a practical health check and controls review

An SAP Basis audit checks that the technical layer is secure, stable and controlled: system and client change settings, default and privileged users, RFC destinations, the security audit log, patch and kernel levels, backups and performance. It combines a security review that auditors care about with a health review that operations care about. This page lists what to check, with the transactions and reports commonly used.

When this makes sense

  • Internal or external auditors have raised findings on SAP technical controls
  • You are preparing for a SOX or similar IT general controls review
  • Performance or stability has degraded and you want an independent technical review
  • A new Basis provider is taking over and you want a baseline
  • You are planning an upgrade or S/4HANA conversion and want to know the starting state

What the engagement covers

System and client change settings

Checking that production is locked in SE06 and SCC4, that client settings block cross-client changes, and that any open periods are logged and approved.

Default and privileged users

Reviewing SAP*, DDIC, EARLYWATCH and TMSADM status across clients (report RSUSR003), use of SAP_ALL and SAP_NEW, firefighter access and emergency user logs.

Profile parameters

Password and logon parameters (login/*), gateway security (gw/acl_mode, secinfo and reginfo), and other security parameters checked in RZ10 or RZ11 against SAP recommendations.

Security audit log

Confirming the security audit log is active and filtered sensibly (SM19 or RSAU_CONFIG), retained and actually reviewed (SM20 or RSAU_READ_LOG).

RFC and interface security

Reviewing SM59 destinations with stored credentials, trusted RFC relationships and the users behind them, plus SAProuter and Web Dispatcher configuration.

Patching and vulnerabilities

Kernel and support package levels, SAP security notes applied (System Recommendations in Solution Manager or Cloud ALM) and any unsupported components.

Operations health

EarlyWatch Alert findings, ST22 dumps, SM21 system log, update errors (SM13), background job failures, database growth and backup and restore tests.

Transport management

STMS routes, who can import to production, segregation between developers and importers, and evidence of approval for each transport.

How it runs

  1. 1

    Scoping and data collection (1-2 weeks)

    • Agree systems and clients in scope
    • Collect EarlyWatch reports and parameter exports
    • Obtain read access for the review
  2. 2

    Technical review (2-3 weeks)

    • Check security settings and users
    • Review RFCs, gateway and audit log
    • Assess patching, performance and backups
  3. 3

    Findings and remediation plan (1-2 weeks)

    • Rate findings by risk
    • Propose fixes and owners
    • Present to IT and audit stakeholders
  4. 4

    Remediation support (optional) (2-8 weeks)

    • Apply parameter and user fixes
    • Implement security notes
    • Retest and close findings

What you get

  • Basis audit report with findings rated by risk
  • Evidence pack: parameter exports, user lists, RFC inventory, audit log settings
  • Remediation plan with owners and target dates
  • Updated Basis operations checklist
  • Retest results after remediation

What drives cost and effort

Number of systems and clientsEach production system and client adds checks; non-production often needs a lighter review.
Landscape complexityJava stacks, PI or PO, portals and many RFC connections add review effort.
Existing documentationGood documentation and recent EarlyWatch reports shorten data collection.
Audit framework requirementsFormal evidence for SOX or similar frameworks takes longer than an informal health check.
Remediation inclusionFixing findings, especially security notes and gateway rules, adds testing time.

Fixed-fee audit or health check

Companies needing a one-time baseline or audit preparation.

Audit plus remediation project

Organisations with known findings that want them fixed and retested.

Recurring quarterly review

Regulated companies that want continuous evidence of Basis control health.

Questions to ask any SAP consultant

Which checks are automated and which are manual?

Automated checks are repeatable; manual-only reviews may miss systems or clients.

How do you rate risk?

A list of findings without risk ratings makes it hard to prioritise fixes.

Do you review gateway and RFC security, not just users?

Gateway and RFC weaknesses are common attack paths that user reviews miss.

Will the evidence satisfy our auditors?

Evidence format matters for formal audits; agree it up front.

Can you also fix what you find?

Separating review and remediation can be good for independence, but you need a plan for both.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

Changing security parameters breaks interfaces

Test gateway and logon parameter changes in non-production and roll out with monitoring.

Locking default users disrupts jobs

Check which jobs or RFCs use them before changing passwords or locks.

Findings without owners

Assign each finding an owner and date in the remediation plan.

Point-in-time review goes stale

Turn key checks into a recurring operational checklist.

Many of these checks are covered by SAP EarlyWatch Alert and SAP's own security baseline guidance, which your Basis team can run themselves. An outside audit adds value when you need independence for auditors, when nobody internal has done it before, or when the landscape is complex.

Frequently asked questions

What is checked in an SAP Basis audit?

Typically system change settings, default and privileged users, profile parameters, security audit log, RFC and gateway security, transport controls, patch levels, backups and system health indicators.

Which SAP reports help with a Basis audit?

RSUSR003 for default users, SUIM user information reports, SM19 or RSAU_CONFIG and SM20 for the audit log, RZ10 or RZ11 for parameters, SM59 for RFCs and EarlyWatch Alert for overall health and security indicators.

How often should SAP Basis be audited?

Many organisations do a full review yearly, with key controls monitored monthly or quarterly. Regulated companies often need evidence at each audit cycle.

What are common SAP Basis audit findings?

Open production client settings, active default users with default passwords, broad SAP_ALL use, gateway ACLs in permissive mode, missing security notes and an inactive or unreviewed audit log.

Can AI help with a Basis audit?

An AI agent can read parameter exports, user lists and EarlyWatch reports and draft a findings list for a Basis expert to confirm. Netray runs this kind of analysis on private infrastructure so system data stays inside your network.

Talk to a SAP consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.