SAPFree referencePDF, Excel, Word exportSAP ECC and S/4HANAAll SAP ECC 6.0 tools

SAP Basis Transaction Codes Cheat Sheet

Every Basis admin keeps a list of the transactions they rely on. This cheat sheet groups the common Basis, security, transport and client administration t-codes in one searchable table so you can find the right screen quickly or hand it to a new team member.

Download:
T-codeNameAreaTypical use
SM50
Process Overview
Monitoring
See work processes on the current application server, find long running or stuck processes
SM51
SAP Servers
Monitoring
List application servers in the system and jump to their process overview
SM66
Global Work Process Overview
Monitoring
See work processes across all application servers in one list
SM21
System Log
Monitoring
Read kernel and system messages, logon failures, DB and update errors
ST22
ABAP Dump Analysis
Monitoring
Analyse short dumps, runtime errors and their call stacks
ST02
Tune Summary
Performance
Check buffer hit ratios, swaps and memory usage
ST03N
Workload Monitor
Performance
Response time statistics by user, transaction and task type
ST04
Database Performance Monitor
Performance
Database level performance overview (replaced by DBACOCKPIT in newer releases)
ST05
Performance Trace
Performance
SQL, enqueue, RFC and buffer traces for a single user session
ST06
Operating System Monitor
Performance
CPU, memory, swap and file system load of the host
ST11
Display Developer Traces
Monitoring
Read dev_w*, dev_disp and related trace files
STAD
Business Transaction Analysis
Performance
Per step statistics records for a user or transaction
DBACOCKPIT
Database Administration Cockpit
Database
Central DB monitoring, backup, space and job scheduling
DB02
Database Performance and Space
Database
Tablespace and table growth, missing indexes (DB dependent)
DB12
Backup Logs Overview
Database
Verify the status of database backups
DB13
DBA Planning Calendar
Database
Schedule DB backups and maintenance actions
SM36
Define Background Job
Jobs
Create and schedule a background job with steps and start conditions
SM37
Job Overview
Jobs
Find, monitor, release and cancel background jobs
SM35
Batch Input Monitoring
Jobs
Process and analyse batch input sessions
SM62
Maintain Events
Jobs
Maintain background processing events
SM64
Release of an Event
Jobs
Trigger a background event manually
SM63
Operation Mode Calendar
Jobs
Maintain the operation mode calendar
RZ04
Maintain Operation Modes and Instances
Jobs
Define operation modes and work process distribution per instance
SM12
Display and Delete Locks
Locks
Find and release stuck enqueue locks
SM13
Update Requests
Locks
Monitor failed or terminated update requests
SM14
Update Program Administration
Locks
Activate or deactivate the update and check update status
SM58
Transactional RFC
Interfaces
Analyse and reprocess failed tRFC calls
SMQ1
qRFC Monitor Outbound Queue
Interfaces
Monitor and unlock outbound qRFC queues
SMQ2
qRFC Monitor Inbound Queue
Interfaces
Monitor and unlock inbound qRFC queues
SM59
RFC Destinations
Interfaces
Maintain and test RFC connections
SMGW
Gateway Monitor
Interfaces
Monitor gateway connections and security files
SMICM
ICM Monitor
Interfaces
Internet Communication Manager status, services and connections
SICF
HTTP Service Hierarchy Maintenance
Interfaces
Activate, deactivate and secure ICF services
SMMS
Message Server Monitor
Interfaces
Message server status and connected instances
SMLG
Logon Groups Maintenance
Interfaces
Maintain logon groups for load balancing
SCOT
SAPconnect Administration
Interfaces
Configure and monitor outbound email and fax
SOST
Send Requests
Interfaces
Check the status of outbound SAPconnect messages
STMS
Transport Management System
Transports
Configure routes, import queues and import transports
SE09
Transport Organizer
Transports
Manage workbench requests and tasks
SE10
Transport Organizer (Extended View)
Transports
Manage customizing and transport of copies requests
SE01
Transport Organizer (Extended View)
Transports
Extended view of requests across users and systems
SE03
Transport Organizer Tools
Transports
Search objects in requests, set system change option
SE06
Set Up Transport Organizer
Transports
System wide transport organizer settings and namespace setup
SCC4
Client Administration
Client admin
Create clients, set client role and change protection
SCC1
Client Copy by Transport Request
Client admin
Copy client data from a transport request
SCC3
Client Copy Log
Client admin
Check client copy and transport logs
SCC5
Client Delete
Client admin
Delete a client
SCC8
Client Export
Client admin
Export a client to transport files
SCCL
Local Client Copy
Client admin
Copy a client within the same system
SU01
User Maintenance
Security
Create, change, lock and unlock users, assign roles
SU10
User Mass Maintenance
Security
Mass changes of users, such as role assignment or locks
SU53
Display Authorization Check
Security
Show the last failed authorization check for the current user
SU56
Analyze User Buffer
Security
Show the authorizations loaded in a user buffer
SU21
Maintain Authorization Objects
Security
Display and maintain authorization objects and fields
SU24
Authorization Object Check Under Transactions
Security
Maintain authorization default values per transaction
SU25
Upgrade Tool for Profile Generator
Security
Adjust authorization defaults after upgrades and support packages
PFCG
Role Maintenance
Security
Create and maintain roles, generate profiles, assign users
SUIM
User Information System
Security
Reports on users, roles, profiles, authorizations and change documents
SM19
Security Audit Configuration
Security
Configure the Security Audit Log
SM20
Security Audit Log Analysis
Security
Evaluate Security Audit Log events
STAUTHTRACE
Authorization Trace
Security
Record authorization checks to build role content
ST01
System Trace
Security
Trace authorization checks, kernel functions and DB access
RZ10
Edit Profile Parameters
Configuration
Maintain profile files and parameters with versioning
RZ11
Profile Parameter Maintenance
Configuration
Display parameter attributes and change dynamic parameters
RZ20
CCMS Monitor Sets
Configuration
Alert monitoring and monitor tree
SPAM
Support Package Manager
Maintenance
Import support packages
SAINT
Add-On Installation Tool
Maintenance
Install add-ons and add-on support packages
SNOTE
SAP Note Assistant
Maintenance
Download and implement SAP Notes
SLICENSE
SAP License Administration
Maintenance
Install and check the system license key
SPAD
Spool Administration
Spool
Define output devices and spool servers
SP01
Output Controller
Spool
Display and manage spool requests
SM04
User List
Users
Show users logged on to the current instance
AL08
Users Logged On (Global)
Users
Show users logged on across all instances
SM02
System Messages
Users
Create broadcast messages for logged on users
AL11
SAP Directories
Files
Browse server directories and files known to SAP
SLG1
Application Log Analysis
Monitoring
Read application logs written by programs and interfaces
SM30
Table Maintenance
Tables
Maintain customizing and view tables
SE16
Data Browser
Tables
Display table contents
SE11
ABAP Dictionary
Tables
Display and maintain table, view and data element definitions

T-code names are the standard English short texts. Availability and exact behaviour depend on release (ECC 6.0, S/4HANA, SAP NetWeaver version) and on your authorizations (S_TCODE). Some transactions are replaced by Fiori apps or the DBA Cockpit in newer releases.

Basis runbook assistant

Optional: ask how we can build a private assistant over your own Basis runbooks and SAP documentation.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the cheat sheet

Type part of a t-code, name or purpose into the search box, for example 'lock', 'trace' or 'transport', and the table narrows to matching rows. The Area column lets you filter mentally by job: monitoring, jobs, interfaces, transports, client administration or security. Export to Excel or PDF when you want a laminated desk copy or an onboarding page for a junior admin. Everything runs in your browser and nothing is sent to a server.

  • Search by purpose, not only by code
  • Use the Area column to learn the family of transactions around a task
  • Export to Excel and add your own notes or local Z transactions

How the codes are grouped

Basis work falls into a few families. SM-prefixed transactions cover system management: work processes, jobs, locks, updates and RFC. ST-prefixed ones are performance and trace tools. SE09, SE10 and STMS cover the transport landscape. SCC transactions handle client copy and administration, and the SU family plus PFCG and SUIM cover users and authorizations. Knowing the prefixes helps you guess where an unfamiliar function lives.

Common mistakes and release differences

Do not run SCC5 or SCC8 on a production client without a signed change request, and never leave SE06 or SCC4 change protection open after a task. Several screens have moved: ST04 and DB02 are largely replaced by DBACOCKPIT, and some admin tasks have Fiori equivalents in S/4HANA. Always confirm the transaction exists in your release with SE93 or the menu path before writing it into a runbook.

  • Restrict SCC4, SCC5, SE06 and STMS in production roles
  • Check S_TCODE and the underlying authorization objects when a code is missing from a role
  • Keep a separate list of your own Z transactions

Frequently Asked Questions

Are these transaction codes the same in ECC and S/4HANA?

Most classic Basis transactions such as SM50, SM37, SU01, PFCG and STMS exist in both. Some database and monitoring screens are replaced by DBACOCKPIT or Fiori apps, so check your release before documenting a procedure.

How do I find a transaction code for a function I only know by name?

Use the search box here, or in SAP use the menu path or table TSTCT, which stores transaction short texts by language. SE93 shows the program behind a code and its authorization settings.

Why can I not run a transaction that is listed here?

You need the authorization object S_TCODE for that code plus whatever objects the program itself checks. Use SU53 right after the failure to see which authorization check failed.

Can I add our custom Z transactions?

Export the table to Excel and add your own rows there. The online reference stays fixed, but the exported file is yours to extend for team documentation.

If your Basis team spends time answering the same 'where is this setting' questions, we can put a private assistant over your runbooks and SAP documentation on your own servers.