SAP BusinessObjects Enterprise integration with SAP solutions

SAP BusinessObjects integrates with SAP systems through SAP authentication (importing SAP roles and users), BICS and OLAP connections to BW queries, relational and SAP table connectivity for Crystal Reports, and single sign-on. The older BusinessObjects Enterprise Integration for SAP Solutions add-on was folded into the core BI platform in BI 4.x. A consultant sets up these connections, role mapping and SSO so reports run with the right data and authorisations.

When this makes sense

  • You use Web Intelligence, Analysis for Office or Crystal Reports on SAP BW or BW/4HANA
  • Users log in twice because SAP authentication or SSO is not configured
  • Crystal Reports built on ECC tables or function modules stopped working after an upgrade
  • You are upgrading BI 4.x or moving BW to BW/4HANA and need to retest connectivity
  • You are deciding whether to keep BusinessObjects or move to SAP Analytics Cloud

What the engagement covers

SAP authentication and role import

Configuring the SAP authentication plugin in the Central Management Console, importing SAP roles as BusinessObjects groups and scheduling user updates.

Single sign-on

Setting up SNC or SAML based SSO from the SAP system or identity provider to BI launch pad and the client tools.

BW connectivity

Creating BICS connections for Web Intelligence and Analysis, OLAP connections in the CMC and checking BEx query or BW/4HANA query design for performance.

Crystal Reports on SAP data

Connecting Crystal Reports to ECC or S/4HANA tables, InfoSets or ABAP function modules through the SAP data access drivers, with transport of the required authorisations.

Authorisations

Aligning BW analysis authorisations and ERP authorisations with BusinessObjects security so users only see permitted data.

Upgrade and lifecycle

Checking BI platform version support, compatibility with your BW and SAP releases, and options to move content to SAP Analytics Cloud.

How it runs

  1. 1

    Assessment (1-3 weeks)

    • Inventory connections, reports and users
    • Check versions and support status
    • Identify failing or slow reports
  2. 2

    Configuration (2-4 weeks)

    • Set up SAP authentication and role import
    • Configure SSO
    • Create or repair BW and ERP connections
  3. 3

    Testing (2-3 weeks)

    • Test reports under different roles
    • Measure performance of key BW queries
    • Fix authorisation gaps
  4. 4

    Handover (1 week)

    • Document configuration
    • Train BI administrators
    • Agree monitoring and update schedules

What you get

  • Integration configuration document (authentication, SSO, connections)
  • Role mapping between SAP and BusinessObjects groups
  • Report test matrix with role-based results
  • Performance findings for key BW queries
  • Roadmap note on BI platform support and SAP Analytics Cloud options

What drives cost and effort

Number of SAP systems connectedEach BW or ERP system needs its own authentication and connection setup and testing.
SSO methodSNC with Kerberos or SAML across many users and client tools takes longer than basic SAP authentication.
Report count and complexityHundreds of reports to retest after changes drive test effort.
Authorisation modelComplex BW analysis authorisations need careful mapping and testing.
Platform version gapOld BI releases may need an upgrade before integration fixes are possible.

Fixed-scope integration setup

A defined set of systems and connections to configure or repair.

Upgrade project

BI platform or BW upgrades where connectivity and reports must be retested.

BI support retainer

Teams that want ongoing administration of BusinessObjects on SAP data.

Questions to ask any SAP consultant

Which BI platform and BW versions have you integrated recently?

Connectivity options and known issues differ by release.

How will you test that users see only permitted data?

Authorisation leaks in reporting are a real audit risk.

How do you approach slow BW queries in Web Intelligence?

Most performance issues sit in query design, not the BI platform.

What is your view on our SAP Analytics Cloud options?

An honest adviser will discuss whether continued investment in BusinessObjects makes sense.

Will you document the SSO setup?

SSO is often set up once and then nobody knows how to renew certificates or keytabs.

Score candidate partners side by side with the free Implementation Partner Scorecard

Where these projects go wrong

SSO breaks when certificates or keytabs expire

Document renewal steps and set reminders well before expiry.

Users see data beyond their authorisation

Test with real roles and compare against BW analysis authorisations.

Reports fail after BW or ERP upgrades

Keep a regression test set of key reports and run it after each upgrade.

Investing in a platform nearing end of support

Check SAP's maintenance schedule for your BI release before major spend.

If you only need a handful of reports and already use SAP Analytics Cloud or embedded S/4HANA analytics, BusinessObjects integration work may not be worth it. And if SAP authentication is set up and working, most ongoing needs are routine administration your BI team can handle.

Frequently asked questions

What was BusinessObjects Enterprise Integration for SAP Solutions?

It was an add-on in older BusinessObjects releases that provided SAP authentication, BW connectivity and SAP data access for Crystal Reports. In BI 4.x these features are part of the core platform.

How do I connect Web Intelligence to SAP BW?

Use a BICS connection to a BW query, created in the Central Management Console or through the information design tool. BICS gives direct query access without building a universe.

Can Crystal Reports read SAP ECC tables directly?

Yes, through the SAP data access drivers for tables, InfoSets and ABAP function modules, which require supporting transports and authorisations in the SAP system.

Should we move to SAP Analytics Cloud?

It depends on your report types, users and roadmap. Many companies run both for a period; check your BI release support dates and the features you rely on before deciding.

Can AI replace some BusinessObjects reports?

For ad hoc questions, a natural-language assistant over your SAP data can answer what used to need a new report. Netray's ERPray does this read-only with the query shown, while formal reporting stays in your BI tools.

Talk to a SAP consultant

Tell us where you are and what you need. You get a straight answer on scope, approach and whether you need outside help at all.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.