SAPFree referencePDF, Excel, Word exportSAP BW/4HANAAll SAP BW and BW/4HANA tools

SAP BW and BW/4HANA Metadata Tables Reference

This reference maps BW metadata objects to the tables that store them, with key fields, what you find there and whether the table still applies in BW/4HANA. Use it to write lineage, impact and monitoring queries in SE16, SQL or an ABAP report on BW 7.x and BW/4HANA.

Download:
TableObjectKey fieldsWhat you find thereBW 7.x / BW/4HANAJoin tip
RSTRAN
Transformation
TRANID, OBJVERS
Header: SOURCETYPE, SOURCENAME, TARGETTYPE, TARGETNAME, start and end routine IDs
Both
Filter OBJVERS = 'A'. Find all transformations into a target with TARGETNAME.
RSTRANRULE
Transformation rules
TRANID, OBJVERS, RULEID
One row per rule in a transformation
Both
Join to RSTRAN on TRANID and OBJVERS.
RSTRANFIELD
Rule fields
TRANID, OBJVERS, RULEID, ...
Source and target fields used by each rule
Both
Join to RSTRANRULE on TRANID, OBJVERS, RULEID to map source to target fields.
RSAABAP
ABAP routine code
CODEID, OBJVERS, LINE_NO
Source lines of routines in transformations and DTP filters
Both
Search the LINE field to find which routines read a given table.
RSBKDTP
Data transfer process
DTP, OBJVERS
DTP definition with source (SRC, SRCTP) and target (TGT, TGTTP)
Both
Match SRC and TGT to RSTRAN SOURCENAME and TARGETNAME.
RSBKDTPT
DTP texts
LANGU, DTP, OBJVERS
DTP descriptions
Both
Join on DTP and OBJVERS with LANGU = 'E' or your logon language.
RSBKREQUEST
DTP request (classic)
REQUID
DTP requests and their status in classic request management
BW 7.x; replaced by RSPM request management in BW/4HANA
Join DTP to RSBKDTP.
RSPMREQUEST
Request (RSPM)
Request TSN
Requests identified by transaction sequence number, with REQUEST_STATUS and REQUEST_IS_IN_PROCESS flags
BW 7.5 ADSO and BW/4HANA
Do not update directly; change request status in the request administration of the ADSO Manage screen.
RSPCCHAIN
Process chain steps
CHAIN_ID, OBJVERS, TYPE, VARIANTE
Each process in a chain with its process type and variant
Both
TYPE = 'DTP_LOAD' rows have the DTP name in VARIANTE.
RSPCCHAINT
Process chain texts
LANGU, CHAIN_ID, OBJVERS
Chain descriptions
Both
Join on CHAIN_ID and OBJVERS.
RSPCLOGCHAIN
Process chain runs
CHAIN_ID, LOG_ID
One row per chain run with date, time and status
Both
LOG_ID links to RSPCPROCESSLOG.
RSPCPROCESSLOG
Process run status
LOG_ID, TYPE, VARIANTE, INSTANCE
Status of each process in a run, with start and end time
Both
Join to RSPCLOGCHAIN on LOG_ID to find failed steps per run.
RSPCVARIANT
Process variants
TYPE, VARIANTE, OBJVERS
Parameters of process variants
Both
Join on TYPE and VARIANTE from RSPCCHAIN.
RSOADSO
DataStore object (advanced)
ADSONM, OBJVERS
ADSO definition and settings
BW 7.4 SP and later, BW/4HANA
Generated tables use the prefix /BIC/A plus the ADSO name.
RSOADSOT
ADSO texts
LANGU, ADSONM, OBJVERS
ADSO descriptions
BW 7.4 SP and later, BW/4HANA
Join on ADSONM and OBJVERS.
RSDODSO
Classic DSO
ODSOBJECT, OBJVERS
Classic DataStore object definitions
BW 7.x only; classic DSOs are not supported in BW/4HANA
Active table /BIC/A<name>00, activation queue /BIC/A<name>40.
RSDCUBE
InfoCube
INFOCUBE, OBJVERS
InfoCube header
BW 7.x only; InfoCubes are not supported in BW/4HANA
Fact tables /BIC/F<cube> and /BIC/E<cube>.
RSOHCPR
CompositeProvider
HCPRNM, OBJVERS
CompositeProvider definitions
BW 7.4 SP and later, BW/4HANA
Replaces MultiProviders in BW/4HANA.
RSDIOBJ
InfoObject
IOBJNM, OBJVERS
InfoObject type (IOBJTP), data type, length and settings
Both
Master data tables: /BIC/P (attributes), /BIC/Q (time-dependent), /BIC/T (texts), /BIC/S (SIDs), /BIC/H (hierarchy).
RSDIOBJT
InfoObject texts
LANGU, IOBJNM, OBJVERS
Short and long descriptions TXTSH, TXTLG
Both
Join on IOBJNM and OBJVERS.
RSZCOMPDIR
Query components directory
COMPUID, OBJVERS
Technical name COMPID and component type DEFTP (REP for a query)
Both
COMPUID links to RSZELTDIR and RSZELTTXT ELTUID.
RSZELTDIR
Query elements
ELTUID, OBJVERS
Directory of query elements (queries, structures, key figures, variables)
Both
DEFTP gives the element type.
RSZELTTXT
Query element texts
ELTUID, OBJVERS, LANGU
Query and element descriptions TXTLG
Both
Query description: RSZCOMPDIR.COMPUID = RSZELTTXT.ELTUID with DEFTP = 'REP'.
RSRREPDIR
Query directory
COMPUID
Query technical name and the InfoProvider (INFOCUBE field) it runs on
Both
Fastest way to list queries per InfoProvider.
RSDS
DataSource
DATASOURCE, LOGSYS, OBJVERS
DataSource definitions in BW
Both (BW/4HANA uses ODP and other source types)
Join to ROOSOURCE in the source system on the DataSource name.
RSLDPIO
InfoPackage
LOGDPID, OBJVERS
InfoPackage settings with the DataSource (OLTPSOURCE) and source system (LOGSYS)
BW 7.x only; InfoPackages are not used in BW/4HANA
Texts in RSLDPIOT.
RSTSODS
PSA table mapping
ODSNAME, ...
Maps a DataSource PSA to its generated /BIC/B table (ODSNAME_TECH)
BW 7.x; BW/4HANA uses an inbound ADSO table instead of PSA
Look up the /BIC/B000... table name for a DataSource.
RSHIEDIR
Hierarchy directory
HIEID, OBJVERS
Hierarchies with InfoObject IOBJNM and hierarchy name HIENM
Both
Nodes in /BIC/H<iobj>.
ROOSOURCE
DataSource (source system)
OLTPSOURCE, OBJVERS
DataSource header in the source ERP: extractor, delta process, extract structure
Source system table
Read it in the ECC or S/4HANA system, not in BW.
/BIC/A<name>1
ADSO inbound table
Request TSN, data package, record
Data loaded but not yet activated
ADSO in BW 7.4 SP and later, BW/4HANA
Empty after activation for standard ADSOs.
/BIC/A<name>2
ADSO active data table
Semantic key of the ADSO
Active data used for reporting
ADSO in BW 7.4 SP and later, BW/4HANA
Query this for current values.
/BIC/A<name>3
ADSO change log
Request TSN, data package, record
Before and after images for delta to further targets
ADSO in BW 7.4 SP and later, BW/4HANA
Grows fast: plan request housekeeping.
OBJVERS values
Object version
A, M, D
A active, M modified (revised, not yet active), D delivered (Business Content)
Both
Always filter OBJVERS = 'A' unless you are comparing versions.

Key fields show the main keys; open each table in SE11 on your release for the full list. SAP-delivered objects use /BI0/ instead of /BIC/. Read these tables, never update them directly.

Get a BW lineage query

Tell us the ADSO or query you care about and we will send a ready SQL or ABAP lineage query for your BW release.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by object (transformation, DTP, chain, query) or by table name. Each row gives the keys to join on and a tip for the most common question. Almost every metadata table has OBJVERS: filter OBJVERS = 'A' to read the active version, or you get the modified and delivered versions as duplicates. Text tables end in T and have LANGU in the key. For SAP-delivered content, generated table names start with /BI0/ instead of /BIC/.

  • Lineage: RSTRAN (source to target), RSBKDTP (DTP), RSPCCHAIN (which chain runs the DTP).
  • Monitoring: RSPCLOGCHAIN and RSPCPROCESSLOG.
  • Query catalog: RSRREPDIR, RSZCOMPDIR, RSZELTTXT.

Worked example: which chain loads an ADSO

To find what loads ADSO ZSALES01, read RSTRAN with TARGETNAME = 'ZSALES01' and OBJVERS = 'A' to get the source objects. Read RSBKDTP with TGT = 'ZSALES01' to get the DTP names. Then read RSPCCHAIN with TYPE = 'DTP_LOAD' and VARIANTE equal to each DTP name to get the CHAIN_ID, and RSPCCHAINT for the chain text. To see last night's run, take the latest LOG_ID for that CHAIN_ID from RSPCLOGCHAIN and read the step statuses in RSPCPROCESSLOG.

Version differences and gotchas

BW/4HANA removed InfoCubes, classic DSOs, MultiProviders, InfoPackages and the PSA, so RSDCUBE, RSDODSO, RSLDPIO and RSTSODS describe objects that only exist in BW 7.x. Their replacements are ADSOs (RSOADSO) and CompositeProviders (RSOHCPR). Request handling also changed: ADSO loads in BW 7.5 and all loads in BW/4HANA use RSPM request management with request TSNs instead of request IDs, stored in RSPMREQUEST. Do not edit RSPMREQUEST to unlock a request; use the request administration in the ADSO Manage screen. ADSO tables use suffix 1 (inbound), 2 (active) and 3 (change log).

How to check the result in the system

Open the table in SE11 to confirm fields on your release, and SE16 or SE16N to read data. Compare what you find with the BW modeling tools in Eclipse or RSA1, for example the transformation source and target or the DTP filter. For process chains, RSPC shows the same runs as RSPCLOGCHAIN. For ADSO tables, the Manage screen of the ADSO lists requests and the generated table names. Where a table is missing on BW/4HANA, the object type itself does not exist there.

Frequently Asked Questions

Which table stores BW transformations?

RSTRAN holds the transformation header with TRANID, source and target type and name. Rules are in RSTRANRULE and the fields per rule in RSTRANFIELD. Routine code is in RSAABAP. Always filter OBJVERS = 'A' for the active version.

What is the DTP table in SAP BW?

RSBKDTP stores DTP definitions with source (SRC, SRCTP) and target (TGT, TGTTP); texts are in RSBKDTPT. Classic DTP requests are in RSBKREQUEST, while BW/4HANA and BW 7.5 ADSO loads use RSPM request management and RSPMREQUEST.

Which table has the BW query description?

Join RSZCOMPDIR (technical name COMPID, DEFTP = 'REP' for queries) to RSZELTTXT on COMPUID = ELTUID and filter the language; TXTLG is the description. RSRREPDIR tells you which InfoProvider each query runs on.

What are the ADSO table names?

An ADSO generates /BIC/A<name>1 for the inbound table, /BIC/A<name>2 for active data and /BIC/A<name>3 for the change log, depending on the ADSO type. SAP-delivered ADSOs use /BI0/A. Definitions are in RSOADSO.

If you want your BW team to ask lineage and load-status questions in plain English on your own servers, Netray can add that AI layer over your BW metadata.

Get SAP BW and BW/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP BW and BW/4HANA sites, and new free SAP BW and BW/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP BW and BW/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP BW and BW/4HANA? Start with the SAP BW and BW/4HANA guide and toolkit.

Keep exploring