Error fixDeltek CostpointAvailability / Login / Mobile

Deltek Costpoint Not Working: Outage, Login and Mobile App Troubleshooting

Error
deltek costpoint not working

Also searched as

  • deltek costpoint down today
  • deltek costpoint app not working
  • deltek costpoint app qr code
  • costpoint cannot log in

Short answer

First decide if it is an outage or a local problem: check Deltek's cloud status page if you are hosted by Deltek, or your own servers if on-premises, then test another user and another browser. Most Costpoint issues are login or session problems, browser or network changes, or a mobile app pointed at the wrong server. The mobile app pairs with a QR code or server URL generated by your administrator.

Applies to: Deltek Costpoint 8.x and Costpoint cloud (Deltek hosted), plus on-premises installations; companion mobile apps such as Deltek time-entry apps.

Triage Costpoint not working

  1. 1Ask a colleague on a different network to try. If they also fail, it is the system; if not, it is your device or network.
  2. 2If hosted by Deltek, check the Deltek cloud status page and any maintenance notice from your account.
  3. 3If on-premises, check the web server, application server and database services and their logs.
  4. 4Try a private browser window, clear the cache, and disable extensions; check for browser updates.
  5. 5For login failures, confirm the password, account lock, and SSO or identity provider status.
  6. 6Check whether a firewall, VPN, proxy or certificate change happened.
  7. 7For slowness, find whether one screen or everything is slow, and when it started.
  8. 8If unresolved, open a support case with time, user, screen, message and screenshots.

Outage or local problem

The quickest test is a second user on a different network. A wide failure means the service is down or degraded. A single user failure usually means a locked account, a cached session, or a device problem.

For cloud customers, Deltek's status page and your support contacts are the source of truth. For on-premises customers, you own the stack: web tier, application server, database and certificates.

Login problems

Common causes are expired passwords, accounts locked after failed attempts, a changed single sign-on setup, an expired certificate, and a browser that blocks cookies required for the session. Check the identity provider before blaming Costpoint when SSO is used.

Mobile app and the QR code

Deltek's mobile companions to Costpoint, such as the time-entry apps, are connected to your server by an address the administrator provides, often as a QR code or a server URL. If scanning fails, check that the code was created for your current environment, that the phone can reach the server (VPN or Wi-Fi rules), and that the app version is current.

If the server URL or certificate changes, the app must be reconnected. Ask your administrator for a new code.

On-premises checks and compliance

Costpoint in defense contractors often runs under CUI and CMMC constraints, which affects how remote access and mobile devices are allowed. Check that a blocked connection is not an intentional control. Our hosting decision page covers cloud versus on-premises.

Try it here, free

Deltek Costpoint Private AI Layer Blueprint Generator

Open full tool

Generate an architecture plan for a private AI assistant on on-prem Deltek Costpoint: SQL replica, web services and import interfaces, organization and project permissions, local GPU model and audit.

Common pitfalls

  • !Assuming an outage when only one account is locked.
  • !Clearing the browser cache but not testing another browser.
  • !Reusing an old QR code after a server change.
  • !Overlooking a recently expired certificate.
  • !Opening a support case with no time or error text.

How an ERP-grounded AI assistant handles this

On-premises sites can feed server logs and helpdesk tickets to a private assistant that answers which component is failing and what changed recently, with the evidence quoted. It does not restart services. Netray builds this for customers who cannot send logs to a public tool.

Frequently asked questions

Is Deltek Costpoint down today?

Check the Deltek cloud status page if you are hosted by Deltek, or your own server monitoring if on-premises. Also ask a colleague on another network to test, to separate an outage from a local problem.

Why will the Costpoint app not connect?

Typical causes are an outdated server address or QR code, the phone not reaching the server, an expired certificate, or an old app version. Ask your administrator for a fresh QR code or server URL.

Where do I get the Costpoint app QR code?

From your administrator, who generates it for the environment the app should connect to. The exact location depends on the app and your version.

Why can I log in on one device and not another?

Look at browser cookies, proxy and VPN rules, certificates on the device, and cached sessions. If another device works, the account itself is usually fine.

Related

CIO briefing

Costpoint Cloud or On-Prem for a Contractor Handling CUI?

Neither choice makes you compliant by itself. The decision turns on whether Costpoint data in your environment is CUI, which authorization or assessment evidence the hosting provider can actually give you, how much of the control set you want to own, and what you plan to connect to the system, including AI. Decide based on scope and evidence, not on a general preference for cloud.

Error fix

Costpoint Timesheet: Employee Cannot Charge to a Project

When Costpoint rejects a charge line on a timesheet, one of a short list of validations has failed: the project or task is not open for charging, the account or organization on the line is not valid for that project, the employee is not set up to charge it, or the timesheet date falls outside an open period. Work through those checks in order and the cause is almost always found in minutes.

How-to

How to Edit Favorites, Change Your Password and Delete Lines in Deltek Costpoint

In Costpoint you manage favorites from the navigation pane (add a screen to Favorites, then reorder or remove it there), change your password from the login screen or your user options when Costpoint itself authenticates you, and delete lines by selecting the row in the grid, using the delete-record or delete-line toolbar action, and saving. Exact labels shift slightly between Costpoint 7 and 8, and passwords are managed in your identity provider when SSO is on.

How-to

What Is the Latest Version of Deltek Costpoint?

Costpoint 8.x is the current generation of the web product, delivered as a series of releases such as 8.0 and 8.1 with regular updates, and Deltek publishes the authoritative current number on its support portal. The core bundle is the base licensed set of modules, and content management integration is usually done through document links or connectors to a separate repository such as SharePoint.

Error fix

Deltek Costpoint Connection Error: Is Costpoint Down?

A Costpoint connection error means a layer between your browser and the database failed: your network or browser, the web or application server, single sign-on, or the database. Test from outside your machine first to learn whether it is only you or everyone, then check each layer in order. If you are Deltek-hosted, check Deltek's status communications and open a support case.

How-to

How to Process a Contract Modification in Deltek Costpoint

A contract modification in Costpoint is a controlled change to the contract and project records: funded amount, contract value or ceiling, period of performance and sometimes billing terms. Record it against the correct project and contract with the effective date, update funding before charges exceed the old limit, keep the modification document as evidence, and verify billing limits afterward.

AI for ERP

AI for Deltek Costpoint in government contract accounting

AI on Deltek Costpoint for timesheets, indirect rates, and incurred cost, grounded on real data and deployed on-prem to keep DCAA-relevant data in house.

AI for ERP

On-prem AI for Costpoint inside a CMMC Level 2 enclave

Deploy AI beside Deltek Costpoint inside a CMMC Level 2 enclave: what to check before adding any AI tool, and how on-prem inference avoids new CUI flows.

Stuck on Deltek Costpoint?

Talk to engineers who work inside Deltek Costpoint every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software