How to add a mobile app to Deltek Costpoint
Short answer
Start by checking what Deltek's own mobile offerings cover, then fill gaps with a thin mobile client over a backend service that talks to Costpoint through supported interfaces. Timesheets, approvals and barcode receiving are the common targets. Offline support and device security decide the design.
Costpoint is browser-based and was not designed as a phone-first system. Deltek has offered mobile and time-entry options over the years, though the exact products, names and what they cover depend on your release and licensing. Teams still end up asking for the same few things on a phone: enter or approve time, approve a requisition, receive material with a scanner, and look up a project.
Manufacturers using the Costpoint manufacturing modules add shop-floor needs: labor reporting against work orders, material moves, and inspection results. Those usually need a ruggedized device with a barcode scanner rather than a personal phone.
The right answer depends on who the user is. Office staff are well served by approvals and lookups. Field and site staff need offline timesheets. Warehouse staff need fast scanning with immediate validation.
What teams use it for
Offline timesheet entry for site staff
Employees on customer sites or remote locations enter hours against allowed charge codes, store them on the device and sync later, with validation against valid project, task and labor category.
Approvals for managers
Approve timesheets, requisitions and expense reports from a phone with the context needed: who, how much, which project.
Barcode receiving
Scan PO barcode and item labels to receive material, flag overages and capture lot numbers.
Shop-floor labor and job reporting
Start and stop work on operations with badge or barcode scans, feeding labor into project or work order costs after supervisor approval.
Inventory moves and cycle counts
Move parts between locations and count with a handheld, writing differences to a staging area for supervisor review.
Deltek Costpoint integration surface
- Deltek mobile and time entry options: check your license for Costpoint mobile or related time products before building anything new.
- Costpoint web services where licensed: the cleanest backend for timesheet, approval and receiving transactions; confirm object coverage.
- Costpoint import utilities: a controlled fallback for batch-style submission of time or receipts.
- SQL Server read access (on-prem): suitable for lookup data such as valid charge codes, PO lines and locations in a read-only cache.
- SSO via your identity provider: required so the mobile app uses the same identity as the browser client.
How it works
- 1
Inventory what Deltek already provides
Ask your reseller about mobile time entry and approvals for your version. Use it where it fits; build only the gaps.
- 2
Choose the client style
A progressive web app is quick for office roles. A native or cross-platform app is better for scanning, background sync and device management.
- 3
Build a backend for mobile
A service that authenticates users, caches reference data, validates entries, and speaks to Costpoint. Do not expose Costpoint directly to the internet.
- 4
Design offline sync
Queue entries with timestamps and unique IDs, resolve conflicts on server side, and show clear status for each entry.
- 5
Integrate scanning and device features
Use camera or hardware scanners with immediate local validation against cached PO lines or locations.
- 6
Deploy with device management
Use MDM for enrollment, remote wipe and app distribution, especially for contractors handling controlled data.
Example flows
Offline timesheet sync
Trigger: A technician enters hours with no signal on a remote site.
- App checks hours against locally cached valid charge codes.
- Entry is saved with a unique ID and queued.
- On reconnect the backend validates and submits to Costpoint.
- App shows accepted or rejected with the reason for each line.
Result: Time is captured daily without waiting for connectivity, and rejections are fixed while memory is fresh.
Dock receiving with scanner
Trigger: Receiving clerk scans a PO barcode.
- App fetches open lines from the backend cache.
- Clerk scans items and enters counts; overages trigger a warning.
- Submission creates a receipt for posting after any required inspection hold.
Result: Receipts happen at the dock in real time with fewer keying errors.
Keeping data on-prem
A mobile backend can sit in your DMZ or inside your network with a VPN or zero trust access for devices, so Costpoint never faces the internet. For cloud-hosted Costpoint, only the backend needs reach to the supported interfaces. If you add voice or natural language entry, use a locally hosted open-weight model, since utterances can contain project and program names. Offline caches on devices should be encrypted and wiped on logout or MDM command.
Security checklist
- Authenticate with your identity provider and short-lived tokens; do not store passwords on devices.
- Encrypt local storage, require device PIN or biometrics, and support remote wipe through MDM.
- Cache only reference data the user is allowed to charge or see, not the full project list.
- Validate every submission server-side; a modified client must not bypass charge code rules.
- Log device ID, user and time for each transaction to support labor audit requirements.
Ways to get it done
Deltek-provided mobile time or approvals
Effort: Configuration and rollout, usually weeks.
Standard timesheet and approval needs on supported releases.
Third-party mobile time or scanning product
Effort: Weeks, plus license; verify connector support.
Teams needing barcode or labor capture with a vendor connector to Costpoint.
Custom app built with Netray or your team
Effort: Typically 8 to 16 weeks for a first release, depending on scope.
Specific workflows, offline needs and on-prem model features.
Pitfalls
- !Letting employees enter time against any project because the cache is too broad.
- !Building offline mode without conflict rules, causing duplicate timesheet lines.
- !Exposing Costpoint directly to mobile networks.
- !Ignoring MDM and allowing unmanaged personal devices to hold project data.
- !Underestimating review: DCAA-style labor audits expect time to be entered contemporaneously and approved.
Frequently asked questions
Does Deltek Costpoint have a mobile app?
Deltek has offered mobile and time-entry options in the past, and the details depend on your version and licensing. Ask your Deltek representative or reseller what is available for your release, then decide whether a custom app is needed for the gaps.
Can we capture time offline?
Yes with a custom or third-party client that caches valid charge codes locally and syncs later. You need clear conflict handling and a rule that time is validated again on the server before it reaches Costpoint.
Can a phone act as a barcode scanner for receiving?
For low volume, yes with the camera. For heavy dock or warehouse use, rugged handhelds with hardware scanners are faster and more reliable. The backend logic is the same either way.
Is a mobile app allowed for controlled-program data?
Only with proper controls: managed devices, encrypted storage, authenticated access and a policy that matches your contract obligations. Many teams limit mobile to time, approvals and logistics data.
How do mobile entries reach Costpoint?
Through a backend that validates entries and submits via supported web services or import utilities. Writing directly to the database is discouraged because it bypasses Costpoint's rules and audit fields.
Want Mobile app working on your Deltek Costpoint?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
Deltek Costpoint Private AI Layer Blueprint Generator
Generate an architecture plan for a private AI assistant on on-prem Deltek Costpoint: SQL replica, web services and import interfaces, organization and project permissions, local GPU model and audit.
Keep exploring
Free tools
- Deltek Costpoint Private AI Layer Blueprint GeneratorGenerate an architecture plan for a private AI assistant on on-prem Deltek Costpoint: SQL replica, web services and import interfaces, organization and project permissions, local GPU model and audit.
- Deltek Costpoint AI Assistant Sizing and Value CalculatorEstimate GPUs, document index size and monthly value for a private AI assistant on Deltek Costpoint. Contract and policy documents often dominate index size, so the document inputs matter here.
ERP fixes and how-tos
- How to Enter Time in Deltek Costpoint (Timesheet Steps and Corrections)Step-by-step Deltek Costpoint timesheet entry: choose the period, add charge lines, enter hours, save, sign and submit, plus how corrections work.
- Is Deltek Costpoint Down? Outage Check, Login and Mobile App TroubleshootingIs Costpoint down, or is it just you? Confirm a Deltek Costpoint outage in two minutes, then fix login, browser, SSO and mobile app QR code or server URL problems.
- Costpoint Timesheet: Employee Cannot Charge to a ProjectEmployee cannot charge a project in Costpoint timesheets? Check project status, charging flags, account and org validity, labor setup and timesheet dates.
Runs with your ERP
- RFgen Mobile Edge with SAP S/4HANA: mobile barcode integrationHow RFgen Mobile Edge posts barcode receiving, picking, counts and production reporting to SAP S/4HANA, ECC and Business One: flows, setup, pitfalls, AI.
- SnAPscan and SAP Business ByDesign: Android barcode scanning for warehouse tasksSnAPscan is an Android barcode app for SAP Business ByDesign covering inbound, outbound, internal movements and inventory, online or offline. Setup and pitfalls.
- Cloud Inventory (DSI) with Oracle E-Business Suite: Mobile Barcode InventoryCloud Inventory, formerly DSI, adds offline mobile barcode inventory to Oracle E-Business Suite and JD Edwards. Data flows, setup steps, pitfalls and AI notes.
Guides
- Mobile Shop Floor Reporting for SyteLine ProductionImplement mobile shop floor data collection in SyteLine. Configure labor reporting, operation completions, and production data capture on handheld devices.
- Setting Up the SyteLine Mobile Warehouse Management AppConfigure the SyteLine mobile warehouse management app. Set up device profiles, warehouse workflows, and real-time inventory operations for CloudSuite Industrial.
- SyteLine Mobile App Deployment GuideDeploy SyteLine mobile applications. Infor Go configuration, mobile form design, offline capabilities, and device management for CloudSuite Industrial.
AI on your ERP
- AI for Deltek Costpoint Timekeeping and Labor: Timesheet Exceptions and Labor QuestionsPrivate AI on Deltek Costpoint timekeeping and labor: spot late, missing or unusual timesheet entries and answer labor questions without leaving your network.
- AI for Deltek Costpoint in government contract accountingAI on Deltek Costpoint for timesheets, indirect rates, and incurred cost, grounded on real data and deployed on-prem to keep DCAA-relevant data in house.
Integrations
- How to build a mobile app for Infor M3Build a shop-floor or warehouse mobile app for Infor M3: barcode scanning, stock moves, labor reporting and approvals via ION API and M3 MI programs, with offline notes.
- How to add a mobile app to Infor SyteLineBuild or extend a mobile app for Infor SyteLine: barcode scanning, labor reporting, inventory moves and approvals over IDO REST, with offline and device options.