AdvancedE2 Shop System (Shoptech, on-prem)AI integration / database views and documents

How to Add a Private AI Layer to E2 Shop System On-Prem

Question
how to add AI to E2 Shop System on-prem

Also searched as

  • E2 Shop System AI integration without cloud
  • Shoptech E2 database AI assistant
  • private LLM for E2 shop software

Short answer

E2 Shop System holds quotes, orders, jobs, routings, inventory and purchasing in a database you host yourself. A private AI layer reads a copy through a restricted account, exposes it through documented views, indexes quotes and job documents locally, runs an open-weight model on your own GPU, and leaves changes to E2's own screens or supported interfaces with a person approving.

Applies to: On-premises E2 Shop System; confirm the version and database engine with your administrator, because the engine differs between older and current releases

Steps to add a private AI layer to E2 Shop System (on-prem)

  1. 1Confirm the E2 version and database engine and who administers the server; get the vendor's data dictionary or export documentation for your release.
  2. 2Arrange a nightly restore or replicated copy of the E2 database on a separate instance for the assistant to read.
  3. 3Create a restricted read-only account on that copy and deny access to payroll, user credential and similar sensitive tables.
  4. 4Create an ai schema of views for quotes, orders, jobs, operations, inventory, purchasing and shipping, with plain-language column descriptions.
  5. 5Index quote PDFs, customer POs, drawings and job packets into a local vector store tagged by customer and document type.
  6. 6Serve an open-weight model on a local GPU and put a tool server between it and the views, with an audit log of every call.
  7. 7Map E2 users to roles and apply role scope in the tool server; hide cost and margin from roles that should not see them.
  8. 8Release in phases: read-only questions, then quote-assist drafts, then approved actions through E2's own screens or a supported import.

How E2 data can be reached

E2 Shop System is a job shop ERP covering quoting, order entry, job costing, scheduling, inventory, purchasing, shipping and accounting. On premises, its data lives in a database that your IT team hosts, and the engine depends on the release. Current E2 releases use Microsoft SQL Server; older releases used a different embedded engine, so verify before planning.

The reliable pattern is to read a copy and expose views rather than raw tables. Views let you rename obscure column names, expand status and type codes into words, and exclude sensitive columns. They also make it possible to change the underlying schema after an E2 upgrade by editing the views rather than retraining anything.

E2 enforces costing, scheduling and status logic in the application. Do not write to its tables with SQL; use E2's screens or a vendor-supported import.

-- Pattern for a read-only schema of views on the replica (placeholders are yours)
CREATE SCHEMA ai;
GO
CREATE VIEW ai.OpenJobs AS
SELECT <job number column> AS JobNumber,
       <customer column> AS Customer,
       <due date column> AS DueDate,
       <status column> AS Status
FROM dbo.<job table from your data dictionary>
WHERE <status column> NOT IN (<closed statuses>);
GO
GRANT SELECT ON SCHEMA::ai TO ai_reader;

Reference architecture

Keep the architecture small. A copy of the E2 database, a vector store, a GPU server and a tool server are enough. The tool server exposes parameterised reads such as open quotes for a customer, jobs due this week, material on order by part and last price paid, and returns rows with source references the model can cite.

Quote assistance is a natural use. The assistant can retrieve similar past quotes and the actuals from completed jobs, then summarise them for the estimator. The estimator still sets the price, and nothing is written back automatically.

In a controlled-data shop, run the full stack in an isolated network segment with no outbound access. Model files and updates are brought in on approved media, and the audit log stays on site.

Permissions and data scope

E2 users have security rights inside the application, but the assistant reads through one database account. The tool server therefore carries the scope: identify the user, map them to a role such as estimator, planner, buyer, supervisor or finance, and allow only the views that role needs.

Pricing, quoted margins and actual job costs belong to restricted roles. Apply the same rule to the document index: quotes and cost summaries are tagged and filtered at retrieval, so a supervisor never receives a chunk from a margin spreadsheet.

Run a role test before go-live. The same question asked as supervisor and as owner should give different answers where cost is involved.

Write-back, sizing and phased rollout

Start read-only. Later, the assistant can draft a quote line, a purchase request or a customer delay notice, and the user commits it in E2. If you want true write-back, use only routes the vendor supports for your release and keep a human approval step with the exact payload shown.

For 20 to 100 named users a single 24 GB class GPU with a 7B to 14B model is a common fit, and a quote-heavy shop that wants long context over many PDFs may prefer 48 GB. Index size is driven by the number of quotes and drawings and typically stays small.

Phase one: status, due date and inventory questions. Phase two: quote retrieval and drafts. Phase three: a short list of approved writes.

Honest limits

Schema documentation for smaller ERPs can be thin, and customised fields are common, so the first weeks go into mapping. Embedded or older database engines may not support the replication options discussed here, in which case a nightly export to a modern engine is the fallback.

If your need is a few dashboards, E2's own reports and a standard BI tool may be enough. The assistant pays off for ad hoc questions, quote history retrieval and document search that fixed reports cannot do.

Try it here, free

E2 Shop System Private AI Layer Blueprint Generator

Open full tool

Fill in your version, database, hosting and use cases to get an architecture plan for a private, on-prem AI assistant on E2 Shop System, ready to share with IT and security.

Common pitfalls

  • !Exposing raw tables instead of views, which leaks sensitive columns and breaks on upgrades.
  • !Letting the model see quote margins when the user's role should not.
  • !Assuming the database engine without confirming the E2 release.
  • !Pointing at production instead of a copy.
  • !Writing to E2 tables with SQL and skipping application logic.

How an ERP-grounded AI assistant handles this

ERPray's pattern of read-only access, visible queries and role scope applies to E2. Netray's custom build service can produce the views, tool server and quote retrieval index with the model hosted on your own hardware.

Frequently asked questions

Which database does E2 Shop System use?

Current releases use Microsoft SQL Server; older releases used a different embedded engine. Confirm your release with your administrator or the vendor before choosing a replication method.

Why use views instead of reading tables directly?

Views let you rename columns, expand codes, hide sensitive fields and absorb schema changes after an upgrade. They also give the model a cleaner, documented surface to work with.

Can the assistant create quotes in E2?

It can draft quote content from past quotes and actuals. The estimator enters or imports the quote through E2 and approves the price. Automatic write-back is not recommended in the first release.

How much GPU is needed?

A single 24 GB class GPU with a 7B to 14B model often serves 20 to 100 named users. Use the sizing calculator with your own usage to refine the estimate.

Related

How-to

How to Create a Quote in E2 Shop System

A quote in E2 Shop System starts with a header identifying the customer and part, then adds routing operations with time and rate, material and outside processing costs, and a markup to reach a sell price. Once accepted, the quote converts directly into a job or sales order so the estimate carries forward as the job's cost basis.

How-to

How to Run Live Scheduling in Global Shop Solutions

Live Scheduling in Global Shop Solutions builds a finite-capacity schedule from job routing operations against defined work centers, then presents it as a drag-and-drop board that shop supervisors adjust to reflect real shop floor priorities. Its accuracy depends on work centers, standard hours, and shop floor data collection all being kept current, since the schedule is only as good as the routing and capacity data feeding it.

Advanced

How to Add a Private AI Layer to QAD Enterprise Edition On-Prem

QAD EE runs on a Progress OpenEdge database, which can be read through the OpenEdge SQL-92 engine over JDBC or ODBC without touching the 4GL application. A private AI layer reads a replica or reporting copy, indexes documents locally, serves an open-weight model on your own GPUs, and writes back only through QXtend or another supported QAD interface with human approval.

Advanced

How to Add a Private AI Layer to Global Shop Solutions On-Prem

Global Shop Solutions keeps jobs, routings, inventory, purchasing and quality data in one database that can be read through ODBC or the vendor's report and export tools. A private AI layer works from a read-only copy, builds a documented semantic layer over the tables you actually use, serves an open-weight model locally, and writes back only through vendor-supported import or API routes with approval.

Advanced

How to Add a Private AI Layer to Classic JobBOSS On-Prem

Classic JobBOSS stores its data in a Microsoft SQL Server database, so a private AI layer can read job, operation, material, customer and delivery data through a read-only login on a restored or replicated copy. Documents stay in a local index, the model runs on your own GPU, and any change to JobBOSS goes through its own screens or supported import tools after a person approves.

Error fix

E2 Shop System Error 5093: Causes and How to Troubleshoot

We could not find an authoritative public definition of E2 error 5093, so treat any single-cause answer with caution. In practice, numbered E2 errors raised at login or while opening a module come from the client talking to the database: a changed server name, a SQL permission or login problem, a missing or mismatched driver, or a network or firewall change. Isolate which with the checks below and give Shoptech support the exact context.

AI for ERP

AI for ECI JobBOSS2 and E2 Shop System

Add AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.

AI for ERP

AI Agents for ERP, Running On-Prem

A practical guide to on-prem AI agents for ERP: what they can safely automate, where human approval belongs, and how to design the guardrails.

Stuck on E2 Shop System (Shoptech, on-prem)?

Talk to engineers who work inside E2 Shop System (Shoptech, on-prem) every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Software