Error fixInfor M3Messages / Error diagnosis

EVS006 in Infor M3: What It Means and How to Fix It

Error
evs006 infor m3

Also searched as

  • EVS006 M3 error
  • infor m3 error message code lookup
  • m3 message ID how to find meaning

Short answer

EVS006 is an M3 message ID. We cannot give one authoritative meaning for it that holds across every version and program, and a guessed meaning would send you the wrong way. This page shows how to resolve the exact text and the field behind the message in your own system, which is the reliable way to fix any M3 message.

Applies to: Infor M3 Business Engine, all releases. The message text and the triggering program differ by version and by customization.

Find out what EVS006 is telling you

  1. 1Reproduce the error in the H5 client and copy the full text shown in the message bar or dialog, not only the ID. Note the program (for example the panel title) and the field where the cursor stopped.
  2. 2Press the help key on the field or open the program documentation to read the field rules. The message usually names a field that failed validation.
  3. 3Check whether the message comes from a customization such as a personalization script or an extension, by repeating the action in a clean role or sandbox without the script.
  4. 4If the error comes from an API call, read the full MI response: the error text and the field name are returned with the message ID, and the transaction name shows which program raised it.
  5. 5Look in the M3 or Grid logs for the same timestamp. The Business Engine log shows the program and the message it raised for that session.
  6. 6Search the Infor Support portal (Concierge) knowledge base using the full text, not just the code, and filter by your M3 version.
  7. 7Fix the data or the setup the message points to, then repeat the exact action to confirm.

How M3 messages are structured

M3 messages are a three-letter prefix and a three-digit number, such as the ID in your question. The prefix groups messages by area and the number identifies one text. The text may contain a field name or value, and the same ID can read differently in each language.

Because of that structure, the ID alone is a weak search term. Searching forums for only the ID returns answers for other versions or other programs. The text, the program and the field together are what identify the problem.

Diagnose through the program, not the code

Most M3 messages are validation messages. The program rejected a value against a rule: a code that does not exist in a related file, a status that does not allow the action, a date outside an open period, or a missing authority. Walk through the field that holds the cursor and verify the value against the master data it references.

For API users the same rule applies. Call the corresponding read transaction first and compare it with the record you tried to write. Missing prerequisite records are the most common cause of a rejected write.

Checklist for any M3 message
1. Full message text + ID
2. Program / panel and option used
3. Field with the cursor
4. Company, division, user, role
5. Same action works for another user? -> authority
6. Same action works in another division? -> setup data

Customizations and roles

If one user hits the message and another does not, compare roles first. M3 hides or blocks functions through authorizations, and some messages are the visible side of a blocked option.

Scripts and extensions can raise their own messages that look like standard ones. Disable personalization for a test session before you escalate to Infor.

Try it here, free

Infor M3 MI API Transaction Call Generator

Open full tool

Fill in program, transaction and parameters to get a ready M3 REST call as URL, curl and a JavaScript fetch snippet.

Common pitfalls

  • !Trusting a forum post that explains the same ID for a different version or program.
  • !Copying only the message ID into a search and ignoring the text, program and field.
  • !Fixing the data in production without reproducing it in a test environment first.
  • !Ignoring the user and role comparison when only some users see the error.
  • !Assuming it is a bug when it is a validation rule working as designed.

How an ERP-grounded AI assistant handles this

A grounded assistant can take the full message text, the program and the record keys, then read the related master data and show which referenced value is missing or in the wrong status. Netray builds this as a read-only layer over M3 data that can run on your own servers, and it shows the query it ran so an administrator can check it.

Frequently asked questions

Is EVS006 a bug in M3?

Usually not. Most M3 messages are validation results that tell you a rule failed for the data or the setup. Treat it as a bug only after you reproduce it with clean data, a standard role and no customization.

Where do I see the full text of an M3 message?

In the message bar or dialog in the client, in the MI API response for integrations, and in the Business Engine log with a timestamp. The client text is the most useful because it includes the field.

Can I get message definitions from Infor?

The Infor documentation library and the support portal describe messages by program. Use your version and the full text when you search, not only the code.

Related

Error fix

M3 API Error: Record already exist

Record already exist means the MI Add transaction you called is trying to insert a key that is already present in the target M3 table, most often because a prior call succeeded and was retried, or because the key fields you built do not match what you think they match. Read the errorField and errorFieldGroup attributes on the response to see exactly which key field M3 flagged, then either switch to the matching Chg (change) transaction or fix the key construction in the caller.

Error fix

M3 API Error: Not Authorized to Program

Not authorized to program (or the equivalent transaction-level authorization error) means the M3 user ID the integration authenticates as can log in fine but has not been granted access to that specific MI program, transaction, or company/division through its authority group. Fixing it means adding the program/transaction to the integration user's authority group in M3, not changing anything in the calling code.

Advanced

Infor M3 Security Settings: Roles, Authorization and Setup

M3 security combines who the user is, the roles they hold, which programs and options a role may use (function authority), and which companies, divisions, facilities and warehouses it may work in (data scope). You set it up by connecting users to roles and roles to authorizations, then audit with the security reports.

Advanced

Paging M3 API MI List Transactions Past the Default Record Limit

M3 List transactions (the read/browse transaction most MI programs expose, such as CRS610MI.LstByNumber or OIS100MI.LstOrderHead) cap the rows returned per call using the MaxReturnedRecords input field, and by default many clients leave it low or unset, which looks like the API silently truncating results. Set MaxReturnedRecords explicitly, then loop the call using the last key values from the previous page as the starting position until fewer rows than the limit come back.

How-to

How to Build a Grid Mapping in M3 Enterprise Collaborator (MEC)

M3 Enterprise Collaborator (MEC) moves data between an external format (EDI, flat file, XML) and M3's own API by chaining a collection step (getting the document in), a grid mapping step (field-level transformation from source structure to M3 API call structure), and a delivery step (executing the mapped MI transaction). Building a new mapping means defining the source document structure, building the grid that maps each source field to its M3 API field, and testing with representative sample documents before going live.

How-to

How to Add a Personalization Script to an M3 H5 Panel

M3 H5 lets an administrator attach a JavaScript personalization script to a specific panel of a specific program, using the MForms client API to read fields, react to panel and field events, and adjust the UI (hide fields, set defaults, validate input) without modifying the underlying M3 program. Scripts are written and attached through Personalization mode in H5, saved against the panel/program combination, and deployed to the users or roles who should see the behavior.

AI for ERP

Infor M3 AI: A Practical Path from MI Programs to a Private Assistant

Infor M3 AI explained: grounded natural-language answers over MI programs and MEC, agents for distribution and manufacturing, on-prem or EU private cloud.

Stuck on Infor M3?

Talk to engineers who work inside Infor M3 every week, and who build private AI that answers these questions from your own ERP data.

Get Infor M3 alerts

Support and maintenance deadlines, release changes that affect Infor M3 sites, and new free Infor M3 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor M3: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor M3? Start with the Infor M3 guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software