Private AI Layer for Infor M3 On-Prem: Reference Architecture
how to add AI to Infor M3 on-prem
Also searched as
- Infor M3 AI integration without cloud
- M3 API MI programs AI assistant
- private LLM for Infor M3 DB2 IBM i
- Infor M3 MITMAS read-only AI
Short answer
For Infor M3 on-prem, use the M3 API (MI programs) for permission-aware record access, a read-only reporting copy of the M3 database for aggregates, a local retrieval index for documents, and an open-weight model on your own GPUs. Mirror M3 users, companies, divisions and warehouse authorities in the tool server and send writes only through MI programs with human approval.
Applies to: Infor M3 on-premises (Business Engine on IBM i/DB2, Oracle or SQL Server) with M3 API (MI programs) and Infor ION
How to build a private AI layer on Infor M3
- 1List the M3 companies, divisions, facilities and warehouses in scope and the target questions.
- 2Identify the MI programs that return the data (for example MMS200MI for items, OIS100MI for customer orders, PPS200MI for purchase orders) and confirm access with your M3 admin.
- 3Stand up a read-only reporting copy of selected M3 tables for aggregates and history.
- 4Index documents, drawings and attachments locally with company and ACL metadata.
- 5Expose named read actions through an MCP or tool server mapping to specific MI transactions or parameterised queries.
- 6Serve an open-weight model on local GPUs and log every prompt, tool call and answer.
- 7Phase the rollout: read-only questions, drafts, then approved actions through MI programs.
Data access paths in M3
M3 data sits in the Business Engine database: DB2 for i on IBM i installations, or SQL Server or Oracle elsewhere. Tables use five-letter names such as MITMAS for item master, MITBAL for item balances by warehouse, OOHEAD and OOLINE for customer orders, MPHEAD and MPLINE for purchase orders, MWOHED for manufacturing orders, with the company number (CONO) as the first key field.
The supported programmatic layer is the M3 API: MI programs (for example MMS200MI with transaction GetItmBasic) called over REST, usually through the ION API gateway, or directly on the M3 API endpoint. MI programs apply M3 business rules and authorities, so they suit record lookups and write-back. A reporting copy is better for aggregates and history.
Documents attach through M3 document management and often live on file shares and in other systems; index them separately.
GET /M3/m3api-rest/execute/MMS200MI/GetItmBasic?ITNO=BRK-1001 Authorization: Bearer <token> -- Verify the endpoint path and required fields for your M3 and ION configuration.
SELECT MMITNO, MMITDS, MMSTAT FROM MITMAS WHERE MMCONO = 100 AND MMSTAT = '20'; -- Library or schema name depends on your installation.
Reference architecture
Inside your network run: a reporting copy of selected M3 tables, a document index, a tool server, a model server and an audit store. Credentials stay in the tool server; the model only sees tool results.
On IBM i, a journal-based replication or scheduled copy to a Linux or Windows reporting database keeps the Power system load low. If you use ION, keep the gateway inside the boundary; air-gapped sites need local identity and no external callbacks.
A 8B to 32B open-weight model is enough for lookups and summaries; keep vLLM or Ollama on a separate GPU host rather than on the M3 server.
Permissions and write-back
M3 authorisation is granular: users and roles get authority to programs, and data authority by company, division, facility and warehouse. Reproduce that: authenticate the user through your identity provider, call MI programs with that user's identity where possible, and filter reporting-copy queries by the same company, division and warehouse lists.
Write-back: use MI programs such as order or purchase change transactions only after a named user approves a drafted action. Keep the assistant out of direct database writes.
Sizing, limits and honest caveats
For a few hundred named users with 10 to 25 percent daily activity, one to two inference GPUs typically cover peak. Document indexes of 100,000 to 1,000,000 pages usually sit in the tens of GB.
Limits: MI programs return field codes that need reference-data lookups to read well; transaction names and fields vary by version, so test each; heavy aggregate questions need the reporting copy, not repeated API calls. If Infor's own M3 analytics already answer your questions, add an LLM only where natural language or documents are the gap.
Try it here, free
Infor M3 MI API and ION API Gateway Security Checklist
Security checklist for on-prem M3 13.x integrations using MI programs over REST and the ION API gateway: accounts, authorization, transport, monitoring and lifecycle.
Common pitfalls
- !Calling MI programs in loops for aggregate questions instead of using a reporting copy.
- !Ignoring company, division and warehouse authority and returning cross-division data.
- !Showing raw codes without joining the reference data that explains them.
- !Hard-coding MI transaction names without checking the version.
- !Pointing the model server at the Business Engine host and starving it.
How an ERP-grounded AI assistant handles this
ERPray already targets Infor M3: it reads through the M3 API and a reporting copy, shows the call or query behind each answer, honours M3 roles, and runs on your own GPUs. Write actions stay drafts until a user approves them.
Frequently asked questions
Can M3 AI run on-prem only?
Yes. The M3 API, a reporting database copy, a document index and an open-weight model can all stay inside your network. ION can also be on-prem.
Do I use MI programs or SQL?
MI programs for record lookups, business rules and writes; SQL on a reporting copy for aggregates and history. Both sit behind a tool server.
How does M3 authority carry over?
Map users to M3 users and their company, division, facility and warehouse authority in the tool server and apply it to both API calls and retrieval.
Is IBM i a problem?
No, but keep the model on separate GPU hardware and replicate data off the Power system for reporting to protect production performance.
Related
Fix a 401 Unauthorized error from Infor ION API
A 401 from ION API almost always means the credentials in the .ionapi file no longer match what ION API Gateway expects - not that the password is simply wrong. Check whether the Authorized App or service account behind the file was revoked, regenerated, expired, or issued for a different tenant, then re-test with a direct OAuth2 client_credentials call before touching any calling code.
Error fixDiagnose and fix a failed BOD document flow in ION Desk
A Document Flow showing Failed in ION Desk means a BOD (Business Object Document) stopped either at schema validation, at the mapping step, or at the target application. Open the failed instance's detail to see the exact failing element, fix the source data or mapping, then use Resubmit rather than re-triggering the original transaction to avoid duplicates.
Error fixM3 API Error: Record already exist
Record already exist means the MI Add transaction you called is trying to insert a key that is already present in the target M3 table, most often because a prior call succeeded and was retried, or because the key fields you built do not match what you think they match. Read the errorField and errorFieldGroup attributes on the response to see exactly which key field M3 flagged, then either switch to the matching Chg (change) transaction or fix the key construction in the caller.
AdvancedPaging M3 API MI List Transactions Past the Default Record Limit
M3 List transactions (the read/browse transaction most MI programs expose, such as CRS610MI.LstByNumber or OIS100MI.LstOrderHead) cap the rows returned per call using the MaxReturnedRecords input field, and by default many clients leave it low or unset, which looks like the API silently truncating results. Set MaxReturnedRecords explicitly, then loop the call using the last key values from the previous page as the starting position until fewer rows than the limit come back.
Error fixM3 API Error: Not Authorized to Program
Not authorized to program (or the equivalent transaction-level authorization error) means the M3 user ID the integration authenticates as can log in fine but has not been granted access to that specific MI program, transaction, or company/division through its authority group. Fixing it means adding the program/transaction to the integration user's authority group in M3, not changing anything in the calling code.
How-toHow to Build a Grid Mapping in M3 Enterprise Collaborator (MEC)
M3 Enterprise Collaborator (MEC) moves data between an external format (EDI, flat file, XML) and M3's own API by chaining a collection step (getting the document in), a grid mapping step (field-level transformation from source structure to M3 API call structure), and a delivery step (executing the mapped MI transaction). Building a new mapping means defining the source document structure, building the grid that maps each source field to its M3 API field, and testing with representative sample documents before going live.
AI for ERPInfor M3 AI: A Practical Path from MI Programs to a Private Assistant
Infor M3 AI explained: grounded natural-language answers over MI programs and MEC, agents for distribution and manufacturing, on-prem or EU private cloud.
AI for ERPAI Agents Over Infor ION API, BODs, and the Infor Data Lake
Build AI agents on Infor ION API Gateway, BODs, and Data Lake, alongside or instead of Infor's own GenAI features, with your choice of model and hosting.
Stuck on Infor M3 on-prem?
Talk to engineers who work inside Infor M3 on-prem every week, and who build private AI that answers these questions from your own ERP data.
New to Infor M3? Start with the Infor M3 guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor M3 MI API and ION API Gateway Security ChecklistSecurity checklist for on-prem M3 13.x integrations using MI programs over REST and the ION API gateway: accounts, authorization, transport, monitoring and lifecycle.
- Infor M3 Private AI Layer Blueprint GeneratorFill in your Infor M3 environment and get a ready-to-share architecture plan for a private, on-prem AI assistant.
- Infor M3 AI Assistant Sizing and Value CalculatorSize the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor M3.
ERP fixes and how-tos
- Infor M3 SDK, MI APIs and REST API Documentation GuideDeveloper map of the Infor M3 SDK: MI programs, the REST API through ION API, authentication, example calls, and where to find the official documentation.
- Infor M3 API Swagger: Discover MI Programs, Authenticate and Test CallsHow to find M3 MI programs and REST APIs through the ION API Swagger and OpenAPI documentation, authenticate with an ionapi file, and test your first call.
- How to Call M3 API (MI Programs) Through ION APIHow to build and authenticate an ION API call to an M3 MI program: service account setup, the .ionapi file, the execute endpoint URL, and request/response shape.
Runs with your ERP
- Infor GenAI with Infor LN and M3: assistant and embedded featuresWhat Infor GenAI does in LN, M3 and CloudSuite Industrial, how it runs on Amazon Bedrock, its limits for on-prem plants, and when a private layer fits.
- Infor EDI Managed Service and Infor M3 over IONHow Infor's EDI managed service connects to Infor M3 through ION with pre-built trading partner links: data flows, setup steps, pitfalls and a private AI layer.
- Infor M3 Scheduling Workbench and M3: finite scheduling explainedHow Infor M3 Scheduling Workbench schedules against capacity and materials and writes orders back to M3 via PSMI, with setup, pitfalls and AI help.
Guides
- Infor M3 API Integration with MI Programs and RESTInfor M3 API integration guide covering MI programs, the m3api-rest v2 endpoint, ION API gateway OAuth, Event Hub, and error handling for reliable interfaces.
- Infor M3 API Toolkit: A Developer's Guide to MI Programs and MvxAPIBuild robust integrations with the Infor M3 API toolkit. Learn MI programs, MvxAPI patterns, and transaction handling for M3 13.4+ environments.
- Infor M3 API Performance Optimization GuideOptimize Infor M3 API performance. MI program tuning, API call batching, caching strategies, and connection pool management for high-volume integrations.
AI on your ERP
- Infor M3 AI: A Practical Path from MI Programs to a Private AssistantInfor M3 AI explained: grounded natural-language answers over MI programs and MEC, agents for distribution and manufacturing, on-prem or EU private cloud.
- Infor M3 Supply Chain Planning With AI That Explains the MRP OutputAI for Infor M3 supply chain planning: explain MRP action messages, review planned orders, and trace shortages through MITBAL and MITMAS on private infrastructure.
Integrations
- How to build an MCP server for Infor M3How to build a Model Context Protocol server for Infor M3: which read-only tools to expose over MI programs, ION or on-prem auth, transports, scoping and audit.
- How to add AI agents to Infor M3How to add AI agents to Infor M3: a tool layer over MI programs and ION, read-first workflows for POs, MO and CO exceptions, and human approval on writes.