ERP toolkits / Infor
Infor M3 toolkit
Infor M3 (formerly Movex) is used in process, fashion, food and distribution. Integration runs through M3 API (MI) programs, and on-prem versions remain common.
Free tools that run in your browser, fixes written for admins and developers, and how to put a private AI assistant on top of Infor M3 without your data leaving your servers.
Plan your Infor M3 work
Free planning apps built for Infor M3. Your work saves to your Netray account.
Training Path Builder
Week by week ERP training plans by role and module, with real screens to practice on, dated lessons, progress tracking and export.
Upgrade Path Planner
Pick your current and target ERP release and describe your landscape. Get the verified upgrade path, the changes in every release you cross, a risk score, an effort range and a regression test plan.
ERP Table and Field Explorer
Search the core database tables of SyteLine, LN, M3, JD Edwards, SAP, Oracle EBS, NetSuite, Epicor and SYSPRO by name, field or description, see keys and joins, and generate a JOIN query skeleton.
Integration and EDI Designer
Pick business objects and target systems and get the ERP's real interface for each flow (BODs, IDocs, APIs, open interface tables, EDI documents), a field-level starter map and effort notes.
Module Fit and Gap Explorer
Map your manufacturing requirements to an ERP's official modules, see native fit, add-ons and gaps, and compare two ERPs side by side.
ERP Cost of Ownership Model
Five-year ERP total cost model built from your own license or subscription quotes: users, deployment, infrastructure, implementation effort, staff and support.
Implementation Partner Scorecard
Weighted scorecard and ERP-specific interview question bank for comparing ERP implementation partners and consultants.
Design private AI for Infor M3
The builder starts with Infor M3 connected the way it supports. Pick a model and GPUs, add documents, and export the architecture.
Loading the architecture builder...
Free Infor M3 tools
Calculators and simulators (13)
- Infor M3 Implementation Effort Estimator
- M3 Safety Stock and Reorder Point Calculator
- M3 Economic Order Quantity (EOQ) Calculator
- M3 Manufacturing Lead Time Calculator
- M3 Exponential Smoothing Forecast Calculator (Holt Trend)
- M3 Standard Cost Rollup Calculator
- M3 MI API Batch Load Time Estimator
- M3 Customer Order Margin and Discount Calculator
- M3 Inventory Turnover and Days on Hand Calculator
- Infor M3 AI Assistant Sizing and Value Calculator
- Infor M3 BE Upgrade Modification Retrofit Effort Calculator
- Infor M3 EXPORTMI Extraction Call Volume Calculator
- Infor M3 ION BOD Message Volume Calculator
Code and document generators (13)
- Infor M3 MI API Transaction Call Generator
- Infor M3 MEC Mapping Design Template
- Infor M3 Functional Specification Template
- Infor M3 User Acceptance Test Script Template
- Infor M3 Cutover Plan Template
- Infor M3 Implementation Statement of Work Template
- Infor M3 SQL Query Generator
- Infor M3 Bookmark URL Generator
- Infor M3 Private AI Layer Blueprint Generator
- Infor M3 EXPORTMI Select Query Generator
- Infor M3 H5 Script TypeScript Template Generator
- Infor M3 ION API Gateway OAuth 2.0 Python Client Generator
- Infor M3 CSV to MI API Bulk Loader Script Generator
Reference tables and worksheets (18)
- Infor M3 Program Reference (MMS001, OIS100, PMS100)
- Infor M3 Customer Order Status Tracking Worksheet
- Infor M3 Item Master Upload Worksheet
- Infor M3 Facility and Warehouse Structure Worksheet
- Infor M3 Fit-Gap Analysis Worksheet
- Infor M3 Data Conversion Mapping Worksheet
- Infor M3 Interface and Integration Inventory Worksheet
- Infor M3 Core Database Tables Reference
- Infor M3 Field Name Glossary
- Infor ION BOD Verbs and Nouns Reference for M3
- Infor M3 Item Planning Parameter Worksheet
- Infor M3 MI API Program List Reference (MMS200MI, OIS100MI, PPS200MI...)
- Infor M3 Order Status Codes Reference (CO, PO, MO, DO)
- Infor M3 H5 Hot Keys and Function Keys Reference
- Infor M3 OOHEAD and OOLINE Customer Order Columns Reference
- Infor M3 Inventory and Allocation Tables Reference (MITBAL, MITLOC, MITALO, MITTRA)
- Infor M3 Accounting Dimensions and Chart of Accounts Worksheet
- Infor M3 MDBREADMI and Custom List API Design Worksheet
Checklists (7)
Guides
Private AI layer architecture (1)
How-to and fixes (35)
- M3 API Error: Record already exist
- Paging M3 API MI List Transactions Past the Default Record Limit
- M3 API Error: Not Authorized to Program
- How to Build a Grid Mapping in M3 Enterprise Collaborator (MEC)
- How to Add a Personalization Script to an M3 H5 Panel
- How to Create a New Item in M3 (MMS001)
- How to Enter a Customer Order in M3 (OIS100)
- How to Run Period End Close in M3
- How to Attach and View Documents in M3 with IDM
- How to Call M3 API (MI Programs) Through ION API
- Infor M3 negative on-hand balance: how to find it and fix it
- Infor M3 manufacturing order material not allocated or short
- Infor M3 MRP not creating planned orders: what to check
- Infor M3 Business Engine upgrade checklist: customizations and integrations
- Infor M3 goods receipt against a purchase order, and how to reverse it
- Infor LN and M3 BOD Documentation: Definitions, Mapping and Tracing in ION
- Infor M3 API Swagger: Discover MI Programs, Authenticate and Test Calls
- Infor M3 Planning Time Fence: Settings, the Planning Workbench and Typical Mistakes
- Infor M3 Ad Hoc Report: Your Options, Step by Step, and Their Limits
- Infor M3 Export to Excel: Lists, Report Output and the API Route
- How to Change Division in Infor M3
- EVS006 in Infor M3: What It Means and How to Fix It
- Infor M3 Allocation Table: MITALO Reference and Queries
- Infor M3 Standard Cost: How to Set, Roll Up and Revalue
- Infor M3 Date Format: User Setting, API and Database
- Infor M3 SDK, MI APIs and REST API Documentation Guide
- Infor Factory Track for M3: Shop Floor Data Collection Explained
- Infor M3 Security Settings: Roles, Authorization and Setup
- Pick Line vs Wave Line in Infor M3
- Infor M3 Scheduling Options (APS162 and Job Scheduling)
- Infor M3 Master Data: The Core Objects and the Programs That Maintain Them
- Infor M3 Report Manager: Building, Running and Alternatives
- How to record an expense in the general ledger in Infor M3
- Infor M3 chart of accounts: structure and setup
- Infor M3 order to cash: the flow and the programs
Add-on products that run with it (10)
- TrueCommerce EDI and Infor M3
- HxGN EAM and Infor M3 via Infor ION
- Infor M3 Scheduling Workbench and M3: finite scheduling explained
- ecosio EDI and Infor M3: orders, dispatch advices and invoices
- Infor EDI Managed Service and Infor M3 over ION
- Redzone and Infor M3: scheduled runs out, production counts back
- Infor Factory Track and Infor M3: handheld scanning transactions
- ProcessWeaver multi-carrier shipping and Infor M3
- Medius AP automation and Infor M3 via Medius Connect
- Infor Nexus Network TMS with QAD Precision parcel for Infor ERPs
Integrations (12)
- How to add AI agents to Infor M3
- How to use ChatGPT with Infor M3
- How to use Claude with Infor M3
- How to build an MCP server for Infor M3
- How to add an AI chatbot to Infor M3
- How to connect Power BI to Infor M3
- How to add WhatsApp to Infor M3
- How to add Microsoft Teams to Infor M3
- How to add Slack to Infor M3
- How to automate email in Infor M3
- How to add document OCR to Infor M3
- How to build a mobile app for Infor M3
AI use cases (7)
- Infor M3 AI: A Practical Path from MI Programs to a Private Assistant
- AI for Nordic Manufacturers Running Infor M3 or IFS
- Infor M3 AI for Food and Beverage: Traceability, Yield and Shelf Life
- Infor M3 AI for Fashion and Apparel: Seasons, Sizes and Allocation
- Infor M3 AI for Chemical Manufacturers: Formulas, Batches and Safety Data
- Infor M3 Supply Chain Planning With AI That Explains the MRP Output
- Infor M3 Customer Order Management With AI for Status, Allocation and Promise Dates