How-toJobBOSS / JobBOSS2 (ECI)Installation / Workstation setup

How to Install JobBOSS: Server, Workstations and Drivers

Question
how to install jobboss

Also searched as

  • jobboss workstation
  • jobboss workstation driver
  • jobboss client install error

Short answer

A JobBOSS install has two halves: a SQL Server database on a server, and a client (workstation) install on each PC that connects to it. Prepare the SQL Server instance and account permissions first, install the server components from the media ECI provides, then run the workstation setup on each PC and point it at the server. Most install failures come from SQL connectivity, permissions or missing prerequisites, not from the installer itself.

Applies to: JobBOSS and JobBOSS2 on-premises installations on Windows with SQL Server. Exact installers, versions and prerequisites come from ECI and change by release, so follow the install guide for your version.

Install JobBOSS from scratch

  1. 1Get the install media and release notes for your exact version from ECI or your reseller. Read the supported Windows and SQL Server versions before you start.
  2. 2Prepare the server: current Windows Server patches, enough disk for data and backups, a static address or DNS name, and the right time zone.
  3. 3Install or confirm SQL Server (or Express if your licence and database size allow it). Enable TCP/IP in SQL Server Configuration Manager and note the instance name and port.
  4. 4Open the firewall for the SQL Server port between workstations and the server, and allow the SQL Browser service if you use named instances.
  5. 5Run the server install, create or restore the JobBOSS database, and note the database name and the SQL login the application will use.
  6. 6On each workstation, install the client from the workstation setup, with any required runtime prerequisites, then configure the connection to the server and database.
  7. 7Log in as an administrator, test a few core screens and a report, and set up backups before users start entering data.

What the workstation needs

A workstation needs the client application, the runtime libraries the release requires, and a working database connection. What people call the JobBOSS workstation driver is generally the database connectivity component (ODBC or SQL client driver) that the client uses. If the client reports it cannot connect, check that driver and its bitness first.

Install as an administrator, and avoid mapping drives through different credentials than the user will run with, because mapped paths for attachments and report output are a common source of permission errors.

Checking SQL Server connectivity

From the workstation, test the connection outside JobBOSS. If sqlcmd or an ODBC test cannot reach the server, the application never will. The problem is almost always one of four things: TCP/IP disabled, firewall closed, wrong instance name, or the SQL login lacking rights.

sqlcmd -S SERVERNAME\INSTANCE -U app_login -P *** -Q "SELECT @@VERSION"
REM Check the port from a workstation
powershell Test-NetConnection SERVERNAME -Port 1433

Common install and first-run errors

Typical failures are an installer that stops on a missing prerequisite, a client that starts but shows a login or database error, and permissions errors on shared folders. Read the exact message and the installer log rather than retrying, because retrying often leaves partial components behind.

If a workstation worked and then stopped after a Windows update or a SQL change, compare it with a working machine: client version, driver version and connection settings. Keep the client version the same as the server database version, since a mismatch can fail at login.

For anything involving licence keys or database creation, use ECI support, since those steps are specific to your contract.

Try it here, free

JobBOSS Classic AI Assistant Sizing and Value Calculator

Open full tool

Estimate peak concurrency, GPU count, index size, hours saved and payback for a private AI assistant on JobBOSS Classic.

Common pitfalls

  • !Installing clients of a different version from the database.
  • !Leaving SQL TCP/IP disabled, so workstations cannot connect.
  • !Using the sa account for the application instead of a least-privilege login.
  • !Putting the database on the same disk as backups.
  • !Skipping a test restore and backup schedule before go-live.
  • !Installing the client while logged in as a user who will not use it.

How an ERP-grounded AI assistant handles this

Installation is not something an AI assistant should do for you. After it is live, a read-only assistant on the same network can answer questions about the data in plain language without installing anything on every workstation, and it stays inside your firewall when deployed on-prem.

Frequently asked questions

What is the JobBOSS workstation?

A PC with the JobBOSS client installed and configured to connect to the JobBOSS database on the server. Each user machine needs one.

Does JobBOSS need SQL Server?

Yes. Data is held in a Microsoft SQL Server database, so the server must have a supported SQL Server edition before you install.

Why can't my workstation connect?

Check TCP/IP is enabled, the firewall allows the SQL port, the instance name is right, and the SQL login has rights. Test with sqlcmd outside JobBOSS.

Can I install on a laptop for testing?

Yes, a test installation against a restored copy of your database is a good way to rehearse upgrades. Use test data, not live access.

Related

How-to

How to Back Up the JobBOSS Database

JobBOSS stores its data in a Microsoft SQL Server database, so a backup is a SQL Server backup, not a copy of program folders. Take a full backup on a schedule, verify it with RESTORE VERIFYONLY, copy it off the server, and take an extra one immediately before any upgrade. Practise a restore into a test database at least once so you know it works.

How-to

JobBOSS 2 vs JobBOSS: Differences, Versions and How to Update

JobBOSS2 (often written JobBOSS squared or JobBOSS 2) is ECI's newer job-shop ERP, built as a successor to the classic JobBOSS product. Classic JobBOSS is the long-running SQL Server based system; JobBOSS2 is a rewritten platform with a different interface and architecture. Updating within a product is a patch or version install; moving from classic to JobBOSS2 is a migration project with testing, not a simple update.

Error fix

JobBOSS Script Error: How to Diagnose It, and What Triggers and Custom Apps Are

A script error in JobBOSS means custom code attached to a screen or event failed, not that the core application is broken. Note the exact message and the action that caused it, identify which custom script or trigger fired, and test the same action with scripts disabled or on a test copy. Common causes are a changed field or table, a missing reference or driver, a permissions problem, and bad data.

Error fix

E2 Shop System Error 5093: Causes and How to Troubleshoot

We could not find an authoritative public definition of E2 error 5093, so treat any single-cause answer with caution. In practice, numbered E2 errors raised at login or while opening a module come from the client talking to the database: a changed server name, a SQL permission or login problem, a missing or mismatched driver, or a network or firewall change. Isolate which with the checks below and give Shoptech support the exact context.

How-to

E2 Shop System 7.2 (Shoptech): Versions, Manuals, Training, Support and Reporting

E2 Shop System is Shoptech's ERP and MRP software for job shops and make-to-order manufacturers, covering quoting, orders, scheduling, purchasing, inventory, shop floor tracking and accounting integration. Version 7.2 is one release in its line. For manuals, training, support and upgrade eligibility, Shoptech and its resellers are the authoritative source, so confirm details for your own license.

How-to

JobBOSS Public API: What Integration Options Exist for JobBOSS and JobBOSS2

Classic JobBOSS stores data in Microsoft SQL Server, so most custom integrations read it by SQL and write through supported import tools or the vendor's SDK rather than by raw inserts. JobBOSS2 is a newer product and its API and database access depend on how it is hosted and licensed, so confirm with the vendor what is available for your edition before designing around it.

AI for ERP

AI for ECI JobBOSS2 and E2 Shop System

Add AI to ECI JobBOSS2 or E2 Shop System for faster quoting, tighter scheduling, and shop-floor answers, without sending your job data to the cloud.

AI for ERP

AI Agents for ERP, Running On-Prem

A practical guide to on-prem AI agents for ERP: what they can safely automate, where human approval belongs, and how to design the guardrails.

Stuck on JobBOSS / JobBOSS2 (ECI)?

Talk to engineers who work inside JobBOSS / JobBOSS2 (ECI) every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Troubleshooting

Software