How-toPaperless Parts (quoting) with job shop ERPQuoting / Integration / API

Paperless Parts API Documentation and ERP Integration

Question
paperless parts api documentation

Also searched as

  • paperless parts integration connector
  • paperless parts sso single sign on
  • paperless parts workflow
  • paperless parts nesting
  • paperless parts training videos

Short answer

Paperless Parts is a quoting and order management platform for custom manufacturers. It publishes developer documentation for an API, and it supports integrations that push accepted quotes and orders into an ERP. The practical pattern is to treat Paperless Parts as the system of record for quotes and send the won order, parts and routing into the ERP.

Applies to: Paperless Parts cloud platform with a job shop or mid-market ERP such as JobBOSS, E2, ProShop, Global Shop or similar; capabilities vary by plan, so confirm with the vendor

How to approach a Paperless Parts to ERP integration

  1. 1Ask Paperless Parts which integration options your plan includes: a native connector for your ERP, a file or API based export, or custom work. Native connectors exist for several job shop ERPs, but check the current list for yours.
  2. 2Read the vendor's developer documentation for authentication, the order, quote and part objects, and rate limits. Use their portal rather than a copy, because endpoints change.
  3. 3Define the handoff event: usually an order accepted or a quote marked won. Decide what must cross: customer, part numbers, quantities, materials, operations, due dates, drawings and notes.
  4. 4Map each field to the ERP: customer to customer master, part to item master, operations to routing, with a rule for new customers and new parts.
  5. 5Build the sync with the vendor connector, a webhook plus a small service, or scheduled API polling, and write a clear log of each transfer.
  6. 6Test with a handful of orders including revisions, rework and cancelled orders, then decide who owns exceptions.
  7. 7Plan SSO and user provisioning with your IT team before rollout, so staff do not keep local passwords.

What the API is for

A vendor API for a quoting tool typically covers reading and creating quotes, orders and parts, retrieving files, and sometimes receiving events. In practice integrators use it for three jobs: pulling won orders into the ERP, pushing ERP-side status back to the customer portal, and feeding quote data into reporting.

Because details differ by plan and change over time, treat any endpoint list in a third-party article as a hint only. Use the vendor's documentation and a sandbox or test account for anything you build.

SSO, workflow and nesting

Single sign-on for a cloud quoting tool is normally SAML or OIDC against your identity provider, such as Microsoft Entra ID or Okta, and is often limited to higher plans. Ask for the exact protocol, whether just-in-time provisioning is supported and how roles map to estimator, sales and admin groups.

Workflow and nesting are product features, not API features: quoting workflows route a request through estimators and approvers, and nesting estimation helps price sheet metal by estimating material use. Verify how nested material cost reaches the quote and whether nesting output travels into the ERP, because often it does not.

Training and getting unstuck

The vendor provides help articles, onboarding and video tutorials; use those for estimator training and keep a short internal runbook for your own pricing rules, material tables and approval thresholds. Integration issues are usually mapping problems, such as a part number that exists in the ERP under a different revision scheme.

Try it here, free

Paperless Shop Floor ROI Calculator

Open full tool

Calculate labor time saved and rework avoided by replacing paper travelers and work orders with digital shop-floor terminals or tablets.

Common pitfalls

  • !Building directly against endpoints from an old blog post instead of current vendor documentation.
  • !No rule for duplicate customers and parts, so each won order creates new masters.
  • !Syncing the order without the routing, then re-keying operations in the ERP.
  • !Treating SSO as an afterthought and leaving local accounts active after offboarding.
  • !Assuming nesting results flow into the ERP bill of material without checking.

How an ERP-grounded AI assistant handles this

A private assistant can sit beside both systems, comparing quoted routings and costs in Paperless Parts to actual job costs in your ERP and flagging estimators whose quotes consistently miss. Because it runs on your infrastructure, drawings and customer terms are not sent to a public model.

Frequently asked questions

Does Paperless Parts have an API?

Yes, the vendor publishes developer documentation for integrations. Access, endpoints and limits can depend on your plan, so confirm with the vendor and use their current documentation instead of a third-party copy.

How do I connect Paperless Parts to my ERP?

Check for a native connector for your ERP, otherwise use the API or webhooks to move won orders, parts and routings into the ERP. Define the handoff event and the field mapping first.

Does Paperless Parts support SSO?

Single sign-on is typically available through a standard identity provider integration, sometimes only on certain plans. Ask the vendor for the protocol, provisioning behavior and role mapping before you commit.

Does nesting data go into the ERP?

Not automatically in most setups. Nesting helps estimate material in the quote. Whether nested results become ERP material requirements depends on the connector, so test it with a real order.

Related

How-to

Oracle ERP API Documentation: Where It Is and How to Start

Oracle publishes its ERP APIs per product on docs.oracle.com. For Fusion Cloud ERP and SCM there are REST API guides, SOAP web service guides, FBDI file imports and BI Publisher reports; for NetSuite there are SuiteTalk REST and SOAP, SuiteQL and RESTlets. Pick the product first, then the style of API, then match your authentication and the exact release version.

How-to

How to Close a Job in JobBOSS2

A job in JobBOSS2 will not close cleanly until every routing operation is marked complete, all material has been issued or returned, and all labor and cost transactions are posted. Review the job's Work In Process detail first, clear any open items, then change the job status to Complete and run final job costing before it is locked.

Error fix

Fix Katana API 429 Too Many Requests

HTTP 429 from the Katana public API means your integration exceeded the per-key request allowance for the current time window. Fix it by honoring the retry headers, backing off with jitter, paging with the largest allowed page size, caching reference data such as products and variants, and replacing polling loops with scheduled incremental syncs.

How-to

MRPeasy Materials Shortage: Plan Purchases Correctly

MRPeasy compares the demand from customer orders and manufacturing orders with available stock, booked stock and open purchase orders, and flags what is short. To act on it, review the shortages, confirm item lead times and minimum stock levels, then create purchase or manufacturing orders and re-check planned dates.

Error fix

E2 Shop System Error 5093: Causes and How to Troubleshoot

We could not find an authoritative public definition of E2 error 5093, so treat any single-cause answer with caution. In practice, numbered E2 errors raised at login or while opening a module come from the client talking to the database: a changed server name, a SQL permission or login problem, a missing or mismatched driver, or a network or firewall change. Isolate which with the checks below and give Shoptech support the exact context.

How-to

E2 Shop System 7.2 (Shoptech): Versions, Manuals, Training, Support and Reporting

E2 Shop System is Shoptech's ERP and MRP software for job shops and make-to-order manufacturers, covering quoting, orders, scheduling, purchasing, inventory, shop floor tracking and accounting integration. Version 7.2 is one release in its line. For manuals, training, support and upgrade eligibility, Shoptech and its resellers are the authoritative source, so confirm details for your own license.

AI for ERP

AI for quote-to-cash in manufacturing and job shop ERPs

AI reads incoming RFQs, drafts quotes from your ERP's own cost and pricing history, and flags parts your shop has never quoted before, keeping the estimator in control.

AI for ERP

AI for Epicor Kinetic Job Shops: Quote History, Job Variance and Schedule Risk

Private AI for Epicor Kinetic job shops: quote-to-job history, JobHead and JobOper variance, subcontract delays and schedule risk, via REST and BAQs.

Stuck on Paperless Parts (quoting) with job shop ERP?

Talk to engineers who work inside Paperless Parts (quoting) with job shop ERP every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software