AI assistant and copilotInfor LNRuns on-prem

Infor GenAI with Infor LN and M3: assistant and embedded features

Infor GenAI is built on Amazon Bedrock. In LN it produces project executive summaries and contract views and answers assistant queries, in M3 it drafts service guidelines and product descriptions, and in CloudSuite Industrial it translates POs and invoices. Infor says the LN Assistant is in limited availability, and the service is cloud-hosted, which matters for on-prem and air-gapped plants.

How Infor GenAI (GenAI Assistant and Embedded Experiences) connects to Infor LN

Embedded in CloudSuite through the Infor platform

These are Infor-delivered features inside the product, not a connector you build. They use Amazon Bedrock through Infor's platform, so availability depends on your Infor cloud deployment and entitlement.

Assistant versus embedded experiences

The Assistant answers questions, while embedded experiences add specific actions such as summaries, descriptions and translations in context. LN Assistant availability is limited, so confirm what your tenant can use.

What data moves

FromToDataWhen
Infor LN, M3 or CloudSuite IndustrialInfor GenAI servicePrompt context such as project, contract, PO or invoice textUser invokes the feature
Infor GenAI serviceUserSummary, draft or answerResponse returned
UserERP recordAccepted text such as a product descriptionUser saves or approves

Setting it up

  1. 1Confirm entitlement and availabilityAsk Infor which features are available for your product, version and tenant, given the LN Assistant is in limited availability.
  2. 2Review the data handling termsUnderstand what is sent to the service, where it is processed and whether it is retained.
  3. 3Classify your dataDecide which projects, contracts and items can be sent to a cloud model and which cannot.
  4. 4Pilot with a small user groupChoose a few users and use cases such as project summaries or item descriptions.
  5. 5Set review rulesMake a person approve any generated text before it is stored or sent to a customer.
  6. 6Measure usefulnessTrack time saved and corrections needed, and drop features that do not earn their place.

What usually breaks

  • !Assuming a feature seen in a demo is enabled for your version or tenant.
  • !Sending export-controlled or customer-confidential content to a cloud model without a policy decision.
  • !Generated item descriptions or translations saved without review, then reaching customers.
  • !Expecting answers across data outside the product scope, such as MES or PLM systems.
  • !Users treating summaries as authoritative without checking the source records.
  • !Features changing between releases so internal training goes stale.

A private AI layer across both systems

Private assistant for restricted data

Where data cannot go to a cloud model, an open-weight model served on your own GPUs can answer questions over LN data, read-only, showing the query used.

Cross-system questions

A private layer can read LN together with documents and neighboring systems such as quality or maintenance data that vendor features do not cover.

Draft-for-approval workflows

Drafts descriptions, summaries and customer replies for a person to approve before anything is written to LN.

Role-aware answers

Answers respect LN roles so users only see data they could already see in the ERP.

Try it here, free

Infor M3 AI Assistant Sizing and Value Calculator

Open full tool

Size the GPUs and estimate the monthly value and payback of a private, on-prem AI assistant for Infor M3.

When something else fits better

  • Use Infor GenAI where your data policy allows cloud processing and the features cover your needs.
  • Use plain LN reporting and BI for questions that are really structured queries.
  • Use a private on-prem assistant where data residency or export control rules out Bedrock.

Frequently asked questions

What does Infor GenAI do in LN?

Infor describes project executive summaries, contract views and answers to assistant queries in LN. The Assistant is described as limited availability, so check with Infor what your tenant and version can actually use.

Does it run on-prem?

It is built on Amazon Bedrock through Infor's platform, which is a cloud service. Plants that run LN on-prem or air-gapped should ask Infor about availability and data handling before counting on it.

Is it enough or do I need another AI layer?

If the embedded features cover your use cases and your data policy allows cloud processing, they may be enough. A private layer makes sense when data must stay inside your network or you need cross-system answers.

Can it change ERP data?

The described features generate summaries, descriptions and translations. Any generated text should be reviewed by a person before it is saved, whichever tool produces it.

Pairing documented at www.infor.com/blog/explore-the-latest-in-infor-genai . Infor GenAI (GenAI Assistant and Embedded Experiences) is a product of Infor; Netray is independent and not affiliated with either vendor.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Integrations

Comparisons