How-toSAP ECC / S/4HANAMM Purchasing / Inventory Management

SAP MM Return to Vendor Process: Return PO, MIGO 161 and Credit Memo

Question
sap mm return to vendor process

Also searched as

  • return delivery to vendor MIGO 161
  • sap return purchase order
  • movement type 122 return to vendor
  • vendor credit memo after return sap

Short answer

There are two standard ways to return goods to a vendor in SAP MM: post a return delivery in MIGO (movement 122, referencing the original material document) or create a return purchase order item and post movement 161. Then settle the money with a credit memo in MIRO or by receiving a replacement.

Applies to: SAP ECC 6.0 and S/4HANA on-premise; standard MM-IM and MM-IV

How to return goods to a vendor

  1. 1Decide the path. If you only need to reverse a received quantity that was a mistake or rejected, use MIGO > Return Delivery against the original material document (movement 122).
  2. 2If the return needs its own document with shipping, a return PO is cleaner: in ME21N, create a PO with the item flagged as Returns Item and reference the original PO.
  3. 3Post the goods issue in MIGO with action Return Delivery, referencing the PO or the material document; stock leaves the plant and the vendor liability reduces.
  4. 4Print or send a return delivery note from the message output, so the carrier and the vendor have a reference.
  5. 5For a credit, enter the vendor's credit memo in MIRO (transaction type Credit Memo) referencing the return PO or the original invoice.
  6. 6For a replacement, create a new PO or a free-of-charge item and receive it normally.
  7. 7Check stock in MMBE and the PO history in ME23N to verify the return posted.

Movement type 122 versus 161

Movement 122 is a return delivery to the vendor against a prior goods receipt. It reverses the original valuation and reduces PO history for the delivered quantity, so it fits cases where the goods did not meet the receiving criteria and you want to undo the receipt in effect.

Movement 161 is the return delivery against a return PO item. It lets you treat the return as a transaction of its own with a separate PO, which suits returns after the invoice is posted or returns that need their own approval and shipment documents.

The decision is organizational: if your audit wants a separate document trail for returns, use the return PO.

Return PO and the invoice indicator

On a return item, the Returns Item checkbox switches the logic. The item's invoice indicator decides whether a credit memo is expected: if it is checked, the return is invoice relevant and the credit memo clears the amount, if not, SAP expects no financial document.

If a return PO item has a price, the return posts at the price on the PO or the valuation of the original receipt, depending on the set-up. Check the resulting price difference postings if the original price has changed.

Scrap, rework and replacement

When the vendor does not want the goods back, post a scrapping movement (551) instead and claim the cost outside the system. When stock is quality-managed, process the usage decision first so the return only touches the rejected quantity.

A replacement delivery is a normal new receipt. A free-of-charge item on the original PO keeps the vendor's price history clean.

-- Find the receipts you can return against
SELECT MBLNR, MJAHR, ZEILE, BWART, MATNR, MENGE, EBELN, EBELP
FROM MSEG WHERE EBELN = '4500001234' AND BWART IN ('101','122','161')

Try it here, free

SAP MIGO Goods Receipt Checklist

Open full tool

Step by step checklist to post a clean goods receipt against a purchase order in MIGO, with critical checks flagged.

Common pitfalls

  • !Returning with 122 after the invoice is posted, which causes a price or quantity difference with the invoice.
  • !Forgetting the Returns Item flag on the return PO, so the item looks like a new purchase.
  • !Not sending a credit memo request to the vendor, leaving the open liability on the vendor account.
  • !Returning more than the unconsumed stock; check stock and batch before you post.

How an ERP-grounded AI assistant handles this

Purchasing teams often want to know which receipts for a vendor were returned, and their credit status. Netray's ERPray can run this kind of lookup in plain language against your own SAP system, read-only by default, showing the query it ran and respecting SAP authorizations, with the model served on your own hardware when the system is on-prem. It explains and finds the data; it does not replace configuration decisions or post documents without human approval.

Frequently asked questions

What is MIGO movement type 161?

161 is the return delivery against a return purchase order item. It issues the goods from stock to the vendor and records the return in PO history, so the credit memo can later be matched to it.

When should I use 122 instead?

Use 122 when you are returning goods straight against a prior material document, for example rejecting goods right after receipt. It does not need a separate return PO.

How do I post the vendor credit memo?

In MIRO, choose the Credit Memo transaction, reference the return PO or original document, and post. The credit memo clears the liability and relieves GR/IR for the returned quantity.

Can I return to a vendor without a purchase order?

Yes, with a return delivery without reference, but it is not recommended. Without a PO or material document, there is no price or history reference, so valuation relies on the current material price.

Related

How-to

SAP GR/IR clearing account balance: reconcile with MB5S and clear with MR11

The GR/IR clearing account holds the value of goods received but not yet invoiced, and invoices not yet matched with receipts. It should trend to zero per PO item. Reconcile it with MB5S, find the PO items that are stuck, and clear true differences with MR11 or automatic clearing in F.13, after correcting the cause.

How-to

SAP open purchase orders report: ME2N, ME2M, ME2L and the underlying tables

Use ME2N for a flexible open PO list, ME2M by material and ME2L by vendor, with the selection parameter Still to be delivered. The open quantity is the scheduled quantity in EKET minus goods received in EKBE, excluding deleted and delivery-completed items. For custom reports, read EKKO, EKPO, EKET and EKBE.

Error fix

SAP QM: Inspection Lot Not Created at Goods Receipt

An inspection lot is created only when QM is active for the plant, the material has an active inspection type for the goods movement, and the material carries a QM control key. Check the Quality Management view in MM02, confirm inspection type 01 (purchase order) or 04 (production order) is active, then check QM activation in the plant and the goods movement used.

Error fix

SAP M7 021: Deficit of SL Stock Quantity

M7 021 fires during a goods issue, delivery, or confirmation when SAP checks the unrestricted-use (SL) stock for the exact plant, storage location and batch combination and finds less than what you are trying to post out. Fix the entry (batch, storage location, quantity) first; only enable negative stock or downgrade the message to a warning if the business genuinely needs to post ahead of a receipt.

Error fix

SAP IDoc Status 51: Application Document Not Posted

Status 51 tells you the IDoc reached the application layer and failed to post, but the status text itself is not the error - the real cause sits in the status record's long text or the linked application log. Fix the underlying data or configuration, then reprocess the IDoc through BD87 rather than editing the status.

Error fix

SAP Short Dump TIME_OUT: Maximum Runtime Exceeded

A TIME_OUT runtime error means a dialog (or RFC) work process ran longer than the maximum allowed runtime, controlled by profile parameter rdisp/max_wprun_time (600 seconds by default). The fix is almost always to move the long-running work to background processing or tune the underlying program, not to raise the timeout.

AI for ERP

AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual Drafting

AI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.

Stuck on SAP ECC / S/4HANA?

Talk to engineers who work inside SAP ECC / S/4HANA every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations