SAPFree referencePDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

SAP Movement Types Reference (MM Inventory Management)

A movement type is a three digit key that tells SAP what a goods movement means: which stock it changes, which accounts it posts to, and which fields the screen asks for. This table lists the movement types SAP MM consultants and warehouse teams reach for most often.

Download:
Movement typeDescriptionReversal typeAreaTypical use
101
GR goods receipt
102
Receipt
Goods receipt against a purchase order or production order into unrestricted stock
102
GR for PO reversal
101
Receipt
Cancel a goods receipt posted with 101
103
GR into GR blocked stock
104
Receipt
Receive into GR blocked stock before the quality or quantity check
104
GR into GR blocked stock reversal
103
Receipt
Reverse a 103 posting
105
GR from GR blocked stock
106
Receipt
Release GR blocked stock to unrestricted use
106
GR from GR blocked stock reversal
105
Receipt
Reverse a 105 posting
122
Return delivery to vendor
123
Return
Return received goods to the vendor, referencing the material document
123
Return delivery reversal
122
Return
Reverse a 122 return
161
Return delivery for purchase order
162
Return
Return delivery for a PO item flagged as a return item
201
GI for cost center
202
Issue
Consume stock to a cost center
202
GI for cost center reversal
201
Issue
Reverse a 201 posting
221
GI for project
222
Issue
Issue stock to a WBS element
222
GI for project reversal
221
Issue
Reverse a 221 posting
231
GI for sales order
232
Issue
Consume stock against a sales order
232
GI for sales order reversal
231
Issue
Reverse a 231 posting
241
GI for asset
242
Issue
Issue stock to an asset under construction or asset master
242
GI for asset reversal
241
Issue
Reverse a 241 posting
261
GI for order
262
Issue
Backflush or manual component issue to a production or process order
262
GI for order reversal
261
Issue
Return a component from an order or reverse a 261
301
Transfer plant to plant, one step
302
Transfer
Move stock from one plant to another in a single posting
302
Transfer plant to plant reversal
301
Transfer
Reverse a 301 posting
303
Plant to plant removal from storage
304
Transfer
Step one of a two step plant to plant transfer (stock in transit)
305
Plant to plant placement in storage
306
Transfer
Step two of a two step plant to plant transfer
309
Transfer material to material
309
Transfer
Change the material number of stock, for example a relabel or conversion
311
Transfer storage location to storage location, one step
312
Transfer
Move stock between storage locations within a plant
312
Storage location transfer reversal
311
Transfer
Reverse a 311 posting
313
Storage location transfer, removal from storage
314
Transfer
Step one of a two step storage location transfer
315
Storage location transfer, placement in storage
316
Transfer
Step two of a two step storage location transfer
321
Transfer posting quality inspection to unrestricted
322
Stock status
Release inspected stock to unrestricted use
322
Transfer posting unrestricted to quality inspection
321
Stock status
Send unrestricted stock to quality inspection
343
Transfer posting blocked to unrestricted
344
Stock status
Unblock blocked stock
344
Transfer posting unrestricted to blocked
343
Stock status
Block unrestricted stock
349
Transfer posting blocked to quality inspection
350
Stock status
Move blocked stock to inspection
350
Transfer posting quality inspection to blocked
349
Stock status
Block stock after a failed inspection
501
Receipt without purchase order
502
Receipt
Unplanned receipt into stock with no PO, used for corrections and samples
502
Receipt without purchase order reversal
501
Receipt
Reverse a 501 posting
531
Receipt of by-product from order
532
Receipt
Goods receipt of a by-product from production
541
Transfer to subcontractor stock
542
Subcontracting
Provide components to a subcontractor without a PO component issue
542
Transfer to subcontractor stock reversal
541
Subcontracting
Reverse a 541 posting
543
Consumption from subcontractor stock
544
Subcontracting
Consumption of provided components, usually posted automatically with the GR of the finished item
551
GI for scrapping
552
Issue
Scrap unrestricted stock
552
GI for scrapping reversal
551
Issue
Reverse a 551 posting
555
GI for scrapping from blocked stock
556
Issue
Scrap blocked stock
561
Initial entry of stock balances
562
Receipt
Load opening stock during go live or migration
562
Initial entry of stock balances reversal
561
Receipt
Reverse a 561 posting
601
GD goods issue delivery
602
Delivery
Goods issue for an outbound delivery to a customer
602
GD goods issue delivery reversal
601
Delivery
Reverse a 601 goods issue
641
GI stock transfer to plant, in transit
642
Stock transfer order
Goods issue against a stock transport order, stock goes into transit
101 STO
GR for stock transport order
102
Stock transfer order
Receipt at the receiving plant, posted as 101 against the STO
701
Inventory difference, gain
702
Physical inventory
Posting of a positive physical inventory difference
702
Inventory difference, loss
701
Physical inventory
Posting of a negative physical inventory difference
711
Inventory difference in warehouse, gain
712
Physical inventory
Posting of a gain for stock in the warehouse management inventory process
712
Inventory difference in warehouse, loss
711
Physical inventory
Posting of a loss for stock in the warehouse management inventory process

Movement types are configured in table T156 (OMJJ). Customers copy and change standard types into the Z or 9xx range, so always confirm against your own system. Reversal types listed are the standard SAP pairing.

Check your movement type setup against standard

Send us your T156 export and we will list custom movement types with missing account determination. Optional, the table is free without it.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this reference

Type a movement type number, a word such as scrap or cost center, or an area such as Transfer into the search box to filter the table. Use the Reversal type column to find the correct cancellation posting, because a reversal in SAP is its own movement type and posts with its own account determination. Export the filtered rows to Excel when you need to paste them into a blueprint, a test script or a training sheet.

How movement types drive posting

Each movement type controls three things. First, quantity update: whether stock rises or falls, and in which stock category such as unrestricted, quality inspection or blocked. Second, value update: whether the posting changes inventory value. Third, the posting keys used with transaction key GBB, BSX or WRX in account determination (OBYC), which together with valuation class decide the G/L accounts. Because of this, one wrong movement type does not only move quantity, it can post value to the wrong cost account.

  • Movement type plus movement indicator decides the allowed reference document
  • Reversal movement types carry the same account determination in the opposite direction
  • Consumption movement types need an account assignment such as cost center, order or WBS

Worked example: a production issue and its correction

A production operator pulls 40 units of a component to process order 1000231. The posting is 261, goods issue for order. If the operator picked the wrong order, the supervisor posts 262 with reference to the original material document, and then repeats the 261 against the right order. Do not use 201 to fix this, because 201 expects a cost center and would book the consumption as an expense instead of work in process. The same logic applies to goods receipts: 101 is cancelled by 102, not by a return delivery 122.

Common mistakes

The most frequent error is using a transfer posting where a goods issue is meant, for example moving scrap with 311 instead of 551, which leaves stock on the books. Another is cancelling a goods receipt that already has an invoice, which fails or leaves a GR/IR imbalance. Third, copying a standard movement type without copying its account modification rows in OMWN and OBYC, which causes posting errors that look like missing G/L accounts. Always test a new or changed movement type with a value impact check in MB51 and the accounting document.

Frequently Asked Questions

What is the difference between movement type 101 and 103 in SAP?

101 receives goods into unrestricted stock and normally updates inventory value and GR/IR. 103 receives into GR blocked stock, which is valued but not available, so a quality or quantity check can happen first. Stock is then released with 105 to move it to its final stock category.

How do I reverse a movement type in SAP?

In MIGO choose the cancellation action and reference the original material document, or use the paired reversal movement type from this table. The system posts the opposite quantity and value. A document that was already invoiced or consumed may need a return delivery or a different correction.

Where are movement types configured?

Movement types sit in table T156 and are maintained with transaction OMJJ in the customizing path for Inventory Management and Physical Inventory. Account determination for them is in OBYC, and field selection in OMJJ screens. Never edit the standard types, copy them to a customer name first.

Which movement type is used for backflush in production?

Backflush of components at confirmation posts 261, goods issue for order, and the receipt of the finished product is 101 against the production order. Cancelling a confirmation posts the matching 262 and 102. Make sure the backflush indicator is set in the material master or work center.

If your team spends time explaining or looking up movement types, we can put a read-only assistant on top of your own T156 configuration and material documents so planners ask in plain language and see the query behind the answer.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring