How-toSAP S/4HANA and ECCQuality Management (QM) / Quality Planning Master Data

How to Create an Inspection Method in SAP QM (QS31)

Question
how to create inspection method in sap qm

Also searched as

  • sap qs31 inspection method
  • assign inspection method master inspection characteristic
  • sap qm inspection method task list

Short answer

An inspection method describes how a characteristic is to be inspected, for example with a micrometer or a visual check, and holds the instructions. Create it with QS31 for a plant, set the status and version, write the text, and assign it to a master inspection characteristic (QS21) or directly in an inspection plan characteristic.

Applies to: SAP ECC 6.0 and SAP S/4HANA on-premise with QM

Create and assign an inspection method

  1. 1Run QS31 (Create Inspection Method). Enter the plant and a method name, and press Enter.
  2. 2Fill in the short text and, if needed, a search field to help users find it.
  3. 3Set the status (for example created, released) and the version. Only released versions can be used in inspection plans.
  4. 4Add the long text with the inspection instructions: tools, conditions, sampling and sequence.
  5. 5Save. Use QS32 to change and QS33 to display.
  6. 6Assign it in the master inspection characteristic (QS21) in the Inspection method field, so every plan using the MIC inherits it.
  7. 7Or assign it directly to a characteristic in the inspection plan (QP01) when a one-off is needed.

Inspection method versus characteristic

The master inspection characteristic defines what is inspected (diameter, color, hardness), including the tolerances and result type. The inspection method defines how. Separating the two lets you reuse a single measurement procedure across many characteristics, and change it in one place.

For quantitative characteristics such as dimensions, the method often names the gauge or measuring equipment. For qualitative ones, it describes the visual criteria or the sample board used.

Methods are plant-specific, though you can copy them between plants. This matters in multi-plant companies using different gauges.

Versions, status and change control

Methods have versions and statuses. A new version lets you change the instruction without changing past inspections. Old lots keep the version that was valid when they were created.

A released status is required for use. If the plan will not accept the method, check the status and the validity date. Methods can also be linked to change numbers if you use engineering change management.

Because the method text is shown to inspectors on the shop floor, review it as a controlled document. In regulated industries, the version history is part of your evidence.

QS31   Create inspection method
QS32   Change inspection method
QS33   Display inspection method
QS21   Maintain master inspection characteristic
QP01   Create inspection plan

Using methods in inspection plans

In an inspection plan, each operation has inspection characteristics. When a characteristic is copied from a MIC, the method comes with it. You can override it at plan level when the need is local.

At results recording (QE51N), the inspector sees the method text with the characteristic. If the text is missing, check the method assignment on the MIC and in the plan, and the version validity.

Keep method names consistent. A naming scheme by technique and plant makes searches and reporting simpler, and prevents duplicates such as 'MICROMETER' and 'MICROMETRE'.

Try it here, free

SAP QM Inspection Plan Planning Worksheet

Open full tool

A planning table for inspection operations, characteristics, limits, sample and effort, ready to review before QP01 entry.

Common pitfalls

  • !Leaving the method in 'created' status so it cannot be used in a plan.
  • !Writing the instructions into the MIC short text instead of a controlled method.
  • !Creating duplicate methods with slightly different names.
  • !Changing a method text without a new version, losing history.
  • !Assigning a method from the wrong plant.

How an ERP-grounded AI assistant handles this

Inspection methods drift: duplicates, outdated gauges, plans that point at old versions. A grounded assistant can list where each method is used, which plans still reference a superseded version, and which characteristics have none. Netray runs this read-only analysis against your SAP data on your own servers, which suits quality records that must stay inside the plant network.

Frequently asked questions

What is the tcode to create an inspection method in SAP QM?

QS31 creates it, QS32 changes it and QS33 displays it. The method is then assigned in QS21 for master inspection characteristics or in the inspection plan.

Is an inspection method mandatory for a characteristic?

No. It is optional in the master data, but without one the inspector has no linked instruction on how to measure the characteristic, so most quality systems require it.

How do I change an inspection method without affecting old lots?

Create a new version and release it. Existing inspection lots keep the version they were created with, so history stays accurate.

Why can I not select my method in the inspection plan?

Check the plant, status and validity. Only released methods valid on the plan's key date appear. Also check whether the method belongs to the same plant as the plan.

Related

How-to

How to Create a Selected Set in SAP QM (QS51)

A selected set is a subset of codes taken from one or more catalog code groups, so users only see the relevant choices. Create it with QS51 for a catalog type and plant, add the codes, save, and then assign it to a master inspection characteristic (QS21), the usage decision, or defect recording.

How-to

SAP QM Sample-Drawing Procedure: Setup and Use (QPV1)

A sample-drawing procedure defines how physical samples are taken for an inspection: how many, in which containers, and what they are used for. Create it with QPV1, then reference it from the inspection plan (or material and inspection setup), so that when a lot is created the system generates the physical sample records, which you can also create manually with QPR1.

Error fix

SAP QM: Inspection Lot Not Created at Goods Receipt

An inspection lot is created only when QM is active for the plant, the material has an active inspection type for the goods movement, and the material carries a QM control key. Check the Quality Management view in MM02, confirm inspection type 01 (purchase order) or 04 (production order) is active, then check QM activation in the plant and the goods movement used.

Error fix

SAP M7 021: Deficit of SL Stock Quantity

M7 021 fires during a goods issue, delivery, or confirmation when SAP checks the unrestricted-use (SL) stock for the exact plant, storage location and batch combination and finds less than what you are trying to post out. Fix the entry (batch, storage location, quantity) first; only enable negative stock or downgrade the message to a warning if the business genuinely needs to post ahead of a receipt.

Error fix

SAP IDoc Status 51: Application Document Not Posted

Status 51 tells you the IDoc reached the application layer and failed to post, but the status text itself is not the error - the real cause sits in the status record's long text or the linked application log. Fix the underlying data or configuration, then reprocess the IDoc through BD87 rather than editing the status.

Error fix

SAP Short Dump TIME_OUT: Maximum Runtime Exceeded

A TIME_OUT runtime error means a dialog (or RFC) work process ran longer than the maximum allowed runtime, controlled by profile parameter rdisp/max_wprun_time (600 seconds by default). The fix is almost always to move the long-running work to background processing or tune the underlying program, not to raise the timeout.

AI for ERP

AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual Drafting

AI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.

Stuck on SAP S/4HANA and ECC?

Talk to engineers who work inside SAP S/4HANA and ECC every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring