How-toSAP S/4HANA and ECCQuality Management (QM) / User Status Profiles

How to Create a Status Profile in SAP QM (BS02)

Question
how to create status profile in sap qm

Also searched as

  • sap bs02 status profile
  • user status profile inspection lot sap
  • status profile quality notification sap

Short answer

A user status profile adds your own statuses to QM objects such as quality notifications, tasks and inspection lots. Create it in BS02, choose the object types, define statuses with numbers and an initial status, set which business transactions each status allows or forbids, and then assign the profile in the QM IMG for the object type.

Applies to: SAP ECC 6.0 and SAP S/4HANA on-premise with QM

Create and assign a status profile

  1. 1Run BS02 (Maintain Status Profile). Choose Create and enter a profile name, a short text and the maintenance language.
  2. 2Select the object types the profile applies to, such as Quality notification header, Notification task or Inspection lot.
  3. 3Define the statuses: a status key, description, and a status number if you want a sequence. Mark the initial status.
  4. 4For each status, set the lowest and highest status number allowed next if you want to control the order of status changes.
  5. 5In Business Transaction Control, set which transactions each status allows, warns on or forbids, such as 'Complete' or 'Usage decision'.
  6. 6Save to a customizing request.
  7. 7Assign the profile in SPRO: for notifications, in the notification type; for tasks, in the notification type's task status profile; for inspection lots, in the Quality Inspection customizing under inspection lot creation.

System status versus user status

SAP sets system statuses automatically, such as created, released or UD made. User statuses are your own, such as 'Awaiting supplier response' or 'Approved by engineering'. They sit alongside the system status, and both are visible in the object.

The advantage of user statuses is that they can control the business flow. A status can forbid the usage decision until a particular approval status is set, for instance.

Use them sparingly. Every status adds training and test effort, and a long profile is rarely followed.

Status numbers and transaction control

Status numbers set a sequence. With a number set, a user can move from status 10 to 20 but not skip to 40 if the lowest and highest rules say so. If you do not need a sequence, leave numbers empty and let users set any status.

Business transaction control is where the status gets teeth. For each status, a business transaction such as 'Notification completion' is set to Allowed, Warning or Forbidden. This is how you implement 'the notification cannot be completed until the corrective action is verified'.

Authorization codes can restrict who may set a status. You define the authorization code in the profile and then grant it in a role. This is a good fit for approvals.

BS02    Maintain status profile
BS03    Display status profile
QM01    Create quality notification
SPRO > Quality Management > Quality Notifications > Notification Creation > Notification Types

Assignment and testing

For notifications, the status profile is assigned on the notification type and a separate one can be set for tasks. Existing notifications created before the assignment do not get the new statuses automatically, so create a test notification.

For inspection lots, the user status profile is assigned through the inspection lot customizing. The exact node depends on your release, so search the IMG for 'status profile' under Quality Inspection if you cannot find it.

Always test the full path: create the object, change status in the allowed order, then try a forbidden transaction and confirm the error message. Document the profile so support knows what each status means.

Try it here, free

SAP QM Certificate of Analysis Profile Template

Open full tool

A requirements document for the certificate of analysis your customers expect from SAP QM, with the layout and sample certificate content in one place.

Common pitfalls

  • !Creating a profile but never assigning it in the notification type or inspection customizing.
  • !Defining many statuses with no business transaction control, so the statuses are only labels.
  • !Forgetting that existing objects do not pick up a newly assigned profile.
  • !Changing statuses in production without a transport, so development and production differ.
  • !Leaving the initial status unset, so new objects have no user status.

How an ERP-grounded AI assistant handles this

Status profiles often grow until nobody remembers why a transaction is forbidden. A grounded assistant can read the profile, list the statuses and the transactions each blocks, and explain to a quality engineer why a notification cannot be closed. Netray can run the assistant on your own servers so the explanation draws on live configuration without exposing it to an outside service.

Frequently asked questions

What is the tcode for a status profile in SAP?

BS02 creates and changes user status profiles, and BS03 displays them. The profile is then assigned in customizing for each object type.

Can a user status block a usage decision?

Yes, if the status profile applies to the inspection lot and the business transaction for the usage decision is set to Forbidden in the status. The user must reach an allowed status first.

What is the difference between a status profile and a status?

The profile is the container with the list of user statuses for an object type. Each status in it is one value an object can have, with its own rules about what is allowed.

Do I need a transport for a status profile?

Yes. BS02 saves to a customizing request and you transport it like any other configuration. Remember to transport the assignment in the QM IMG as well.

Related

How-to

How to Reverse or Cancel a Usage Decision (UD) in SAP QM

Use QA12 (Change Usage Decision) to change a usage decision you already made in QA11. It works when the lot has not been closed by follow-on processes. If stock has already been posted or follow-up actions ran, you may have to correct the stock with a movement type instead. The authorization to change UDs is separate from the one to make them.

How-to

SAP QA11 Usage Decision: Make It and Post Stock Correctly

The usage decision (UD) in QA11 closes an inspection lot, assigns a quality score and a UD code such as accepted or rejected, and posts the lot quantity from quality inspection stock to unrestricted use, blocked stock, scrap or return to vendor. The UD is blocked until required inspection characteristics are closed and results are recorded.

How-to

How to Create a Selected Set in SAP QM (QS51)

A selected set is a subset of codes taken from one or more catalog code groups, so users only see the relevant choices. Create it with QS51 for a catalog type and plant, add the codes, save, and then assign it to a master inspection characteristic (QS21), the usage decision, or defect recording.

Error fix

SAP M7 021: Deficit of SL Stock Quantity

M7 021 fires during a goods issue, delivery, or confirmation when SAP checks the unrestricted-use (SL) stock for the exact plant, storage location and batch combination and finds less than what you are trying to post out. Fix the entry (batch, storage location, quantity) first; only enable negative stock or downgrade the message to a warning if the business genuinely needs to post ahead of a receipt.

Error fix

SAP IDoc Status 51: Application Document Not Posted

Status 51 tells you the IDoc reached the application layer and failed to post, but the status text itself is not the error - the real cause sits in the status record's long text or the linked application log. Fix the underlying data or configuration, then reprocess the IDoc through BD87 rather than editing the status.

Error fix

SAP Short Dump TIME_OUT: Maximum Runtime Exceeded

A TIME_OUT runtime error means a dialog (or RFC) work process ran longer than the maximum allowed runtime, controlled by profile parameter rdisp/max_wprun_time (600 seconds by default). The fix is almost always to move the long-running work to background processing or tune the underlying program, not to raise the timeout.

AI for ERP

AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual Drafting

AI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.

Stuck on SAP S/4HANA and ECC?

Talk to engineers who work inside SAP S/4HANA and ECC every week, and who build private AI that answers these questions from your own ERP data.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Integrations