SyteLine csi_kit_live_kit and what a CSI warning means
infor syteline csi_kit_live_kit
Also searched as
- what is a csi warning
- syteline kit warning
- csi_kit_live_kit table or procedure
Short answer
CSI is Infor CloudSuite Industrial, the current name of SyteLine, so a CSI warning is a non-blocking message from the application that tells you something is questionable but lets you continue. We cannot confirm a documented public meaning for an object named csi_kit_live_kit, so the dependable method is to locate it in your own database, read its definition and check how kits are configured.
Applies to: Infor SyteLine / CloudSuite Industrial on SQL Server. Object names are specific to your version and any custom or bundled extensions.
Investigate a kit-related warning or object
- 1Read the exact warning text in the message bar or the error log, and note the form you were on.
- 2Search SQL Server for the object: SELECT name, type_desc FROM sys.objects WHERE name LIKE '%kit%live%'.
- 3If it is a procedure or view, read it with sp_helptext 'objectname', or script it in SQL Server Management Studio.
- 4Check where it is called from: search the Mongoose configuration (forms, IDO methods, event handlers) and your custom code for the name.
- 5Check the kit item setup: the item is flagged as a kit, its components exist and are active, and the quantities and UMs are valid.
- 6Test the same action with a simple kit item to see if the warning depends on the data.
- 7Check recent customisations, upgrades and custom stored procedures that may have introduced or changed the object.
- 8If it remains unexplained, open a case with Infor support and attach the message text, the object definition and the steps to reproduce.
What a CSI warning is
SyteLine messages come in grades. Errors stop the action, while warnings and informational messages let the user continue. A warning on a kit usually concerns data that is allowed but suspicious, such as a component with no stock or a quantity of zero.
The message text, not the object name, is the best search term for Infor documentation and community posts.
How kits work in general
A kit in SyteLine is an item that is sold or issued as a parent made of component items. Depending on setup, the components can be reserved, picked and shipped with the parent, and the parent's availability depends on the components.
A live kit view or procedure of the kind your question names would typically report or compute that component availability in real time. Treat that as an inference to verify in your own database, not as documented behaviour.
Why the object may not be documented
SyteLine ships many internal procedures, views and functions that Infor does not document. Others come from add-ons, partner extensions or your own customisations, and names prefixed with a company or product code are common.
Never modify an Infor-delivered object directly. Changes belong in your own extension layer so an upgrade does not overwrite them.
SELECT name, type_desc, create_date, modify_date FROM sys.objects WHERE name LIKE '%kit%' ORDER BY modify_date DESC; EXEC sp_helptext 'dbo.YourObjectName';
Troubleshooting data, not code
Most kit warnings clear when the data is fixed: add the missing component, fix the quantity or unit of measure, activate the item, or correct the warehouse. Check the data before changing any code.
If the warning appears only for a specific item or customer order, compare it with a working kit. The difference is usually in the setup.
Try it here, free
Slack Block Kit Approval Message Generator
Creates a chat.postMessage body with Block Kit sections, fields and Approve and Reject action buttons for ERP approval workflows.
Common pitfalls
- !Editing a delivered stored procedure or view and losing the change in the next upgrade.
- !Treating a warning as an error and reworking data that is acceptable.
- !Assuming an object name proves what it does; read its definition.
- !Ignoring the exact message text when searching for help.
- !Testing kit changes in production rather than a test database.
How an ERP-grounded AI assistant handles this
SyteRay can search a SyteLine database for an unfamiliar object, read its definition and the forms and IDOs that reference it, and explain what it does in plain language, all against your own schema and on-prem if needed. That is faster than guessing from the name, and it states clearly what it could and could not verify.
Frequently asked questions
What is a CSI warning?
CSI stands for CloudSuite Industrial, the current name of SyteLine. A CSI warning is a non-blocking message from the application: it flags something questionable but lets you continue.
What is csi_kit_live_kit?
We cannot confirm a documented public definition. Find it in sys.objects in your own database, read its definition with sp_helptext and check what calls it. The name suggests kit availability logic, but verify that.
How do I find where a SQL object is used?
Search procedure and view definitions with sys.sql_modules for the name, and search the Mongoose forms, IDOs and event handlers. Include custom code and scheduled jobs.
Should I edit the object to remove the warning?
No. Fix the data causing it or add your own extension. Direct edits to delivered objects are lost at upgrade and may break support.
Related
SyteLine error -30006: how to find the real cause
The number in a SyteLine error such as -30006 is a wrapper code. The useful information is the text after it and the underlying exception from the app server or SQL Server. There is no dependable public catalog of these numbers, so the reliable fix is a repeatable method for reading the message, reproducing it and checking the server side.
How-toHow to Maintain the BOM and Routing in SyteLine
In SyteLine the manufacturing structure for an item is a standard (type S) job: its material lines are the BOM and its operation lines are the routing. You maintain it from the item's BOM and routing forms, set effectivity dates, then let new job orders pull a copy. Existing jobs do not update automatically, which is where most confusion comes from.
AdvancedHow to Build SQL Views for Custom SyteLine Reporting
Reports should read from purpose-built SQL views, not directly from SyteLine's core transactional tables, so an Infor patch cannot silently break them and heavy report queries do not lock rows the ERP itself needs. Put custom views in their own schema or under a clear naming convention, build them on stable base tables, and grant reporting tools read access to the views only.
Error fixFixing SyteLine's 'Object reference not set to an instance of an object' error
This is a generic .NET NullReferenceException surfacing through the SyteLine IDO Runtime, not a SyteLine-specific error code. It almost always means a form, script or IDO method referenced a field, row or object that came back null, usually after a customization, a missing related record, or a view/IDO method call before the form finished loading. Turn on detailed client logging and check the most recent customization or form event first.
Error fixDiagnosing and fixing SyteLine session timeout errors
SyteLine session timeouts come from one of three independent layers: the IDO Data Service session timeout on the app server, the IIS/application pool idle timeout for the web (Mongoose Web) client, or a load balancer/proxy idle timeout in front of a CloudSuite hosted environment. Fixing the wrong layer is the most common mistake - you need to identify which layer is actually expiring the session before changing anything.
Error fixResolving SyteLine multi-site replication conflict errors
A replication conflict in SyteLine's multi-site architecture means the same record (commonly an item, customer, or BOM) was changed independently at two sites between replication cycles, and the replication engine could not automatically merge the two versions. Check the replication conflict log first to see which record and which fields collided, then decide which site's version should win before resuming the queue.
AI for ERPAI for Infor SyteLine and CloudSuite Industrial
Add grounded AI to Infor SyteLine or CloudSuite Industrial: natural-language answers, agents over IDOs and ION, on-prem or CloudSuite deployment.
Stuck on Infor SyteLine (CloudSuite Industrial)?
Talk to engineers who work inside Infor SyteLine (CloudSuite Industrial) every week, and who build private AI that answers these questions from your own ERP data.
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Slack Block Kit Approval Message GeneratorCreates a chat.postMessage body with Block Kit sections, fields and Approve and Reject action buttons for ERP approval workflows.
- Written Warning Notice Template for PlantsA balanced fill-in written warning form for supervisors: facts, policy reference, expected improvement, review date and signatures.
- Infor Factory Track Installation and Go-Live Checklist (CSI)A 37-item checklist for installing or enabling Infor Factory Track with CloudSuite Industrial, from version compatibility to labels, devices, pilot and hypercare.
ERP fixes and how-tos
- SyteLine or CloudSuite Industrial: how to decide in 2026How CIOs on Infor SyteLine should decide between staying on-prem, moving to CloudSuite Industrial, or holding at the current version in 2026. Practical decision framework.
- How to Search for Items, Purchase Orders and Records in SyteLineFind items, purchase orders and any record in Infor SyteLine / CSI using Filter in Place, form search, lookups and query-by-example, with wildcard tips.
- SyteLine error -30006: how to find the real causeHow to find the real cause behind SyteLine error -30006 and other numbered messages: details dialog, message logs, server logs and SQL, in a repeatable order.
Runs with your ERP
- Infor Service Mobile with Infor SyteLine Field ServiceInfor Service Mobile is a field technician app listed as a CloudSuite Industrial add-on. What it connects to in SyteLine service, setup steps, pitfalls, FAQ.
- SyteLine APS: configuring finite-capacity planning and schedulingHow Infor SyteLine (CSI) APS schedules finite capacity across work centers, materials and orders: configuration steps, pitfalls and a private AI layer on-prem.
- CADTALK ERP Integration with Infor SyteLine (CSI)How CADTALK turns engineering BOMs from CAD, PDM or PLM into manufacturing BOMs, items and routings in Infor SyteLine. Setup, pitfalls, alternatives, FAQ.
Guides
- CloudSuite Industrial Cloud Security ArchitectureUnderstand CloudSuite Industrial cloud security architecture including identity management, encryption, network security, and compliance for CSI deployments.
- CSI 11 to CloudSuite Industrial Cloud Migration GuideMigrate from on-premise CSI 11 to Infor CloudSuite Industrial multi-tenant cloud, covering data migration, ION Connect, and cloud-specific configurations.
- CloudSuite Industrial 10 to 11 Migration GuideStep-by-step migration guide for upgrading Infor CloudSuite Industrial (CSI) from version 10 to 11, including ION integration, form updates, and testing.
AI on your ERP
- On-Prem AI for CloudSuite Industrial, Without the Multi-Tenant Cloud MoveAdd generative AI to CloudSuite Industrial without moving to Infor's multi-tenant cloud. On-prem private LLM options for CSI, with governance and audit built in.
- AI for Infor SyteLine and CloudSuite IndustrialAdd grounded AI to Infor SyteLine or CloudSuite Industrial: natural-language answers, agents over IDOs and ION, on-prem or CloudSuite deployment.
Integrations
- How to use ChatGPT with Infor SyteLineHow to use ChatGPT with Infor SyteLine: custom GPT actions over an API, data export versus live access, enterprise controls, and when a private model fits better.
- How to add WhatsApp to Infor SyteLineHow to connect WhatsApp to Infor SyteLine: IDO REST reads, event-driven alerts, template messages, and two-way replies that land back in CloudSuite Industrial.