How-toInfor SyteLine (CloudSuite Industrial)Planning / MRP

How to Run MRP in SyteLine

Question
How do I run MRP in SyteLine?

Also searched as

  • SyteLine MRP net change vs regenerative
  • SyteLine MRP action messages explained
  • how to read SyteLine MRP detail
  • SyteLine MRP not generating planned orders

Short answer

MRP in SyteLine runs from Planning > MRP Processing as either a full Regenerative run or a Net Change run against demand from customer orders, forecasts, and safety stock; results appear as planned orders and Action Messages in the Planner Workbench.

Applies to: SyteLine 8.x/9.x, CloudSuite Industrial (CSI) 10.x-11.x, Mongoose and classic UI

Run MRP in SyteLine

  1. 1Confirm demand inputs are current: customer order lines released, forecast loaded, and safety stock/reorder parameters set on item records.
  2. 2Open Planning > MRP Processing and choose scope: single site or all sites.
  3. 3Choose Regenerative (full recalculation) or Net Change (only items with changed demand/supply since the last run).
  4. 4Set the planning horizon and any item or site filters if you are not running the full plan.
  5. 5Run MRP and monitor the log for errors, such as items with no valid vendor or routing that block a planned order suggestion.
  6. 6Review Action Messages (Reschedule In, Reschedule Out, Cancel, New Order) in the Planner Workbench or Action Message report.
  7. 7Review the planned orders generated for purchased and manufactured items.
  8. 8Firm and release the planned orders you accept: purchased items become requisitions or POs, manufactured items become job orders.
  9. 9Re-run Net Change MRP after significant transactions, such as a large order entry, receipt, or job completion, rather than waiting for the next scheduled regenerative run.

Regenerative vs Net Change

A Regenerative run recalculates the entire plan from scratch across every planned item, which is heavier on the database and is typically scheduled overnight or over a weekend on larger sites. A Net Change run only reprocesses items whose supply or demand actually changed since the last run, which is light enough that planners can trigger it intraday whenever they need an up-to-date plan.

Most sites run Net Change several times a day and schedule a full Regenerative run weekly or nightly to catch any drift that incremental Net Change runs can accumulate over time.

What drives a planned order

MRP nets independent demand (forecast and safety stock) plus dependent demand (the BOM explosion coming down from parent planned or released orders) against on-hand quantity and on-order supply, then applies each item's lead time and lot-sizing rule to decide when and how much to suggest. The result is a planned order with a suggested start date, due date, and quantity for every item where the net requirement is greater than zero.

Reading the Action Messages

New Order tells the planner MRP wants a new purchase order or job order created. Reschedule In means an existing order should be pulled in earlier because demand moved up. Reschedule Out means an existing order can be pushed later because demand moved out, which frees up cash and floor space if acted on. Cancel means the underlying demand for an existing order disappeared entirely and the order should be reviewed for cancellation.

Each message type expects a specific planner response, and letting messages sit unactioned for multiple runs is what causes MRP output to feel noisy rather than actionable.

Why MRP doesn't suggest an order

If an item that should be generating a planned order is not, the usual causes are the item being incorrectly flagged as non-planned or phantom, a missing primary vendor or routing that leaves the system unable to build a valid suggestion, or the item's planning method being set to something other than MRP, such as a simple min/max reorder point that MRP does not process the same way.

Try it here, free

MRP Net Change vs Regenerative Run Time Calculator

Open full tool

Estimate how long a full regenerative MRP run takes compared with a net change run, and how much time net change saves.

Common pitfalls

  • !Running a full Regenerative MRP during business hours on a large multi-site database can lock tables and slow order entry for other users.
  • !Net Change MRP run too infrequently lets action messages go stale, so planners end up acting on outdated suggestions.
  • !Lead time set at zero or unrealistically low on purchased items causes MRP to generate late or physically impossible ship dates.
  • !A phantom BOM item incorrectly flagged as a stocked item breaks the explosion logic and generates a false planned order.
  • !Ignoring Reschedule Out messages leaves excess WIP and inventory tied up that MRP already identified as no longer needed on the original schedule.
  • !Assuming a single-item test run behaves identically to a full regenerative run when shared components or capacity constraints are involved.

How an ERP-grounded AI assistant handles this

ERPray can summarize the day's MRP action messages in plain language - these purchased items need expediting, these job orders should push out - grounded directly in the SyteLine planning tables, cutting the time a planner spends scrolling the Planner Workbench line by line each morning.

Frequently asked questions

How often should MRP run?

Most sites run Net Change MRP daily or even multiple times a day, and schedule a full Regenerative run weekly or nightly during a low-activity window to catch any drift that has built up from the incremental Net Change runs.

Why does MRP keep suggesting the same reschedule message every day?

Usually the planner has not actually actioned the underlying order yet, such as moving the PO date or firming a job order, or the item's lead time and lot-size setup causes the same suggestion to regenerate identically on every run until something changes.

Can I run MRP for a single item?

Yes, most SyteLine versions support a single-item or filtered MRP run, which is useful for testing the effect of a data change without triggering a full regenerative pass across the whole plan.

What is the Planner Workbench used for versus the Action Message report?

The Planner Workbench is the interactive screen where a planner reviews and acts on messages and planned orders item by item. The Action Message report is a printable or exportable summary better suited for a review meeting or handing planning priorities off to buyers.

Related

How-to

SyteLine Customer Order to Invoice: Step by Step

A SyteLine customer order flows from Order Entry through pick, pack, and Customer Shipment, then to invoicing, either through the Auto Invoice batch utility or manual Invoice Entry, posting revenue and relieving inventory once the shipment is confirmed.

How-to

How to Close a Job Order in SyteLine

Close a job order from Production > Job Orders once every routing operation is reported complete and the finished quantity has been received, then run Close Jobs to post the remaining WIP balance to variance and lock the job from further transactions.

How-to

How to Run a Cycle Count in SyteLine

Cycle counting in SyteLine runs through Inventory > Cycle Count: generate a count list by ABC class or location, print or enter tags, key the counted quantities into Cycle Count Entry, then review the variance report before posting the count to update on-hand quantity.

How-to

How to Run a Cost Rollup in SyteLine

Run Item Cost Rollup from Product Definition > Costing > Cost Rollup, select the site and item range, run it in Simulate mode first to review variances, then run it live to post new standard costs to Item records and the Costed Bill of Material.

Error fix

Fixing SyteLine's 'Object reference not set to an instance of an object' error

This is a generic .NET NullReferenceException surfacing through the SyteLine IDO Runtime, not a SyteLine-specific error code. It almost always means a form, script or IDO method referenced a field, row or object that came back null, usually after a customization, a missing related record, or a view/IDO method call before the form finished loading. Turn on detailed client logging and check the most recent customization or form event first.

Error fix

Diagnosing and fixing SyteLine session timeout errors

SyteLine session timeouts come from one of three independent layers: the IDO Data Service session timeout on the app server, the IIS/application pool idle timeout for the web (Mongoose Web) client, or a load balancer/proxy idle timeout in front of a CloudSuite hosted environment. Fixing the wrong layer is the most common mistake - you need to identify which layer is actually expiring the session before changing anything.

AI for ERP

AI for Infor SyteLine and CloudSuite Industrial

Add grounded AI to Infor SyteLine or CloudSuite Industrial: natural-language answers, agents over IDOs and ION, on-prem or CloudSuite deployment.

AI for ERP

On-Prem AI for CloudSuite Industrial, Without the Multi-Tenant Cloud Move

Add generative AI to CloudSuite Industrial without moving to Infor's multi-tenant cloud. On-prem private LLM options for CSI, with governance and audit built in.

AI for ERP

An Air-Gapped Private LLM for SyteLine, Built for Defense Suppliers

Deploy a private LLM on an air-gapped network alongside Infor SyteLine for defense suppliers: no internet egress, ITAR and CMMC-aware architecture.

Stuck on Infor SyteLine (CloudSuite Industrial)?

Talk to engineers who work inside Infor SyteLine (CloudSuite Industrial) every week, and who build private AI that answers these questions from your own ERP data.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP