What Is Enterprise Planning?
Also known as: LN Enterprise Planning, EP, LN master planning
Definition
Enterprise Planning is Infor LN's supply planning engine. It runs master planning and order planning across plan items, sites and companies, generating planned orders and reschedule signals from demand, inventory, lead times and the supply strategies defined per plan item.
Enterprise Planning Explained
Enterprise Planning replaced the older separate master production scheduling and material requirements planning modules of Baan IV with one engine covering both levels. Master planning works at an aggregate level over periods, suitable for capacity and sales and operations planning conversations. Order planning works at the order level for individual items, generating the planned purchase, production and transfer orders that buyers and planners actually act on.
The unit of planning is the plan item. Not every item needs to be planned by the engine: items controlled by statistical inventory rules or ordered manually can be excluded, which keeps the planning run focused and fast. For plan items you define the supply strategy, lead times, order quantity rules, safety stock and time fences, and these settings do far more to determine planning behavior than any global parameter does.
Scope is where LN differentiates. Planning can span sites and companies, with planning clusters defining which locations pool their supply and demand and how requirements cascade between them. A demand in one plant can generate a transfer from another, which in turn generates production there and purchasing beneath it, all in one run. Combined with project pegging, the engine can also keep contract-funded material planned separately from commercial demand.
Operationally the two things that determine whether planners trust the output are data quality and stability. Lead times and order rules that do not reflect reality produce plans nobody follows, and a plan that changes materially every run trains planners to ignore it. Time fences, freezing, and disciplined maintenance of item planning parameters are the levers that turn a mathematically correct plan into one the business actually executes against.
Why It Matters
- Planning parameters per plan item drive results far more than global settings, so parameter maintenance is an ongoing job.
- Cross-site and cross-company planning removes the spreadsheets that usually sit between multi-plant operations.
- Plan stability determines planner trust; an unstable plan is ignored regardless of how correct it is.
- Planning behavior interacts with pegging, so contract manufacturers must design both together rather than separately.
In Practice
When planners complain that output is wrong, audit item planning parameters before questioning the engine. Lead times copied from a legacy system, order quantity rules nobody has revisited since go-live and safety stock set once and never reviewed explain the overwhelming majority of these complaints. A quarterly parameter review beats any amount of engine tuning.
Frequently Asked Questions
What is the difference between master planning and order planning in LN?
Master planning works at an aggregate level over time periods and is used for medium to long term capacity, supply and sales and operations planning decisions. Order planning works at the individual item and order level, producing the specific planned purchase, production and transfer orders that planners convert into real orders. Many implementations use both, at different horizons.
What is a plan item in Infor LN?
A plan item is an item that Enterprise Planning actively plans, with its own planning parameters: supply strategy, lead times, order quantity rules, safety stock and time fences. Items not designated as plan items are managed by other means, such as statistical inventory control or manual ordering. Keeping the plan item set deliberate keeps planning runs focused and fast.
Related Terms
Freeze and Unfreeze (LN Planning)
Freeze and unfreeze are Infor LN Enterprise Planning actions that lock planned orders or planned quantities so a planning run cannot change or delete them. Freezing protects near-term commitments inside the planning horizon; unfreezing returns the records to normal regeneration.
Multisite (Infor LN)
Multisite in Infor LN is the configuration pattern for running several plants, warehouses or legal entities in one environment using sites, enterprise units and multiple companies, with intercompany trade rules that price and post transfers between them automatically.
LN Bill of Material
An LN bill of material is the parent-child list defining which components and quantities go into a manufactured item in Infor LN. Each line carries a position number, net quantity, scrap factor, effective dates and, optionally, the routing operation that consumes it.
Go Deeper
Infor LN vs SyteLine Selector
Answer ten questions about your sites, manufacturing mode, and complexity to see whether Infor LN or SyteLine (CloudSuite Industrial) is the better fit.
Infor LN Implementation Cost: What to Budget
Infor LN implementation cost typically runs $500K to $5M+. See budget breakdowns by phase, license-to-services ratios, and the cost drivers for 2026 projects.
Infor LN to CloudSuite: Migration Playbook
Infor LN to CloudSuite migration playbook: Baan and LN version paths, extension conversion, ION integration rework, timelines, and defense compliance steps.
Working with Enterprise Planning in a live environment? Our engineers do this every day - and our AI agents automate most of it.
Try it here, free
Infor LN Company and Enterprise Unit Design Worksheet
Plan LN companies, enterprise units, sites and currencies row by row, with user and volume totals, and export to Excel.
New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.
Keep exploring
Free tools
- Infor LN Company and Enterprise Unit Design WorksheetPlan LN companies, enterprise units, sites and currencies row by row, with user and volume totals, and export to Excel.
- Infor LN Item Master Tables Reference (tcibd001, tdisa001, tdipu001)Find which LN 10.x table and session holds each item attribute: general, sales, purchase, item by business partner, ordering, warehousing and production.
- Infor LN EOQ Order Quantity CalculatorCalculate economic order quantity, orders per year and total annual cost, then use the result to set LN item ordering data.
ERP fixes and how-tos
- What Is a Planning Cluster in Infor LN?What a planning cluster is in Infor LN Enterprise Planning, how clusters group planning units, how to set one up and where service resource planning fits.
- Infor LN Enterprise Planning Not Generating Planned OrdersWhy Infor LN Enterprise Planning produces no planned orders for an item with demand, and a step by step check of planning data, horizons and order policies.
- Infor LN Master Planning: How It Works and a Setup and Run ChecklistHow master planning works in Infor LN: planned orders, pegging, planning horizons and a practical setup and run checklist for planners and consultants.
Guides
- Infor LN MRP Planning Setup and Parameter ConfigurationConfigure MRP planning in Infor LN with planning parameters, order policies, safety stock rules, and demand pegging for optimal material requirements.
- Infor LN Freeze/Unfreeze Planning: Frozen Zones and Time Fences ExplainedHow Infor LN freeze and unfreeze planning works: frozen zones, time fences, firm planned orders, and Enterprise Planning settings that stop MRP nervousness.
- AI Multi-Site Planning for Infor LNOptimize Infor LN multi-site planning with AI. Cross-plant scheduling, intercompany transfer optimization, and global demand balancing.
AI on your ERP
- AI for Sales and Operations Planning, Built on the Numbers Already in Your ERPAI on ERP data for S&OP: forecast review, supply-demand gaps, scenario questions and meeting packs, with the numbers traceable and run on-prem if needed.
- Infor AI Data Requirements: Getting LN, M3 and SyteLine Data Ready for AIWhat Infor AI needs from your data: Data Lake and ION BOD coverage for CloudSuite, live access paths for on-prem LN, M3 and SyteLine, and clean master data.