How to build a mobile app for MRPeasy
Short answer
Check what MRPeasy's own mobile and shop floor options cover first. For gaps, build a small web or native app over the MRPeasy REST API for barcode scanning, work order reporting and stock moves, with a local queue for poor connectivity.
MRPeasy has its own mobile and shop floor features, and for many small shops they are enough. The reason people search for something more is specific: a scanner workflow that matches how their warehouse really works, a simpler screen for operators, a count process, or a way to capture photos and quality notes at the machine.
Because MRPeasy is a cloud system with a REST API, a custom app is a realistic project. It reads and writes the same data, so the office sees reports as they happen.
The risks are not the screens. They are connectivity in the back of a factory, scanning accuracy and keeping the app within what the API allows.
What teams use it for
Scan to receive
Scan a purchase order barcode, confirm quantities per line and post the receipt from a handheld or phone.
Pick for manufacturing order
Show the materials to pick for a work order and confirm each pick by scanning item and location.
Report production progress
Operators start, pause and finish operations and report good and scrap quantities from a tablet at the machine.
Stock transfers and counts
Move items between locations and run cycle counts by scanning, with variance review before adjustments.
Quality checks with photos
Record an inspection result and photo against a work order or lot, for later review.
Manager approvals on the go
Review and approve purchase orders or order changes from a phone with only the data needed to decide.
MRPeasy integration surface
- MRPeasy's built in mobile and shop floor options should be evaluated first; confirm current capabilities on your plan before building anything.
- REST API with API key and secret; these are account level credentials, so a mobile app should call your own backend, not embed the key in the app.
- Resources for items, stock, manufacturing orders, operations, purchase orders and locations; support for each action varies by API version, so verify in a test company.
- Barcodes are your design: use item codes, order numbers or lot numbers printed as Code 128 or QR, and keep the format consistent.
- Hosted SaaS: the app needs internet, so offline behaviour is something your app adds, not something MRPeasy provides.
How it works
- 1
List the gaps
Compare the native features to what operators actually do. Build only what is missing, such as a count flow or a pick screen.
- 2
Put a backend in front of the API
Create a small service that holds the MRPeasy credentials, authenticates users and exposes only the few endpoints the app needs.
- 3
Choose the client
A progressive web app on rugged phones or tablets is quickest. Native is justified for hardware scanner SDKs or heavy offline use.
- 4
Design for scanning
Large buttons, immediate audio and haptic feedback, and a rule that scan confirms the item before quantity entry.
- 5
Handle offline
Queue transactions locally with a unique id, sync when the connection returns, and show clearly what is pending.
- 6
Resolve conflicts
Check stock and order status at sync time; reject or flag transactions that no longer apply.
- 7
Pilot on one process
Roll out receiving or counting first, measure errors and time, then add the next.
Example flows
Cycle count
Trigger: A counter opens the count task for one aisle.
- App lists locations and expected items.
- Counter scans location and item and enters quantity.
- Differences above a tolerance are flagged.
- Supervisor approves and the adjustment is posted.
Result: Counts are done with a scanner, with a clear approval before the stock changes.
Operator reports a finished operation
Trigger: An operator finishes a job at a workstation.
- Scan the work order barcode.
- Select the operation and enter good and scrap quantities.
- App posts the report through the backend.
- Next operation shows as ready.
Result: The planner sees progress without anyone walking the floor.
Keeping data on-prem
MRPeasy is cloud hosted, so there is no on-prem ERP database, but the mobile backend can still live inside your network or private cloud, with devices on factory Wi-Fi or VPN. Photos, notes and any AI features such as reading labels or summarising inspection notes can run on local models, so only the transaction data goes to MRPeasy.
Security checklist
- Never embed the MRPeasy key in the app; use a backend and per user login.
- Enrol devices in mobile device management and enable remote wipe.
- Give operators only the actions their role needs, enforced by your backend.
- Encrypt the offline queue on the device and clear it after sync.
- Log device, user and transaction id for every posting.
Ways to get it done
Use MRPeasy's own mobile features
Effort: Hours to days
Best when they already cover receiving, picking and reporting for your shop.
Custom PWA over a small backend
Effort: 4 to 8 weeks
Good for specific flows, quick to iterate.
Partner build such as Netray
Effort: 6 to 10 weeks
Useful when you want AI features on the device and an on-prem backend.
Pitfalls
- !Replacing working native screens with a custom app adds maintenance with little gain.
- !Offline queues that replay old transactions can post against changed stock.
- !Labels that fail to scan in dirty or dim conditions stall adoption; test barcodes in place.
- !API rate limits matter when many operators sync at shift change.
- !Forgetting a rollback path for a bad posting leaves supervisors editing records by hand.
Frequently asked questions
Does MRPeasy have a mobile app?
MRPeasy provides mobile and shop floor options, but their scope changes between versions and plans, so check the current feature list. A custom app is worth considering only for flows those options do not cover.
Can I scan barcodes with a phone?
Yes. A phone camera works for light use, while rugged scanners with a hardware trigger are faster and more reliable for warehouse volumes. Either can feed a web or native app that calls your backend.
Will it work offline?
MRPeasy needs internet, so offline support has to be built into your app with a local queue and a sync step. Keep offline actions simple, such as counts and reports, and check conflicts when they sync.
Is it safe to call the MRPeasy API from a phone?
Not directly with the shared key. Route calls through a backend you control, authenticate each user and expose only the needed operations, so a lost phone does not expose the whole account.
How long does a first version take?
A single flow such as receiving or counting can be piloted in a few weeks if the API supports the needed transactions. The time goes into testing on the floor, not into the screens.
Want Mobile app working on your MRPeasy?
A free 30 minute assessment: we map the integration path for your version and setup, and where it should run.
Get a free assessmentTry it here, free
MRPeasy vs Katana Selection Scorecard
A 10-question fit test that scores how much planning depth and shop floor control your operation needs, to compare MRPeasy and Katana style cloud MRPs.
Keep exploring
ERP fixes and how-tos
- MRPeasy Custom FieldsHow to approach custom fields in MRPeasy on items, customer orders and BOMs: where to add them, what they can drive, reporting limits and API alternatives.
- SyteLine Service Mobile App: Options for Field Service and Warehouse StaffWhat mobile options exist for SyteLine / CSI field service and warehouse work: browser access, Infor mobile apps, scanner front ends and custom apps, and how to choose.
- MRPeasy API documentation: authentication, endpoints and examplesHow the MRPeasy REST API works: generate a key, authenticate, call endpoints for orders, items and stock, page results with ranges, and handle rate limits.
Runs with your ERP
- RF-SMART Mobile Inventory with Oracle Fusion Cloud SCMRF-SMART gives Oracle Fusion Cloud SCM a handheld barcode app for inventory, PAR and manufacturing transactions with single sign-on: flows, setup, pitfalls.
- Cloud Inventory (DSI) with Oracle E-Business Suite: Mobile Barcode InventoryCloud Inventory, formerly DSI, adds offline mobile barcode inventory to Oracle E-Business Suite and JD Edwards. Data flows, setup steps, pitfalls and AI notes.
- ByDintec and SAP Business ByDesign: handheld warehouse transactions with continuous scanningByDintec is a handheld extension for SAP Business ByDesign with continuous-scan warehouse transactions, serial numbers and label creation. Setup and pitfalls.
Guides
- SyteLine Mobile App Deployment GuideDeploy SyteLine mobile applications. Infor Go configuration, mobile form design, offline capabilities, and device management for CloudSuite Industrial.
- Mobile Shop Floor Reporting for SyteLine ProductionImplement mobile shop floor data collection in SyteLine. Configure labor reporting, operation completions, and production data capture on handheld devices.
- Setting Up the SyteLine Mobile Warehouse Management AppConfigure the SyteLine mobile warehouse management app. Set up device profiles, warehouse workflows, and real-time inventory operations for CloudSuite Industrial.
Integrations
- How to add a mobile app to Infor SyteLineBuild or extend a mobile app for Infor SyteLine: barcode scanning, labor reporting, inventory moves and approvals over IDO REST, with offline and device options.
- How to build a mobile app for Oracle NetSuiteBuild or choose a mobile app for Oracle NetSuite: barcode scanning, receiving, inventory moves and labor reporting over RESTlets and SuiteTalk REST, with offline limits.