Association: Aerospace quality standards

SAE International, IAQG and the AS9100 family: who owns what and what it means for your systems

AS9100 is the aerospace quality management standard built on ISO 9001. The International Aerospace Quality Group (IAQG) develops the 9100 series, SAE International publishes the American versions, and certificates are issued by certification bodies and recorded in the OASIS database. Related standards cover first article inspection, distributors, maintenance organizations and advanced product quality planning.

Who the members are

  • Aerospace machining and fabrication

    Shops making structural and engine parts hold AS9100 certification because primes require it for approved supplier status, and use AS9102 for first article reports.

  • Distributors and stockists

    Distributors of aerospace materials and hardware work to AS9120, which adds traceability and counterfeit part controls suited to resale.

  • Maintenance, repair and overhaul

    MRO organizations use AS9110 for maintenance quality requirements alongside regulator approvals.

  • Electronics and cable assemblies

    Electronics suppliers to avionics and defense programs often hold AS9100 and work to additional workmanship and counterfeit prevention standards.

  • Castings, forgings and materials

    Material producers supply certified lots with chemistry and mechanical test data that must follow the part through every tier.

The ecosystem

  • SAE International standard body

    Global standards organization, based in Warrendale, Pennsylvania, that publishes AS9100 in the Americas along with AMS material specifications.

  • International Aerospace Quality Group (IAQG) standard body

    Industry group formed by aerospace companies, organized into Americas, Europe and Asia-Pacific sectors, that develops the 9100 series.

  • OASIS database database

    The IAQG Online Aerospace Supplier Information System, where certified organizations and their certificates are listed.

  • Certification bodies under the ICOP scheme certification body

    Accredited bodies that audit and certify organizations under the Industry Controlled Other Party scheme for the 9100 series.

  • Performance Review Institute (PRI) standard body

    Administers Nadcap, which complements AS9100 for special processes.

  • Aerospace Industries Association (AIA) association

    U.S. trade association whose members are among the primes that require AS9100 from suppliers.

Requirements customers here expect

AS9100D for manufacturing organizations, with EN9100 and JISQ9100 as regional equivalentsAS9110 for maintenance organizations and AS9120 for distributorsAS9102 first article inspection with forms for parts, materials and characteristicsAS9145 for advanced product quality planning and production part approvalAS9103 for variation management of key characteristicsConfiguration management, risk management and product safety clausesPrime-specific supplier requirements in addition to the standard

Who does what in the 9100 ecosystem

IAQG writes the requirements. SAE publishes the standard in the Americas, with regional equivalents published elsewhere. Independent certification bodies audit the organization, and the certificate is entered in OASIS, which primes and buyers use to verify status.

Certification does not confer prime approval by itself. Customers add their own supplier requirements and may audit on top. Revision status of the standard changes over time, so confirm the current revision and transition dates with IAQG and your certification body rather than relying on an old guide.

What the standard asks of your records

Beyond ISO 9001, AS9100 adds requirements around configuration management, risk, on-time delivery performance, counterfeit part prevention, product safety, key characteristics and control of external providers. Each one needs records that a certification auditor can sample.

In practice that means ERP data for supplier performance and on-time delivery, controlled item and drawing revisions, lot traceability, nonconformance and corrective action tracking, and documented first article inspection. The standard does not prescribe a system, but weak data models make every one of these harder to evidence.

  • On-time delivery and quality ratings per supplier
  • Revision control from engineering through work order
  • Nonconformance, corrective action and containment linked to lots
  • First article inspection records per AS9102

Try it here, free

First Article Inspection Report Template (AS9102, Excel)

Open full tool

A free FAI report built on the AS9102 structure: part accountability, product accountability and characteristic accountability with ballooning guidance, exportable to Excel.

AS9102 and AS9145 in a job shop

AS9102 defines the first article inspection report with forms covering part number accountability, product accountability and characteristic accountability. Ballooned drawings and measured results must tie back to the drawing revision, which is why many shops struggle when revisions change mid-job.

AS9145 applies APQP and PPAP thinking to aerospace production, with planning, risk and process control deliverables. Plan for the extra documentation at quote time, since both standards add engineering and inspection hours that a commercial quote would not include.

Private AI for quality teams

A private model with retrieval over your quality manual, procedures, audit findings, nonconformance history and ERP data can help staff find the governing procedure, draft corrective action text for review and answer questions such as which lots used a given supplier or material. The quality manager still owns every record.

It is not a substitute for the audit process or a way to generate evidence. Run it on your own infrastructure if records include controlled customer data, keep it read-only against the ERP by default and log the queries it runs so answers can be checked.

Frequently asked questions

What is the difference between AS9100, AS9110 and AS9120?

AS9100 applies to organizations designing or manufacturing aerospace products. AS9110 applies to maintenance, repair and overhaul organizations. AS9120 applies to distributors and stockists. All build on ISO 9001 with aerospace-specific additions, and each is certified separately.

Who publishes AS9100 and who certifies companies?

IAQG develops the 9100 series and SAE International publishes AS9100 in the Americas. Companies are certified by independent certification bodies working under the ICOP scheme, and valid certificates appear in the OASIS database. SAE and IAQG do not issue certificates directly.

How do I verify an AS9100 certificate?

Search the OASIS database, which lists certified organizations, their scope and certificate status as reported by certification bodies. Also confirm the scope matches the site and products you are buying, since certificates are scope and site specific.

What is AS9102 first article inspection?

AS9102 is the aerospace requirement for first article inspection reports. It uses three forms covering part number accountability, product accountability and characteristic accountability. A new inspection is typically triggered by a new part, a design or process change or a lapse in production, as defined in the standard and your contract.

How does AS9100 differ from ISO 9001?

AS9100 includes all ISO 9001 requirements and adds aerospace-specific clauses on configuration management, risk, product safety, counterfeit parts, key characteristics and delivery performance. It is audited by certification bodies in the aerospace scheme and customers often expect it for supplier approval.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Tools and guides for manufacturers in this ecosystem

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs

Software