What Is Key Characteristics (AS9103)?
Also known as: KC, key characteristic, AS9103, variation management, critical characteristics
Definition
Key characteristics are the features of a material, part or process whose variation has a significant influence on product fit, form, function, performance, service life or manufacturability, and which therefore get special control under AS9103 variation management.
Key Characteristics (AS9103) Explained
Not every dimension on a drawing deserves the same attention. Designers identify key characteristics (KCs) where variation matters most, such as a bore diameter that controls a bearing fit or a seal surface finish. Critical items related to safety are managed separately under stricter rules, and customers define how each is flagged on drawings.
AS9103 is the aerospace standard for variation management of key characteristics. It describes how to identify KCs, determine the process capability needed, plan controls, monitor with statistical methods, and react when the process shifts. Suppliers typically demonstrate capability with metrics such as Cp and Cpk, and customers set acceptance targets in the contract or the quality requirements flowed down.
KCs link several tools. The design FMEA and process FMEA help decide what is key, the control plan defines how each is measured, SPC charts show whether the process remains stable, and the first article inspection report under AS9102 identifies each KC as characteristic accountability. The more consistently these are tied together, the easier audits become.
In ERP and QMS terms, KCs show up as inspection plan characteristics with a KC flag, frequency rules, gauges and specification limits. Results are collected at in-process or final inspection, and failures create a nonconformance linked to lot and serial. ERP quality modules in SyteLine, Infor LN, SAP QM and others can hold the plan, while charting often lives in SPC software.
Why It Matters
- Customers contractually require evidence of capability on KCs, and failure to show it can restrict approval of the part.
- Focused control on key features is cheaper than inspecting every feature at the same level.
- A shifting process is detected early by SPC, before it produces nonconforming parts.
- KC data supports root cause investigation and supplier corrective action.
In Practice
Example: a drawing marks bore diameter 25.000 +0.013 mm as a KC with a required Cpk of at least 1.33. The inspection plan samples five pieces per lot and records readings. Over ten lots the Cpk comes out near 1.1, which is below target, so the team investigates tool wear and adds a compensation step. The gotcha is calculating Cpk from too few samples or from data that mixes machines, which hides the real behaviour.
Frequently Asked Questions
What is AS9103?
AS9103 is the aerospace standard for variation management of key characteristics. It sets out how to identify them, assess process capability, control and monitor them.
What Cpk is required for key characteristics?
It is set by the customer or contract rather than by the standard. A value of 1.33 is commonly seen, but always use the requirement in your purchase order or quality flow-down.
Is a key characteristic the same as a critical item?
No. Critical items are tied to safety or flight-critical risk and carry stricter controls. Key characteristics cover features with significant influence on fit, function or performance.
Related Terms
Cp and Cpk
Cp and Cpk are process capability indices. Cp compares the specification width to the process spread, assuming perfect centering, while Cpk also accounts for how far the process mean has drifted from the center of the tolerance.
SPC (Statistical Process Control)
SPC (Statistical Process Control) is the use of control charts and statistical rules to monitor a process in real time, distinguishing normal common-cause variation from special-cause variation that signals a genuine change requiring action.
FMEA (Failure Mode and Effects Analysis)
FMEA (Failure Mode and Effects Analysis) is a structured risk assessment that identifies how a product or process can fail, the effects and causes of each failure, and existing controls, then prioritizes actions to prevent the highest-risk failures.
AS9102 First Article Inspection
AS9102 First Article Inspection is the aerospace requirement to verify that a production process reliably produces conforming parts by fully inspecting and documenting a representative first article against every drawing and specification characteristic.
AS9100
AS9100 is the quality management system standard for the aviation, space, and defense industry, published by SAE and the International Aerospace Quality Group, which incorporates all of ISO 9001 and adds sector-specific requirements for safety, configuration, and risk.
Go Deeper
AS9100 Audit Readiness Checklist
A 30-point checklist for AS9100 Rev D certification and surveillance audits, weighted toward the aerospace-specific requirements where auditors write the most findings.
Free ToolAerospace Supplier Scorecard
Rate a supplier across 10 criteria - OTD, quality escapes, AS9100 status, FAI performance, CAPA responsiveness, compliance flowdown, and financial health - for an instant risk rating.
SyteLine Inspection Plan Configuration
Configure SyteLine inspection plans with test criteria, sampling rules, and measurement specs. Set up receiving, in-process, and final inspection plans in CloudSuite.
Working with Key Characteristics (AS9103) in a live environment? Our engineers do this every day - and our AI agents automate most of it.
Try it here, free
Key Characteristic Control Plan Template
A control plan document for key characteristics with measurement method, sample plan, capability target and reaction plan, ready for AS9103 style variation management.
Keep exploring
Free tools
- Key Characteristic Control Plan TemplateA control plan document for key characteristics with measurement method, sample plan, capability target and reaction plan, ready for AS9103 style variation management.
- Aerospace Key Characteristics WorksheetList key characteristics, their risk, control method and capability so variation is managed where it matters most.
- Special Characteristics Matrix WorksheetTrace each special characteristic from drawing to PFMEA, control plan, gage and capability study in one editable table.