Sheet Metal First Article Inspection Report Template
A first article inspection (FAI) proves that the first parts off a new setup meet the drawing before the full lot is run. This template gives fabricators a clean report with ballooned characteristics, measured values and sign-off.
Fill in
Sheet Metal First Article Inspection Report Template
First Article Inspection Report
Supplier: Northline Metalworks Customer: Harlan Enclosures Inc. Part: HE-2204-B rev C PO: PO-77412 Reason: New part
Material
5052-H32, 2.0 mm, mill cert L-55318
Measuring equipment
Digital caliper ID C-114, bevel protractor ID P-021, height gauge ID H-007. Calibration current.
Characteristics
| Balloon | Feature | Requirement | Tolerance | Measured | Pass / Fail |
|---|---|---|---|---|---|
| 1 | Overall length | ||||
| 2 | Overall width | ||||
| 3 | Hole diameter | ||||
| 4 | Hole position to datum A | ||||
| 5 | Flange height | ||||
| 6 | Bend angle | 90 deg | +/- 1 deg | ||
| 7 | Flatness | ||||
| 8 | Hardware seated (PEM) | Flush | |||
| 9 | Finish and color |
Result
Overall result: Accepted Inspector: R. Banda Date: 2026-10-20
Approvals
This is a general structure for first article reports on fabricated parts, not a copy of any customer or industry form. If your customer requires AS9102 or a PPAP package, use that required format.
Connect inspection data to your ERP
Optional: a short chat on storing FAI and inspection results against items and lots.
Optional. The tool and every export work without this. No spam.
How to use the report
Balloon every dimension, note and tolerance on the drawing and number them. List each balloon in the table with the requirement and tolerance, then measure the first piece and write the actual value. Mark pass or fail per row. Set the overall result and sign. Keep the marked-up drawing with the report so a reviewer can trace each number. Run the FAI before releasing the lot to the next operation.
When an FAI is needed
Typical triggers are a new part number, a revision change, a major tooling or program change, a move to a new machine or a long gap in production. Many customer quality agreements spell out their own triggers, so check the terms. Even when not required, an FAI on a new bent and welded part catches program errors early, when only one piece is affected.
- New part or new revision
- New tooling, die or laser program
- Process or location change
- Extended production break
Measuring sheet metal parts
Flat features such as hole size and position can be measured with calipers, pin gauges or a CMM. Bend angles are usually checked with a protractor or an angle gauge, and flange lengths with a height gauge or a profile fixture. Account for springback on formed parts and measure after the part has settled. Record equipment IDs so calibration can be verified later.
Common mistakes
Skipping notes and finish requirements on the drawing is common; they count as characteristics. Another miss is measuring a part that was hand tuned and cannot be repeated by production. Run the FAI part on the actual production setup. Also avoid rounding measured values to the tolerance limit; record what the gauge shows.
Frequently Asked Questions
Is this the same as AS9102?
No. It is a general first article report for fabricated parts. AS9102 has specific forms and rules for aerospace. If your customer requires AS9102, use its required forms instead of this template.
How many parts should I measure?
A first article is typically one representative piece, though some customers require several. Follow the quality agreement. For critical features you may also want a short capability check on additional parts.
Do I need to balloon the drawing?
Yes, ballooning gives each requirement a number that links drawing and report. It also makes sure no dimension or note is skipped. Ballooning can be done on a PDF markup or on a printed copy.
Can I add more characteristics?
Yes. The table has nine starter rows. Export to Word or Excel and add rows for every balloon on your drawing.
If you want FAI data to feed supplier scorecards or ERP quality records, we can discuss how to capture it without retyping.
Related Tools
Sheet Metal Nonconformance Report Template
An NCR form for fabricated parts covering defect description, quantity affected, containment, cause, disposition and corrective action.
Industry TemplatesSheet Metal Job Traveler Template
A printable job traveler for laser, punch, brake, weld and finish routings with material heat lot, program names and operator sign-offs.
Industry TemplatesPress Brake Setup Sheet Template
A setup sheet for press brake jobs listing punch, die, bend sequence, angle targets and backgauge positions so repeat jobs set up fast.
Supply Chain & InventorySheet Metal Outside Processing Tracker Worksheet
Log parts sent out for powder coat, plating, anodize or heat treat with vendor, quantity, cost, lead time and status.
More Quality & Inspection tools
See all- Sheet Metal Bend Inspection Record Template
- Sheet Metal Quote Review Checklist Before Sending
- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
Keep exploring
Free tools
- Sheet Metal Nonconformance Report TemplateAn NCR form for fabricated parts covering defect description, quantity affected, containment, cause, disposition and corrective action.
- Sheet Metal Quote Worksheet TemplateA fill-in quote document for fabricated sheet metal parts, with cost build-up, quantity breaks, assumptions and terms, ready to export.
- PCBA First Article Inspection Report TemplateA fill-in first article report for a new PCB assembly job: setup verification, BOM and placement checks, solder inspection and sign-off.
ERP fixes and how-tos
- What Is First Article Inspection in SAP, and How to Run It in QMFirst article inspection in SAP means inspecting the first piece of a production run through QM. Learn the inspection type, lot trigger and results recording.
- How to Populate AS9102 First Article Inspection Forms From ERP DataWhich AS9102 Form 1, 2 and 3 fields can come from the ERP, how to trigger a new or partial FAI from engineering changes and routing changes, and what stays manual.
- How to create an inspection plan in SAP QM (QP01)Create an inspection plan in SAP QM with QP01: header, operations, master inspection characteristics, sampling procedure and material assignment, plus a plan report.
Guides
- SyteLine First Article Inspection (FAI) Process ConfigurationConfigure SyteLine first article inspection for new part qualification. Set up FAI plans, measurement recording, and AS9102 compliance reporting in CloudSuite Industrial.
- How to Set Up AS9100 Compliance in SyteLineComprehensive guide to configuring Infor SyteLine for AS9100 aerospace quality management compliance. Set up first article inspection, special processes, key characteristics, and traceability requirements.
- ERP for Metal Fabrication: Nesting, Traceability, and Job CostingERP for metal fabrication: laser and press brake routings, nesting and drop tracking, mill test report traceability, weld inspection and real-time job costing.
AI on your ERP
- AI for 1factory: First Article and Inspection Data Joined to Your ERPPrivate AI for 1factory: first article inspection (AS9102), ballooned drawings and inspection data joined to ERP work orders, lots and suppliers.
- AI for E2 Shop System in Metal Fabrication: Quote History, Material Yield and Delivery RiskPrivate AI for E2 Shop System fabricators: sheet and plate quoting history, nesting yield, welding job costs and delivery risk, answered from your own data.
Manufacturing hubs
- SAE International, IAQG and the AS9100 family: who owns what and what it means for your systemsHow SAE International publishes the AS9100 family, how IAQG and OASIS fit in, and what AS9102, AS9120 and AS9145 mean for ERP, quality records and private AI.
- Greater Toronto Area precision machining and aerospace suppliersGuide to precision machining and aerospace suppliers in the Greater Toronto Area: AS9100, NADCAP, Controlled Goods, ecosystem groups, ERP and quoting issues.
Software
- 1factory1factory explained: cloud quality management with drawing ballooning, inspection plans, FAI, SPC and supplier quality, plus integrations and alternatives.
- SOLIDWORKSWhat SOLIDWORKS is, its modules (parts, assemblies, drawings, sheet metal, simulation, PDM), how it feeds ERP and CAM, and its main alternatives.