On-prem models / Moonshot AI

Run Kimi-K2.6 on-prem

1T-parameter MoE (32B active) native multimodal agent model with the DeepSeek-V3-style MLA architecture and a 400M MoonViT encoder. Released with native INT4 weights from quantisation-aware training.

1000B MoE (32B active)256K contextModified MITtext + visionthinking modetool callingreleased 2026-04

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)2000 GB0.58 GB2.30 GB9.21 GB
FP81000 GB0.29 GB1.15 GB4.61 GB
INT4 (AWQ / GPTQ)560 GB0.29 GB1.15 GB4.61 GB
GGUF Q4_K_M600 GB0.29 GB1.15 GB4.61 GB

KV cache from the published config: 61 layers, MLA latent 512 + 64 RoPE dims. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

A capable on-prem agent brain for enterprises that can afford one 8-GPU server: multi-step ERP workflows, document understanding and SQL with tool feedback. Overkill for single-task extraction.

Strengths

  • Strong long-horizon coding and agent-swarm orchestration
  • Native INT4 (about 0.6 TB) runs on one 8x H200 or 8x B200 node
  • Thinking and Instant modes
  • Well supported by vLLM, SGLang and KTransformers

Watch out for

  • Still needs a full 8-GPU server
  • MLA cache on all 61 layers: long context costs more than hybrid models
  • Attribution clause at very large scale

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
NVIDIA A100 80GB PCIe8573 / 576 GB119
NVIDIA A100 80GB SXM8573 / 576 GB121
NVIDIA H100 PCIe 80GB8573 / 576 GB121
NVIDIA H100 SXM 80GB8573 / 576 GB142
NVIDIA B200 180GB4567 / 648 GB185
NVIDIA H100 NVL 94GB8573 / 676 GB148
NVIDIA RTX PRO 6000 Blackwell Server Edition 96GB8573 / 691 GB110
AMD Instinct MI300X 192GB4567 / 691 GB162

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
AMD Instinct MI355X 288GB41018 / 1036 GB142
NVIDIA B200 180GB81024 / 1296 GB147
AMD Instinct MI300X 192GB81024 / 1382 GB131
AMD Instinct MI325X 256GB81024 / 1843 GB136
NVIDIA B300 (Blackwell Ultra) 270GB81024 / 1944 GB147

Serving and licence

vLLM, SGLang and KTransformers listed by Moonshot; transformers >= 4.57.1. Instant mode via chat_template_kwargs thinking false. KTransformers enables CPU/GPU hybrid serving on smaller GPU counts.

Modified MIT. MIT terms plus one condition: products over 100M MAU or US$20M monthly revenue must display 'Kimi K2.6' in the UI.

Model card on Hugging Face

Design a Kimi-K2.6 deployment

Preloaded with Kimi-K2.6. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does Kimi-K2.6 need?

The weights alone take about 2000 GB in BF16, 1000 GB in FP8 and 560 GB in 4-bit. On top of that each request holds a KV cache of about 0.29 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 5.76 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs Kimi-K2.6?

For a single user at 8K context in 4-bit, 8 x NVIDIA A100 80GB PCIe (80 GB each) fits, at an estimated 119 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is Kimi-K2.6 allowed for commercial use?

Kimi-K2.6 is released under Modified MIT. MIT terms plus one condition: products over 100M MAU or US$20M monthly revenue must display 'Kimi K2.6' in the UI. Check the licence text on the model card with your legal team before production use.

Which engine should serve Kimi-K2.6 on-prem?

vLLM, SGLang and KTransformers listed by Moonshot; transformers >= 4.57.1. Instant mode via chat_template_kwargs thinking false. KTransformers enables CPU/GPU hybrid serving on smaller GPU counts.