GPUs for on-prem AI / AMD

AMD Instinct MI355X 288GB for LLMs

CDNA 4 part (launched June 2025) adding MXFP4/MXFP6 (10.1 PFLOPS MXFP4); 1400W, usually liquid cooled. AMD figures are dense (2x with sparsity). Sold in 8-GPU platforms; no unit price published.

Memory
288 GB HBM3E
Bandwidth
8,000 GB/s
BF16 dense
2,500 TFLOPS
FP8 dense
5,000 TFLOPS
Power
1400 W

OAM | Infinity Fabric 7 links x 153 GB/s | ROCm

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
MiniMax-M3428B / 23B11942142
Qwen3.5-397B-A17B403B / 17B12402181
Llama 4 Maverick 17B-128E Instruct400B / 17B12352158
Trinity Large Thinking398B / 13B12732176
GLM-5.3-Flash320B / 18B12322190
MiMo-V2.6-Flash-RL309B / 15B12602201
Hy3295B / 21B12012118
Command A+ (05-2026)218B / 25B11831107
Step-3.7-Flash198B / 11B13081191
Qwen3.8-Flash-Next180B / 6B14081289
Mistral Medium 3.5 128B128B160132
Qwen3.5-122B-A10B125B / 10B13261219
Ling-3.0-flash124B / 5.1B14351332
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B12971203
Mistral Small 4 119B A6B (2603)119B / 6.5B13961280
gpt-oss-120b117B / 5.1B14321298
Command A (03-2025)111B169138
Llama 4 Scout 17B-16E Instruct109B / 17B12351118
Qwen3-Coder-Next79.7B / 3B15051381
Llama 3.3 70B Instruct70B1102153
Qwen3.6-35B-A3B36B / 3B15051389
Qwen3-32B32.8B1184194
Olmo 3.1 32B Think32B11871104
GLM-4.7-Flash31.2B / 3B15001337
Gemma 4 31B IT30.7B1191198
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B14821280
Granite 4.2 30B30B1195199
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B15081416
Qwen3.8-27B27.8B12101127
Gemma 3 27B IT27B12111120
Gemma 4 26B A4B IT25.2B / 3.8B14661301
Mistral Small 3.2 24B Instruct 250624B12291126
Magistral Small 1.2 (2509)24B12291126
Devstral Small 2 24B Instruct 251224B12291126
gpt-oss-20b21B / 3.6B14821358
Phi-414B13101161
Gemma 4 12B IT11.95B13381203
Qwen3.5-9B9.7B13781263
Qwen3-VL-8B-Instruct8.8B13861216
Granite 4.2 8B8B13991217
Llama 3.1 8B Instruct8B14011232
Muse Spark Open 816B-A42B816B / 42B21564128
DeepSeek-V4.1-Flash-1017748B / 16B22714225
GLM-5.3744B / 40B21534122
Mistral Large 3 675B Instruct 2512675B / 41B21594133
DeepSeek-V3.2671B / 37B21684139
DeepSeek-V4-Pro-08131600B / 49B41618133
MiMo-V2.6-Pro-RL1020B / 42B41604126
Kimi-K2.61000B / 32B41854147
Kimi-K2.7-Code1000B / 32B41854147
Kimi-K32800B / 104B810416 (multi-node)61
Qwen3.8-2.4T-A95B2446B / 95B810716 (multi-node)62

Design a deployment on AMD Instinct MI355X 288GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one AMD Instinct MI355X 288GB?

Of the models we track, MiniMax-M3 (428B total, 23B active) fits on a single 288 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is AMD Instinct MI355X 288GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 8000 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 1000 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is AMD Instinct MI355X 288GB a good choice for on-prem AI?

CDNA 4 part (launched June 2025) adding MXFP4/MXFP6 (10.1 PFLOPS MXFP4); 1400W, usually liquid cooled. AMD figures are dense (2x with sparsity). Sold in 8-GPU platforms; no unit price published.