GPUs for on-prem AI / NVIDIA

NVIDIA H100 NVL 94GB for LLMs

PCIe Hopper with 94GB and 3.9 TB/s for air-cooled mainstream servers; 350-400W configurable. NVIDIA lists 1,671/3,341 TFLOPS with sparsity, halved here. Price is an indicative 2026 street range for one unit, not a quote.

Memory
94 GB HBM3
Bandwidth
3,900 GB/s
BF16 dense
835 TFLOPS
FP8 dense
1,670 TFLOPS
Power
400 W

PCIe | NVLink bridge 600 GB/s | CUDA | indicative price $25K-32K

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Mistral Medium 3.5 128B128B131227
Qwen3.5-122B-A10B125B / 10B12122168
Ling-3.0-flash124B / 5.1B13192246
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B11872140
Mistral Small 4 119B A6B (2603)119B / 6.5B12782218
gpt-oss-120b117B / 5.1B13152231
Command A (03-2025)111B135233
Llama 4 Scout 17B-16E Instruct109B / 17B1140296
Qwen3-Coder-Next79.7B / 3B14021263
Llama 3.3 70B Instruct70B154243
Qwen3.6-35B-A3B36B / 3B14031270
Qwen3-32B32.8B1104149
Olmo 3.1 32B Think32B1106155
GLM-4.7-Flash31.2B / 3B13961222
Gemma 4 31B IT30.7B1109152
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B13741174
Granite 4.2 30B30B1112152
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B14061298
Qwen3.8-27B27.8B1122169
Gemma 3 27B IT27B1123165
Gemma 4 26B A4B IT25.2B / 3.8B13541191
Mistral Small 3.2 24B Instruct 250624B1135168
Magistral Small 1.2 (2509)24B1135168
Devstral Small 2 24B Instruct 251224B1135168
gpt-oss-20b21B / 3.6B13731241
Phi-414B1198189
Gemma 4 12B IT11.95B12231118
Qwen3.5-9B9.7B12601160
Qwen3-VL-8B-Instruct8.8B12671126
Granite 4.2 8B8B12801127
Llama 3.1 8B Instruct8B12831137
Command A+ (05-2026)218B / 25B21504133
Step-3.7-Flash198B / 11B22284180
Qwen3.8-Flash-Next180B / 6B22824217
MiniMax-M3428B / 23B41648131
Qwen3.5-397B-A17B403B / 17B41828149
Llama 4 Maverick 17B-128E Instruct400B / 17B41978151
Trinity Large Thinking398B / 13B41928147
GLM-5.3-Flash320B / 18B42004156
MiMo-V2.6-Flash-RL309B / 15B42074163
Hy3295B / 21B4147495
MiMo-V2.6-Pro-RL1020B / 42B812816 (multi-node)77
Kimi-K2.61000B / 32B814816 (multi-node)88
Kimi-K2.7-Code1000B / 32B814816 (multi-node)88
Muse Spark Open 816B-A42B816B / 42B813616 (multi-node)83
DeepSeek-V4.1-Flash-1017748B / 16B821316 (multi-node)132
GLM-5.3744B / 40B812216 (multi-node)71
Mistral Large 3 675B Instruct 2512675B / 41B813916 (multi-node)84
DeepSeek-V3.2671B / 37B814216 (multi-node)86
DeepSeek-V4-Pro-08131600B / 49B16 (multi-node)9124 (multi-node)79
Kimi-K32800B / 104B24 (multi-node)5740 (multi-node)51
Qwen3.8-2.4T-A95B2446B / 95B24 (multi-node)5832 (multi-node)56

Design a deployment on NVIDIA H100 NVL 94GB

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one NVIDIA H100 NVL 94GB?

Of the models we track, Mistral Medium 3.5 128B (128B) fits on a single 94 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is NVIDIA H100 NVL 94GB for LLM inference?

Generation speed is mostly set by memory bandwidth: 3900 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 488 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is NVIDIA H100 NVL 94GB a good choice for on-prem AI?

PCIe Hopper with 94GB and 3.9 TB/s for air-cooled mainstream servers; 350-400W configurable. NVIDIA lists 1,671/3,341 TFLOPS with sparsity, halved here. Price is an indicative 2026 street range for one unit, not a quote.