GPUs for on-prem AI / NVIDIA

NVIDIA A100 80GB SXM for LLMs

HGX A100 8-GPU systems remain common on-prem for 70B-class serving with tensor parallel over NVLink; no FP8. Price is an indicative 2026 street range for one unit, not a quote.

Memory
80 GB HBM2e
Bandwidth
2,039 GB/s
BF16 dense
312 TFLOPS
FP8 dense
no
Power
400 W

SXM4 | NVLink 600 GB/s | CUDA | indicative price $8,000-15K

Which models fit, and how many cards

Planning estimates. 4-bit column: one user at 8K context. FP8 column: 10 users at once at 16K context.

ModelSize4-bit: cards4-bit: tok/sFP8, 10 users: cardsFP8: tok/s per user
Qwen3.5-122B-A10B125B / 10B11312109
Ling-3.0-flash124B / 5.1B12162177
NVIDIA Nemotron 3 Super 120B-A12B120B / 12B1113293
Mistral Small 4 119B A6B (2603)119B / 6.5B11812148
gpt-oss-120b117B / 5.1B12132160
Command A (03-2025)111B119218
Llama 4 Scout 17B-16E Instruct109B / 17B181257
Qwen3-Coder-Next79.7B / 3B12952204
Llama 3.3 70B Instruct70B129224
Qwen3.6-35B-A3B36B / 3B12961175
Qwen3-32B32.8B159127
Olmo 3.1 32B Think32B160130
GLM-4.7-Flash31.2B / 3B12891138
Gemma 4 31B IT30.7B162128
Qwen3-30B-A3B-Instruct-250730.5B / 3.3B12671104
Granite 4.2 30B30B164129
NVIDIA Nemotron 3.5 Lightning 30B-A3B30B / 3B12991198
Qwen3.8-27B27.8B170138
Gemma 3 27B IT27B171135
Gemma 4 26B A4B IT25.2B / 3.8B12481115
Mistral Small 3.2 24B Instruct 250624B178137
Magistral Small 1.2 (2509)24B178137
Devstral Small 2 24B Instruct 251224B178137
gpt-oss-20b21B / 3.6B12661152
Phi-414B1121150
Gemma 4 12B IT11.95B1138167
Qwen3.5-9B9.7B1167195
Qwen3-VL-8B-Instruct8.8B1173173
Granite 4.2 8B8B1183173
Llama 3.1 8B Instruct8B1185180
Command A+ (05-2026)218B / 25B293484
Step-3.7-Flash198B / 11B21614132
Qwen3.8-Flash-Next180B / 6B22214176
Mistral Medium 3.5 128B128B228425
MiniMax-M3428B / 23B41238101
Qwen3.5-397B-A17B403B / 17B41438122
Llama 4 Maverick 17B-128E Instruct400B / 17B41518116
Trinity Large Thinking398B / 13B41568119
GLM-5.3-Flash320B / 18B41538136
MiMo-V2.6-Flash-RL309B / 15B41638140
Hy3295B / 21B4115882
Kimi-K2.61000B / 32B812116 (multi-node)76
Kimi-K2.7-Code1000B / 32B812116 (multi-node)76
Muse Spark Open 816B-A42B816B / 42B810816 (multi-node)69
DeepSeek-V4.1-Flash-1017748B / 16B818416 (multi-node)119
GLM-5.3744B / 40B810016 (multi-node)62
Mistral Large 3 675B Instruct 2512675B / 41B811016 (multi-node)71
DeepSeek-V3.2671B / 37B811516 (multi-node)73
DeepSeek-V4-Pro-08131600B / 49B16 (multi-node)8124 (multi-node)69
MiMo-V2.6-Pro-RL1020B / 42B16 (multi-node)7616 (multi-node)65
Kimi-K32800B / 104B24 (multi-node)5140 (multi-node)46
Qwen3.8-2.4T-A95B2446B / 95B24 (multi-node)5340 (multi-node)47

Design a deployment on NVIDIA A100 80GB SXM

Preloaded with this hardware. Add your ERP, documents and users.

Loading the architecture builder...

Questions

What is the largest model that fits on one NVIDIA A100 80GB SXM?

Of the models we track, Qwen3.5-122B-A10B (125B total, 10B active) fits on a single 80 GB card in 4-bit with one user at 8K context. More users or longer context need memory for the KV cache, so leave headroom.

How fast is NVIDIA A100 80GB SXM for LLM inference?

Generation speed is mostly set by memory bandwidth: 2039 GB/s here. Each token reads the active weights once, so a model with 8 GB of active weights tops out near 255 tokens per second per stream before efficiency losses; batching many users raises total throughput.

Is NVIDIA A100 80GB SXM a good choice for on-prem AI?

HGX A100 8-GPU systems remain common on-prem for 70B-class serving with tensor parallel over NVLink; no FP8. Price is an indicative 2026 street range for one unit, not a quote.