On-prem models / NVIDIA

Run NVIDIA Nemotron 3 Super 120B-A12B on-prem

A LatentMoE hybrid of Mamba-2, 512-expert MoE and attention layers with multi-token prediction, released March 11, 2026. It was pretrained with NVFP4 on over 25T tokens and is aimed at collaborative agents and high-volume workloads such as IT ticket automation.

120B MoE (12B active)1024K contextNVIDIA Nemotron Open Model Licensetextthinking modetool callingreleased 2026-03

Memory needed

PrecisionWeightsKV per request, 8KKV per request, 32KKV per request, 128K
BF16 (full precision)240 GB0.07 GB0.27 GB1.07 GB
FP8120 GB0.03 GB0.13 GB0.54 GB
INT4 (AWQ / GPTQ)67.2 GB0.03 GB0.13 GB0.54 GB
GGUF Q4_K_M72.0 GB0.03 GB0.13 GB0.54 GB

KV cache from the published config: 88 layers, 2 KV heads x 128 dims, 8 full-attention layers. 16-bit cache for BF16 rows, 8-bit otherwise.

Fit for ERP and manufacturing work

Well matched to on-prem ERP agent fleets, ticket triage and RAG over long ERP documentation, with high throughput per GPU. Check language coverage for non-European plants.

Strengths

  • Tiny KV cache from 8 attention layers with 2 KV heads
  • 1M-token context
  • Built-in MTP head for faster generation
  • NVFP4 checkpoint runs on a single B200 or DGX Spark

Watch out for

  • Seven supported languages only
  • Hybrid architecture needs specific engine versions and flags
  • Text only
  • NVIDIA licence is custom, not OSI open source

GPUs that run it

One user, 8K context, 4-bit

HardwareCountMemory usedTok/s per user
NVIDIA A100 40GB PCIe271 / 72 GB116
NVIDIA A100 80GB PCIe169 / 72 GB108
NVIDIA A100 80GB SXM169 / 72 GB113
NVIDIA H100 PCIe 80GB169 / 72 GB111
NVIDIA H100 SXM 80GB169 / 72 GB168
NVIDIA H100 NVL 94GB169 / 84 GB187
NVIDIA L4 24GB474 / 86 GB51
NVIDIA A10 24GB474 / 86 GB81

20 people at once, 16K context, FP8

HardwareCountMemory usedTok/s per user
NVIDIA H200 SXM 141GB1123 / 126 GB136
NVIDIA H200 NVL 141GB1123 / 126 GB136
NVIDIA A100 40GB PCIe4128 / 144 GB97
NVIDIA A100 80GB PCIe2125 / 144 GB88
NVIDIA A100 80GB SXM2125 / 144 GB91
NVIDIA H100 PCIe 80GB2125 / 144 GB90
NVIDIA H100 SXM 80GB2125 / 144 GB126
NVIDIA B200 180GB1123 / 162 GB199

Serving and licence

vLLM 0.18.1 per NVIDIA's card with --kv-cache-dtype fp8 --mamba-ssm-cache-dtype float32; SGLang and TensorRT-LLM supported; NVFP4 and FP8 checkpoints available.

NVIDIA Nemotron Open Model License. NVIDIA's open model licence allows commercial use and NVIDIA states the model is ready for commercial use; review its terms on attribution and redistribution.

Model card on Hugging Face

Design a NVIDIA Nemotron 3 Super 120B-A12B deployment

Preloaded with NVIDIA Nemotron 3 Super 120B-A12B. Add your ERP and documents, change GPUs or users, and export the diagram.

Loading the architecture builder...

Questions

How much VRAM does NVIDIA Nemotron 3 Super 120B-A12B need?

The weights alone take about 240 GB in BF16, 120 GB in FP8 and 67.2 GB in 4-bit. On top of that each request holds a KV cache of about 0.03 GB at 8K tokens of context (FP8 cache), so 20 people generating at once need roughly 0.67 GB more, plus a few GB of runtime overhead.

What is the smallest GPU setup that runs NVIDIA Nemotron 3 Super 120B-A12B?

For a single user at 8K context in 4-bit, 2 x NVIDIA A100 40GB PCIe (40 GB each) fits, at an estimated 116 tokens per second. For a team, size for concurrent requests and context; the builder above does that.

Is NVIDIA Nemotron 3 Super 120B-A12B allowed for commercial use?

NVIDIA Nemotron 3 Super 120B-A12B is released under NVIDIA Nemotron Open Model License. NVIDIA's open model licence allows commercial use and NVIDIA states the model is ready for commercial use; review its terms on attribution and redistribution. Check the licence text on the model card with your legal team before production use.

Which engine should serve NVIDIA Nemotron 3 Super 120B-A12B on-prem?

vLLM 0.18.1 per NVIDIA's card with --kv-cache-dtype fp8 --mamba-ssm-cache-dtype float32; SGLang and TensorRT-LLM supported; NVFP4 and FP8 checkpoints available.