AI & Automation4 min readNetray Engineering Team

Using AI to Read Seal and Gasket Drawings and RFQs for Quoting

Short answer

AI can speed up seal and gasket quoting by reading the RFQ email and attachments, extracting material, durometer, dimensions, tolerances, specifications and quantities into structured fields, finding similar past jobs in your ERP with their actual costs, and drafting a quote for an estimator to review. It does not set price on its own and it will make mistakes on poor scans or ambiguous callouts, so the design must keep a person in the approval loop. This guide explains the workflow step by step, what to expect from accuracy, and how to run it privately when drawings are customer-confidential or export-controlled.

What Arrives in a Seal or Gasket RFQ

Real RFQs are messy. A buyer sends an email with a PDF drawing, a spreadsheet of O-ring sizes, a photo of a worn gasket, or a part number from a competitor's catalog and a request to match it. Some include a spec sheet with an AMS or ASTM callout, others only a trade name.

Quantities may be given as annual usage with release schedules. An estimator spends the first part of every quote simply working out what is being asked. That interpretation step is where AI helps most, because it is reading and structuring, not pricing.

  • Email text with line items and quantities
  • PDF or scanned drawings with notes and tolerances
  • Spreadsheets of sizes and compounds
  • Photos or competitor part numbers needing cross-reference

Step One: Extract Into Structured Fields

A document-reading model pulls the elements that drive cost: material and compound family, durometer, governing specification, dimensions such as ID, cross-section, OD or thickness, tolerance class, special requirements like cure date marking or FAI, and quantity breaks. Each extracted value should link to its source location on the page so the estimator can verify at a glance. Treat extraction accuracy as something to measure on your own documents, not assume.

Handwritten notes, low-resolution scans and unusual drawing formats reduce accuracy, and the system should flag low-confidence fields rather than guess.

Step Two: Match Against Your History

With structured fields, the system searches your ERP and quote archive for similar parts: same material family, similar size, same process. It returns actual yields, cycle times, scrap, tooling used and margin from those jobs. This is the part that turns tribal knowledge into something available to every estimator.

The quality of the answer depends on the quality of your history; if past job actuals are incomplete, the comparisons will be weak, and it is better to say so than to guess. For catalog items, matching is simpler: look up the price book and flag any special requirements that exceed standard terms.

Try it here, free

AI Quote Template and Prompt Set for Manufacturing

Open full tool

A fill-in manufacturing quote plus a reusable AI prompt that turns RFQ details into a structured cost build-up, with a mapping to common ERP quote fields.

Step Three: Draft the Quote, Then a Human Decides

The draft contains material cost, press or machine time, tooling, secondary operations, paperwork and margin, with each line tied to its source. The estimator adjusts for factors the system cannot see, such as customer strategy, current shop load or a risky tolerance, then approves. Nothing is sent or written to the ERP without that approval.

Well-run deployments also record the estimator's edits, which show where the model is consistently off and can improve prompts, standards or retrieval over time.

  • Every line item cites its source job or standard
  • Estimator edits are logged for review
  • No write-back to ERP or email without approval

Privacy: Customer Drawings and Controlled Data

Customer drawings are often proprietary, and defense or aerospace drawings may be export-controlled. Sending them to a public AI service can breach NDAs or regulations. The alternative is to run open-weight models on your own hardware or a private cloud, with document permissions that mirror your existing access rules and logs of what was processed.

Netray builds this kind of private deployment on top of ERP systems such as Infor SyteLine and NetSuite, but any approach should be judged on where data goes, who can access it and how it is audited, and your compliance owner should sign off.

When This Is Not Worth It

If you receive a few RFQs a week, most are repeat parts, or you already use a quoting add-on that handles your volume, AI may add cost without much return. It makes the most sense when RFQ volume is high, estimator time is the bottleneck, drawings vary widely, and your ERP has years of usable job history. Start with a small pilot on one product family and measure time per quote, estimator edits and win rate before expanding.

Frequently asked questions

Can AI read engineering drawings for gasket and seal quotes?

It can extract many callouts such as material, dimensions, tolerances and notes from clean PDFs, and flag uncertain fields. Accuracy drops on poor scans and unusual formats, so an estimator should verify extracted values before pricing.

Will AI set my prices automatically?

It should not. The sensible design drafts a quote from your own history and standards and a person approves it. Pricing strategy, risk and customer context remain human decisions.

Is it safe to upload customer drawings to ChatGPT or similar tools?

Often not. NDAs, customer terms and export controls can prohibit it. Use tools that run inside your own environment with access controls and logs, and check your obligations with your compliance lead or counsel.

How do I know if AI quoting would pay off?

Measure estimator hours per quote, RFQ volume and quote turnaround today. If estimator time is the bottleneck and you have usable job history, a pilot on one product family will show the savings in a few weeks.

To see how this works on your own RFQs, ask Netray for a private pilot on one product family, with extraction accuracy and estimator edits measured before anything goes live.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs