PLM and CAD integrationInfor CloudSuite Industrial (SyteLine)Runs on-prem

Infor CADLink with Infor SyteLine: Items and BOMs from CAD

CADLink lets designers create and edit Infor ERP items and BOMs from inside their CAD or PDM system. Infor lists it as a recommended CloudSuite Industrial add-on. It moves the engineering to ERP handoff to the designer, which removes re-keying but puts ERP data discipline on the engineering team.

How CADLink connects to Infor CloudSuite Industrial (SyteLine)

CSI add-on

Infor's solution overview lists CADLink as a recommended add-on for CloudSuite Industrial. Which CAD and PDM systems it supports and which SyteLine releases are covered should be confirmed in current Infor documentation.

What data moves

FromToDataWhen
CAD / PDMInfor SyteLineNew and edited items and BOM structure created by the designerDesigner saves or releases from the CAD session
Infor SyteLineCAD / PDMExisting item numbers, descriptions, units and BOMs for lookupDesigner searches or opens an assembly
CAD / PDMInfor SyteLineRevision and attribute updatesEngineering change released

Setting it up

  1. 1Confirm CAD compatibilityVerify with Infor that your CAD or PDM product and version are supported by the add-on.
  2. 2Define who may create itemsDecide which designers can create items directly and which need engineering approval.
  3. 3Set item numbering and attributesDefine numbering rules, required fields, product codes and units, so designers cannot create incomplete items.
  4. 4Align BOM structureDecide whether the BOM designers create is engineering or manufacturing, and how phantom and purchased parts are handled.
  5. 5Control engineering changeDefine how revisions and effectivity are handled so BOM changes do not hit open jobs unexpectedly.
  6. 6Train designers on ERP basicsDesigners need to understand what an item, a BOM and a unit mean in SyteLine, not only in CAD.

What usually breaks

  • !Designers create near-duplicate items because search is skipped under time pressure.
  • !Incomplete item fields lead to purchasing and planning issues downstream.
  • !Engineering BOM structure pushed directly as the manufacturing BOM, causing wrong picks and kits.
  • !Revisions updated in CAD but not controlled in SyteLine, so open jobs build to different revisions.
  • !ERP permissions that are too wide let designers change released BOMs.

A private AI layer across both systems

Duplicate and near-match checks

Before a designer creates an item, a private assistant can search the SyteLine item master by description and attributes and show likely existing matches.

BOM change impact

Summarize which open jobs, orders and purchase orders use a BOM that is being changed, for engineering to review.

Item data completeness review

List recently created items that lack fields purchasing or planning needs, and draft the corrections for approval.

Try it here, free

SOLIDWORKS PDM Private AI Layer Blueprint Generator

Open full tool

Generate a plan for adding a private, on-prem AI assistant to a SOLIDWORKS PDM Professional vault using the PDM API.

When something else fits better

  • CADTALK, an Infor Marketplace connector, transfers engineering BOMs into manufacturing BOMs with a review step.
  • Manual or spreadsheet-based item and BOM import works for low volumes of new designs.
  • A PLM system with its own ERP connector if change control and approvals matter more than speed.

Frequently asked questions

What is the difference between CADLink and CADTALK?

CADLink is an Infor add-on that works from inside the CAD or PDM session so designers manage ERP items and BOMs directly. CADTALK is a third-party connector that converts engineering BOMs into manufacturing BOMs. They address the same handoff in different ways.

Does it work with SyteLine on-premise?

Infor lists it for CloudSuite Industrial, but deployment details are not covered by the source for this page. Confirm supported releases and any network requirements for on-premise installations with Infor.

Who should control item creation?

Most companies keep a data steward or engineering manager approving new items, even if designers draft them. The tool removes re-keying, but it does not stop poor data, so numbering rules and required fields should be enforced.

Pairing documented at docs.infor.com/csbi/2025.x/en-us/csbicslib/csbi_solution_overview/xkj16959195688 . CADLink is a product of Infor; Netray is independent and not affiliated with either vendor.

Get Infor SyteLine alerts

Support and maintenance deadlines, release changes that affect Infor SyteLine sites, and new free Infor SyteLine tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor SyteLine: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Software