Parcel shippingSAP ECCRuns on-prem

ShipERP with SAP ECC: native parcel shipping inside SAP

ShipERP is an SAP-native multi-carrier shipping product from ERP Integrated Solutions. It runs as an ABAP add-on inside SAP with no middleware, and covers rate shopping, label printing, tracking and proof of delivery for carriers such as UPS, FedEx, DHL and USPS. It is offered for ECC and S/4HANA private cloud, with a public-cloud edition on SAP Store.

How ShipERP connects to SAP ECC

ABAP add-on inside SAP, no middleware

Because it is installed in the SAP system, it works from delivery and outbound processing in SD/LE, calls carrier services from SAP, and stores tracking and package data against the delivery. For ECC this means a transport-based installation and basis involvement. Confirm supported ECC support packs with the vendor.

Carrier accounts and label printing

You supply your own carrier accounts. Labels print through SAP output management to label printers, so printer setup in the spool is part of the project.

What data moves

FromToDataWhen
SAP outbound deliveryShipERPShip-to, weight, dimensions, service levelPacking or delivery processing
ShipERPCarrierRate and shipment requestsRate shop or ship confirm
CarrierShipERP and SAPLabel, tracking number, chargesShipment created
CarrierSAP deliveryTracking events and proof of deliveryCarrier updates

Setting it up

  1. 1Confirm system compatibilityVerify ECC release, support pack and S/4HANA path with ERP Integrated Solutions.
  2. 2Install the add-onImport transports through your landscape (development, quality, production) with Basis.
  3. 3Load carrier accountsConfigure UPS, FedEx, DHL or USPS credentials and service levels.
  4. 4Set package dataEnsure materials carry weight and dimensions, and define packaging materials.
  5. 5Configure label outputSet output types and spool devices for thermal printers at each packing station.
  6. 6Test rate shopCompare rates to carrier portals for domestic, international and hazmat-excluded shipments.
  7. 7Go live by siteStart with one shipping point, then add others.

What usually breaks

  • !Missing material weights or dimensions, causing wrong rates or rejected shipments.
  • !Carrier credentials stored per environment and not refreshed after copies of production.
  • !Label printers in the spool using the wrong ZPL driver or label size.
  • !International shipments lacking commercial invoice or harmonised code data.
  • !Dangerous goods not supported in the standard flow and shipped manually.
  • !Upgrades or support packs changing delivery user exits the add-on relies on.

A private AI layer across both systems

Shipping cost variance

A private assistant compares billed carrier charges to quoted rates and flags deliveries where the difference is large, with likely causes such as dimensional weight.

Late delivery questions

Ask which orders for a customer are delayed and get tracking status joined to the sales order.

Master data gaps

List materials shipped with missing weight or dimensions and draft corrections for approval.

When something else fits better

  • Your carriers' own web portals for very low parcel volume.
  • A third-party shipping platform via SAP integration if you need many carriers beyond what ShipERP covers.
  • SAP's own transportation and carrier integration options if you already run them.

Frequently asked questions

Does ShipERP need middleware?

The vendor describes an ABAP add-on that runs inside SAP with no middleware. You still need Basis support to install it and network access to the carriers from your SAP system.

Does it work with S/4HANA?

The listing covers SAP ECC, S/4HANA private cloud and a public-cloud edition on SAP Store. Check the exact editions and releases with the vendor for your system.

Can AI help without touching SAP?

Yes. A read-only layer can analyse deliveries, charges and tracking data on your own infrastructure. Any change to shipments or master data should go through a person.

Pairing documented at www.sap.com/products/scm/partners/erp-integrated-solutions-llc-shiperp-private-c . ShipERP is a product of ERP Integrated Solutions; Netray is independent and not affiliated with either vendor.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring