Time and attendance integrationSAP S/4HANARuns on-prem

UKG (Kronos) with SAP S/4HANA and SuccessFactors: syncing time and labor data

UKG Sync for SAP from CloudApper is a no-code connector that syncs UKG (Kronos) time and labor data with SuccessFactors and S/4HANA. It is aimed at labor cost reconciliation between the time system and SAP. It is a third-party API connector, not a UKG or SAP product.

How UKG Sync for SAP connects to SAP S/4HANA

Third-party API connector

The connector uses APIs on the UKG side and on the SAP side to move data on a schedule or on events. Because it is a third-party tool, treat it as community-grade integration rather than a vendor-certified one, and ask CloudApper for the supported SAP interfaces and versions.

No-code mapping layer

Field mappings, transformations and schedules are configured in the connector. This speeds delivery, but the mapping logic still has to reflect your pay rules, cost centers and employee identifiers.

What data moves

FromToDataWhen
UKG (Kronos)SuccessFactors or S/4HANAPunches, hours worked, pay codes, absences and overtimeScheduled sync or period close
SuccessFactors or S/4HANAUKGEmployee master, organisation, cost center and job dataHire, transfer or change
UKGS/4HANA costingLabor hours by cost center for allocationApproved timecards
ConnectorOperations teamSync errors and unmatched recordsFailed or partial sync

Setting it up

  1. 1Agree on identifiersChoose one employee ID that exists in UKG, SuccessFactors and S/4HANA, and clean up mismatches first.
  2. 2Map pay codesMap UKG pay codes, shifts and overtime categories to SAP wage types or time types.
  3. 3Map cost objectsAlign UKG labor levels with SAP cost centers, orders or WBS elements.
  4. 4Provision API accessCreate service accounts with minimal rights in UKG and SAP and store credentials securely.
  5. 5Configure and test syncSet direction, frequency and filters, and test with a small group across a full pay period.
  6. 6Build reconciliation reportsCompare hours in UKG with hours posted in SAP and investigate differences before payroll runs.
  7. 7Plan for upgradesTrack UKG and SAP release changes that could affect APIs the connector depends on.

What usually breaks

  • !Employee ID mismatches that drop or duplicate records.
  • !Pay code mapping gaps, which push hours into the wrong wage type.
  • !Rounding rules that differ between UKG and SAP, leaving small but persistent differences.
  • !Retro changes in UKG after a period closed in SAP.
  • !Connector failures that go unnoticed until payroll, because nobody watches the sync log.
  • !API limits or credential expiry that stop the sync silently.

A private AI layer across both systems

Sync reconciliation

Compare UKG timecards with S/4HANA postings and list differences by employee and pay code, with the most likely cause such as rounding, a retro edit or a missing mapping.

Error log explainer

Read the connector's error log and relevant records to explain each failure in plain language and draft a fix for the integration owner to approve.

Labor cost questions

Let finance ask where labor cost differs from plan by cost center and see the underlying time records.

Try it here, free

UKG Kronos Workforce Central AI Assistant Sizing and Value Calculator

Open full tool

Estimate GPU count, token volume, index size and payback for a private AI assistant on Kronos WFC from users, usage and time saved.

When something else fits better

  • SAP SuccessFactors Time Tracking if you want a single first-party time system and can retire UKG.
  • UKG's own integration options or an integration platform such as SAP Integration Suite for more governance than a no-code tool.
  • A scheduled flat file export and import for a small site where volumes are low.

Frequently asked questions

Is UKG Sync for SAP certified by SAP or UKG?

The record describes it as a third-party API connector from CloudApper. It does not state SAP or UKG certification, so ask the vendor for supported versions and references before relying on it for payroll-critical data.

What data does it sync?

Time and labor data such as hours, pay codes and absences, plus employee and organisation data for matching. The exact objects and fields depend on configuration, so confirm them against your payroll and costing needs.

Why do hours differ between UKG and SAP?

Common causes are rounding rules, retro edits after period close, unmapped pay codes and employee ID mismatches. A reconciliation report by employee and day will usually point to the cause quickly.

Where does a private AI layer help?

On reconciliation and error explanation across UKG and SAP, run on your own infrastructure because the data is personal. It reads and explains, and a payroll owner approves any correction.

Pairing documented at ukg.cloudapper.ai/ukg-integration/how-to-integrate-sap-successfactors-with-ukg-f . UKG Sync for SAP is a product of CloudApper; Netray is independent and not affiliated with either vendor.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP S/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP S/4HANA? Start with the SAP S/4HANA guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Software