ABAP Custom Exception Class Generator
Class-based exceptions replaced the old classic exceptions of function modules, and a clean exception class makes errors easy to catch, translate and log. This generator produces the class definition, the constructor, a raising example and a TRY/CATCH block that uses a T100 message so the text comes from SE91.
Fill in
Exception class definition
CLASS zcx_order_error DEFINITION
PUBLIC
INHERITING FROM cx_static_check
FINAL
CREATE PUBLIC.
PUBLIC SECTION.
INTERFACES if_t100_message.
CONSTANTS:
BEGIN OF default_error,
msgid TYPE symsgid VALUE 'ZORDER',
msgno TYPE symsgno VALUE '001',
attr1 TYPE scx_attrname VALUE 'order_id',
attr2 TYPE scx_attrname VALUE '',
attr3 TYPE scx_attrname VALUE '',
attr4 TYPE scx_attrname VALUE '',
END OF default_error.
DATA order_id TYPE vbeln_va READ-ONLY.
METHODS constructor
IMPORTING
textid LIKE if_t100_message=>t100key OPTIONAL
previous LIKE previous OPTIONAL
order_id TYPE vbeln_va OPTIONAL.
ENDCLASS.Exception class implementation
CLASS zcx_order_error IMPLEMENTATION.
METHOD constructor ##ADD_SUPER_CALL.
CALL METHOD super->constructor
EXPORTING
previous = previous.
me->order_id = order_id.
CLEAR me->textid.
IF textid IS INITIAL.
if_t100_message~t100key = default_error.
ELSE.
if_t100_message~t100key = textid.
ENDIF.
ENDMETHOD.
ENDCLASS.Raising the exception
METHOD release_order.
" importing iv_order_id TYPE vbeln_va
" raising zcx_order_error
IF iv_order_id IS INITIAL.
RAISE EXCEPTION TYPE zcx_order_error
EXPORTING
order_id = iv_order_id.
ENDIF.
ENDMETHOD.Catching the exception
TRY.
NEW zcl_order_service( )->release_order( iv_order_id = lv_order_id ).
CATCH zcx_order_error INTO DATA(lx_error).
DATA(lv_text) = lx_error->get_text( ).
MESSAGE lv_text TYPE 'E'.
ENDTRY.Create the message {{msgno}} in message class {{msgid}} in SE91 with the text &1 so the attribute is substituted into the message. A static check exception must be declared in the RAISING clause of every method that can raise it. Verify the syntax against your ABAP release; the shape shown is valid for 7.40 and later.
Standardise ABAP error handling
Optional: a short conversation about reviewing exception handling across your custom code with a private AI assistant.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the Z class name, the message class and number you will create in SE91, and the name and type of the context attribute, such as the order number. The tool fills four code blocks: the class definition, the implementation, the code that raises it and the code that catches it. Copy each into SE24, an ADT project or a global class source, then activate. Replace the placeholder method names with your own.
Choosing the superclass
CX_STATIC_CHECK must be declared in the RAISING clause or caught, and the compiler enforces it, which suits business errors the caller is expected to handle. CX_DYNAMIC_CHECK is checked at runtime, and CX_NO_CHECK needs no declaration and is meant for situations the caller cannot reasonably handle. A good default for business rule failures is CX_STATIC_CHECK. Keep a small hierarchy of your own, for example one base exception per application area.
T100 messages and context attributes
Implementing IF_T100_MESSAGE links the exception to a message in SE91, so you get translated texts and the same text in logs and screens. The attributes listed in the default text id constant are substituted into the placeholders &1 to &4. Keep attribute data public and read-only so catchers can read the order number or other context without parsing text. Always chain PREVIOUS when you wrap a lower level error, so the original cause is not lost.
Common mistakes
Developers often forget to add the exception to the RAISING clause, catch the superclass CX_ROOT too broadly, or lose the previous exception. Another mistake is building the message text by concatenation, which cannot be translated. Do not use exceptions for normal control flow in tight loops. Finally, test the class in an ABAP Unit test that checks the text and the attribute value, not just that something was raised.
Frequently Asked Questions
What does IF_T100_MESSAGE do?
It lets an exception class point to a message in a message class defined in SE91. The exception then returns a translatable text with attributes substituted into the placeholders. It is the standard way to give class-based exceptions proper user messages.
Should I use CX_STATIC_CHECK or CX_NO_CHECK?
Use CX_STATIC_CHECK for errors the caller can reasonably handle, since the compiler forces them to be declared. Use CX_NO_CHECK for fatal conditions the caller cannot recover from, which then propagate without declaration. Most business exceptions are static check.
Why do I need the previous parameter?
PREVIOUS chains the lower-level exception so the root cause stays available through the exception chain. Without it a wrapper hides the original failure, and debugging has to start from your wrapper only. Pass it whenever you catch and re-raise.
Can I use this code in older releases?
The class pattern works from about release 7.02 onward, and the inline declarations used in the catch example need 7.40 or later. For older systems declare the variable with DATA beforehand and call lx_error->get_text( ) the same way.
If you want help standardising error handling across a large custom code base, Netray can discuss private AI-assisted code review that runs against your own repository.
Related Tools
ABAP Unit Test Class Generator
Create the skeleton of an ABAP Unit local test class with setup, a happy-path test, a boundary test and an exception test.
Developer ToolsABAP BAPI Return Handling and Commit Generator
Wrap any BAPI call with BAPIRET2 error checking, message text building and a safe commit or rollback.
SAPABAP Built-in Data Types Reference
A quick lookup of the predefined ABAP data types with length, value range and initial value.
SAPABAP Performance Tuning Checklist
A checklist of database, internal table and memory checks to run on slow ABAP reports before they reach production.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- SAP ABAP AUTHORITY-CHECK Snippet Generator
- SAP B1 SQL Query Generator (OITM, ORDR, RDR1)
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- ABAP Unit Test Class GeneratorCreate the skeleton of an ABAP Unit local test class with setup, a happy-path test, a boundary test and an exception test.
- SAP Classification Values ABAP GeneratorEnter a material and a class type and get an ABAP snippet that resolves the internal object number and lists every assigned characteristic and value.
- SAP Configurable Material Selection ABAP GeneratorFill in plant and material type to get an ABAP report that lists configurable materials and counts them by plant.