SAP Quality Notification SQL Query Generator (QMEL and QMFE Pareto)
A defect Pareto is the first chart most quality teams want out of SAP. This generator produces the SQL against the notification header QMEL and its items in QMFE so you can count defects by code group and code, list notifications and rank materials.
Fill in
Q1 customer complaint, Q2 complaint against vendor, Q3 internal problem report in the standard delivery.
The ABAP schema in your HANA database. Often SAPHANADB or SAPABAP1.
Notification list
SELECT h.QMNUM, h.QMART, h.MATNR, h.MAWERK, h.LIFNUM, h.QMDAT FROM SAPHANADB.QMEL h WHERE h.MANDT = '100' AND h.QMART = 'Q2' AND h.MAWERK = '1000' AND h.QMDAT >= '20260101' ORDER BY h.QMDAT DESC;
Defect Pareto by code group and code
SELECT i.FEGRP, i.FECOD, COUNT(*) AS defect_items FROM SAPHANADB.QMEL h INNER JOIN SAPHANADB.QMFE i ON i.MANDT = h.MANDT AND i.QMNUM = h.QMNUM WHERE h.MANDT = '100' AND h.QMART = 'Q2' AND h.MAWERK = '1000' AND h.QMDAT >= '20260101' GROUP BY i.FEGRP, i.FECOD ORDER BY defect_items DESC;
Notifications by material
SELECT h.MATNR, COUNT(DISTINCT h.QMNUM) AS notifications FROM SAPHANADB.QMEL h WHERE h.MANDT = '100' AND h.QMART = 'Q2' AND h.MAWERK = '1000' AND h.QMDAT >= '20260101' GROUP BY h.MATNR ORDER BY notifications DESC;
Run read-only on a replica or a reporting copy, never on a production system without a DBA's agreement. Direct database access bypasses SAP authorizations, so restrict who can run it. Verify field names in SE11 for your release. Notification types are configurable, so Q1, Q2 and Q3 may differ in your system. Exclude deleted notifications by joining the status table JEST.
Want a live complaints dashboard?
An optional review of building a read-only quality dashboard over your SAP notification data.
Optional. The tool and every export work without this. No spam.
How to use the generator
Set the client, plant, notification type and the start date, plus the database schema your ABAP tables live in. Copy the three blocks into your SQL console or BI tool. The first block lists the notifications, the second counts defect items by code group and code for a Pareto, and the third ranks materials by number of notifications. Export the result to Excel and sort it descending to draw the classic bar and cumulative line.
How the Pareto works
Each notification can have several items, and each item carries a defect code group FEGRP and code FECOD from the defect catalog. Counting items per code gives the frequency; sorting descending and adding a running percentage shows the vital few codes that account for most defects. The same query run for vendor complaints and for internal problems tells you whether the main issues come from outside or from your own process.
- Count items, not notifications, when a notification has many defects
- Use COUNT(DISTINCT QMNUM) when you want the number of notifications
- Join QMFE on MANDT and QMNUM
- Translate codes with the code text table QPCT for readable labels
Reading the results
A Pareto with one dominant code points to a focused corrective action, such as a supplier or a specific process step. A flat distribution suggests the coding is too coarse or inconsistent, and the first action is to clean up the catalog. Check also that users code defects at all: a large count of items with a blank code means the data cannot support the analysis.
Common mistakes
Forgetting MANDT in native SQL returns data from every client. Mixing notification types in one Pareto blurs the story. Counting rows after joining causes, tasks and activities as well will inflate numbers, so aggregate each child table separately. Finally, free text defect descriptions cannot be counted, so the catalog discipline matters more than the query.
Frequently Asked Questions
Which table has SAP quality notification defects?
Defect items are in QMFE, joined to the header QMEL by QMNUM and keyed by item number FENUM. The defect code group and code are in the FEGRP and FECOD columns, with texts in the QM code text tables.
What are notification types Q1, Q2 and Q3?
In the standard delivery Q1 is a customer complaint, Q2 a complaint against a vendor and Q3 an internal problem report. Companies copy and rename types, so confirm the list in your own configuration before relying on these values.
How do I get readable defect names instead of codes?
Join the code text table QPCT on catalog type, code group and code, and filter on the language. The catalog type for defects is a configured value, so read it from QMFE or the catalog configuration rather than guessing.
Is it safe to run this on a production HANA database?
Read-only queries are low risk, but direct SQL bypasses SAP authorization checks and can load the system. Use a replica or reporting schema where possible, limit access to named users and agree it with your DBA and security team.
If the real goal is a live quality dashboard or answers to plain-language questions about complaints, we can build that on top of your ERP data with read-only access and the query shown.
Related Tools
SAP QM Database Tables Reference
Searchable lookup of the core SAP Quality Management tables, what each one stores and its main key fields, for report writers and data migration teams.
Developer ToolsSAP QM Inspection Lot ABAP SELECT Generator
Fill in plant, inspection type and date range and get a ready ABAP SELECT joining the inspection lot table QALS to the usage decision table QAVE.
Quality & InspectionSAP QM Cp and Cpk Capability Calculator
Enter the mean, standard deviation and specification limits of a quantitative characteristic and get Cp, Cpk and the expected parts per million out of tolerance.
SAPSAP QM Maturity Assessment
Nine questions about plans, catalogs, notifications, integration and analytics give you a maturity score for your SAP QM use and a list of next steps.
More Developer Tools tools
See all- SAP QM Usage Decision BAPI Skeleton
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
- ABAP BAPI Return Handling and Commit Generator
- SAP ABAP AUTHORITY-CHECK Snippet Generator
Keep exploring
Free tools
- SAP ACDOCA SQL Query GeneratorBuild SQL over ACDOCA for account balances and line items by ledger, company code, fiscal year and period range.
- Lean KPI SQL Query Generator (OEE Downtime Pareto)Fill in your own table and column names to get a downtime Pareto query and an availability query you can run against an MES or ERP reporting database.
- Defect Pareto Analysis WorksheetLog defect categories, counts and unit cost, get the cost impact of each and the totals you need to build a Pareto chart.
ERP fixes and how-tos
- How to create a quality notification in SAP QM (QM01) and set up an 8D reportCreate a quality notification in SAP QM with QM01, choose between Q1, Q2 and Q3 types, add tasks and causes, and set up an 8D report in customizing.
- How to Create a Status Profile in SAP QM (BS02)Create a user status profile in SAP QM with BS02 and assign it to quality notifications, tasks and inspection lots, with status numbers and business transaction control.
- SAP Business One Query: Released Production Orders with Component ShortagesReady-to-run SAP Business One queries on OWOR, WOR1 and OITW to list released production orders with missing components, for SQL Server and HANA.
AI on your ERP
- AI for SAP Plant Maintenance: Notifications, Work Orders, and Predictive SignalsAI grounded on SAP PM data that triages notifications, drafts work orders, standardizes failure codes, and flags predictive maintenance signals, on-prem.
- AI for SAP S/4HANA in Automotive: Scheduling Agreements, Quality Notifications and Line-Side PressureAI on SAP S/4HANA for automotive suppliers: scheduling agreements, JIT/JIS, PPAP and 8D, answered from live data on your own infrastructure, read-only.
Integrations
- How to add WhatsApp to SAP S/4HANAHow to connect WhatsApp Business to SAP S/4HANA: OData APIs, business events, template messages, opt-in rules and two-way replies that post back to SAP.
- How to add WhatsApp to SAP ECC 6.0How to connect WhatsApp Business to SAP ECC 6.0 using BAPIs, IDocs and output determination: order status, shipment alerts, approvals and supplier replies.