SAP QM Inspection Lot ABAP SELECT Generator (QALS and QAVE)
Custom QM reports usually start with the same join: the inspection lot in QALS and its usage decision in QAVE. This generator writes that query with your plant, inspection type and date filters so you can paste it into a report and extend it.
Fill in
Two character inspection type, for example 01 for goods receipt.
Your own code from the UD catalog. Not a fixed SAP value.
Open SQL: lots with usage decision
REPORT z_qm_lots_with_ud.
TYPES: BEGIN OF ty_lot,
prueflos TYPE qals-prueflos,
werk TYPE qals-werk,
matnr TYPE qals-matnr,
art TYPE qals-art,
herkunft TYPE qals-herkunft,
enstehdat TYPE qals-enstehdat,
losmenge TYPE qals-losmenge,
vcode TYPE qave-vcode,
vcodegrp TYPE qave-vcodegrp,
vdatum TYPE qave-vdatum,
END OF ty_lot.
DATA lt_lots TYPE STANDARD TABLE OF ty_lot WITH EMPTY KEY.
SELECT a~prueflos, a~werk, a~matnr, a~art, a~herkunft,
a~enstehdat, a~losmenge, b~vcode, b~vcodegrp, b~vdatum
FROM qals AS a
INNER JOIN qave AS b ON b~prueflos = a~prueflos
WHERE a~werk = '1000'
AND a~art = '01'
AND a~enstehdat >= '20260101'
AND b~vcode = 'A'
ORDER BY a~prueflos
INTO TABLE @lt_lots
UP TO 500 ROWS.
IF sy-subrc <> 0.
WRITE / 'No inspection lots found.'.
RETURN.
ENDIF.
LOOP AT lt_lots ASSIGNING FIELD-SYMBOL(<ls_lot>).
WRITE: / <ls_lot>-prueflos, <ls_lot>-matnr, <ls_lot>-vcode, <ls_lot>-vdatum.
ENDLOOP.Variant: lots still without a usage decision
SELECT a~prueflos, a~werk, a~matnr, a~art, a~enstehdat
FROM qals AS a
LEFT OUTER JOIN qave AS b ON b~prueflos = a~prueflos
WHERE a~werk = '1000'
AND a~art = '01'
AND a~enstehdat >= '20260101'
AND b~prueflos IS NULL
INTO TABLE @DATA(lt_open)
UP TO 500 ROWS.Uses the newer Open SQL syntax with @ host variables, which needs ABAP 7.40 SP05 or later (all S/4HANA releases). Verify field names in SE11 for your release. A rejected lot is not identified by a fixed code: the codes come from your own usage decision catalog. Lots flagged for deletion should be excluded by reading status in JEST. Run in a sandbox first.
Skip the custom report
An optional review of whether a read-only natural-language layer would replace your Z reports for quality.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the plant, the inspection type, the earliest creation date in YYYYMMDD form and the usage decision code you want. The generator fills a complete report skeleton with typed fields, an inner join and a loop. Copy it into SE38 or ADT, activate and run. The second block flips the join to a left outer join to find lots that have no usage decision yet, which is the common backlog report for quality managers.
Why a join on PRUEFLOS
QALS holds one row per inspection lot and QAVE holds the usage decision for that lot, so the inspection lot number PRUEFLOS is the join key. Using an inner join returns only decided lots; a left outer join with an IS NULL test on the QAVE side returns only undecided ones. Filtering on QALS date fields keeps the join small, which matters because QALS grows quickly in plants that inspect every goods receipt.
- Inner join: lots with a usage decision
- Left outer join with IS NULL: lots awaiting a decision
- Filter on WERK, ART and ENSTEHDAT first for speed
- Use UP TO n ROWS while testing
Extending the query
Typical next steps are adding the material description from MAKT, the vendor from the lot header, or the lot status from JEST using the object number OBJNR. Add an authority check on plant using the standard QM authorization object before you release a report to users, and consider a CDS view if the data will feed analytics. If the lot quantity is needed in another unit, convert it with the standard unit conversion function rather than dividing by hand.
Common mistakes
Hard coding a rejection code, forgetting that material numbers can be longer in S/4HANA, selecting without a date filter on a large QALS and skipping the authority check are the main risks. Also remember that a lot can be reset after the decision is changed, so the report shows the state at run time.
Frequently Asked Questions
How do I join inspection lots to usage decisions in ABAP?
Join QALS to QAVE on the inspection lot number PRUEFLOS. An inner join returns lots that have a usage decision. A left outer join with a test for NULL on the QAVE key returns lots that do not yet have one.
Which date field should I filter on in QALS?
ENSTEHDAT holds the creation date of the inspection lot and is a good general filter. Other date fields exist for the start and end of inspection, so pick the one that matches the report question and check names in SE11 for your release.
Can I run this query on ECC as well as S/4HANA?
The tables exist in both, but the @ host variable syntax needs ABAP 7.40 SP05 or higher. On older systems, remove the @ signs, declare the target explicitly and move the INTO clause as the older syntax requires.
How do I exclude deleted inspection lots?
Deletion flags are statuses, not columns in QALS. Join JEST on OBJNR and exclude lots that carry the deletion status, or use a standard function to read the status text. Check the exact status code in your system before filtering.
If you would rather let quality managers ask for open lots or rejected lots in plain language, we can build a read-only layer over your SAP data that shows the query it ran.
Related Tools
SAP QM Database Tables Reference
Searchable lookup of the core SAP Quality Management tables, what each one stores and its main key fields, for report writers and data migration teams.
Developer ToolsSAP Quality Notification Pareto SQL Query Generator
Build a SQL query over QMEL and QMFE that lists quality notifications and counts defects by code group and code, ready for a Pareto chart.
Developer ToolsSAP QM Usage Decision BAPI Skeleton
An ABAP skeleton for recording an inspection lot usage decision through the standard BAPI, with error handling and a commit only when no error is returned.
SAPSAP QM Transaction Codes Reference
A searchable list of the SAP QM transaction codes consultants and key users use every day, grouped by inspection, results, notifications and master data.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
- ABAP BAPI Return Handling and Commit Generator
- SAP ABAP AUTHORITY-CHECK Snippet Generator
- SAP B1 SQL Query Generator (OITM, ORDR, RDR1)
New to SAP HANA and Basis? Start with the SAP HANA and Basis guide and toolkit.
Keep exploring
Free tools
- SAP Open Production Orders ABAP SELECT GeneratorFill in plant, order type and dates and get a ready ABAP Open SQL query for open production orders.
- SAP ABAP Open Items SELECT GeneratorFill in company code, vendor range and key date to get a ready-to-edit ABAP report that lists open vendor items with an overdue calculation.
- ABAP SELECT Statement GeneratorFill in table, fields and a WHERE condition and get modern ABAP Open SQL: SELECT INTO TABLE, SELECT SINGLE and a safe FOR ALL ENTRIES pattern.
ERP fixes and how-tos
- SAP QM: Inspection Lot Not Created at Goods ReceiptWhy SAP QM creates no inspection lot at MIGO goods receipt: QM view, inspection type 01 or 04, QM control key, plant activation, and the QA32 checks to run.
- What Is First Article Inspection in SAP, and How to Run It in QMFirst article inspection in SAP means inspecting the first piece of a production run through QM. Learn the inspection type, lot trigger and results recording.
- SAP QM inspection results report: which tcode shows whatFind inspection results in SAP QM: QA32 lot list, QE51N results worklist, QM12 and QGC2 evaluations, MIC history, and the QALS, QAMR and QAVE tables.
AI on your ERP
- AI for SAP Quality Management: Notifications, 8D, and CAPA Without the Manual DraftingAI grounded on SAP QM data that triages notifications, drafts 8D and CAPA reports, and summarizes inspection trends, deployed on-prem for full traceability.
- AI for ABAP Development: A Private Code LLM That Knows Your Z ObjectsUsing an LLM for ABAP on ECC and S/4HANA: what SAP's own ABAP AI covers, where a private code model helps, and how to keep transports governed.