Acumatica OData Generic Inquiry URL Builder
Acumatica generic inquiries can be published as OData feeds, which is the usual route into Excel, Power BI and ad hoc scripts. This builder assembles the URL with the query options people usually forget to add.
Fill in
The name on the GI, with Expose via OData ticked.
OData v3 endpoint (tenant in the path)
GET https://mycompany.acumatica.com/odata/MyTenant/OpenSalesOrders?$select=OrderNbr,CustomerID,OrderTotal,Status&$filter=Status eq 'Open'&$orderby=OrderTotal desc&$top=500 Authorization: Basic <base64 of user@tenant:password> Accept: application/json
OData v4 endpoint (selected with the version field above)
GET https://mycompany.acumatica.com/odatav4/MyTenant/OpenSalesOrders?$select=OrderNbr,CustomerID,OrderTotal,Status&$filter=Status eq 'Open'&$orderby=OrderTotal desc&$top=500 Accept: application/json
Power BI or Excel feed URL
https://mycompany.acumatica.com/odata/MyTenant/OpenSalesOrders
Use the block that matches your version choice. Spaces and quotes in the filter must be URL-encoded when pasted into a raw HTTP client. The GI must have Expose via OData ticked on the Generic Inquiry screen, and column names are the GI result column names, not database fields. Confirm the exact path for your Acumatica build and whether your instance uses the v4 route.
Governed reporting on Acumatica data
Optional: talk through reporting options on top of your Acumatica data with an expert.
Optional. The tool and every export work without this. No spam.
How to use the builder
Enter your host, tenant and the name of the generic inquiry, then fill in only the query options you need. Copy the matching block into your client. In Excel use Data, Get Data, From OData Feed and paste the plain feed URL. Always limit columns with $select and rows with $top while testing, because a GI over transactions can return a very large result set.
- Tick Expose via OData on the inquiry first
- Test with a small $top before pulling everything
- Use a dedicated integration user with read access only
Filter syntax that works
OData filters use operators such as eq, ne, gt, ge, lt, le and the logical words and, or. Strings use single quotes and dates must follow the format your OData version expects. Column names in $filter and $select must match the GI result column names exactly, including case in many clients. Complex joins and calculated columns belong inside the generic inquiry design, not in the URL.
Common mistakes
The usual failures are a missing tenant segment, an inquiry that was never exposed, and a user without access to the underlying screens. A 401 means credentials or tenant, a 404 usually means the GI name or exposure. Remember that every OData call counts against your license limits on API usage, so schedule refreshes sensibly.
Frequently Asked Questions
Which Acumatica screen exposes a GI via OData?
Open the Generic Inquiry designer for the inquiry and tick Expose via OData in the header. Save it, and the inquiry becomes available as a feed under the OData endpoint for the tenant.
Should I use OData v3 or v4?
Both are available in current releases. v4 is the newer protocol and some clients prefer it, while many existing Power BI and Excel connections still use v3. Pick one per integration and keep it consistent.
Why does my filter return nothing?
Most often the column name or the value format does not match. Check the result column name in the GI, wrap text in single quotes, and test the filter without other options first.
Does this change data in Acumatica?
No. OData feeds from generic inquiries are read only. To create or update records you need the contract-based REST API or screen-based API instead.
If your team keeps rebuilding the same inquiries for finance and planning, we can put a governed natural language layer on top of your ERP data. Ask us about a read-only pilot.
Related Tools
Acumatica REST API Python Script Generator
Produce a ready-to-run Python script for the Acumatica contract-based REST API: login, PUT a record, then logout.
Other ERPsAcumatica Screen ID Reference
Look up common Acumatica screen IDs and names for role setup, generic inquiries, import scenarios and support tickets.
ERP Migration & SelectionAcumatica Go-Live Cutover Checklist for Manufacturers
A cutover checklist covering data, inventory, open orders, security, integrations and rollback before and after an Acumatica go-live.
More Developer Tools tools
See all- Acumatica REST API URL Builder
- Acumatica Sales Order REST JSON Template
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
Keep exploring
Free tools
- Acumatica Generic Inquiry Design TemplateA fill-in design specification for a Generic Inquiry (SM208000): purpose, tables and joins, result columns, parameters, access rights and test cases.
- Acumatica REST API URL BuilderGenerate contract-based REST URLs and the login call for any Acumatica entity, with $filter, $select, $expand, $top and $skip filled in for you.
- Acumatica Sales Order REST JSON TemplateGenerate the PUT request URL and JSON body to create a sales order with two lines through Acumatica's contract-based REST API.
ERP fixes and how-tos
- How to Create a Generic Inquiry in AcumaticaStep-by-step guide to building an Acumatica Generic Inquiry: add tables, set join relations, add filters and results, then expose it as an inquiry, dashboard, or OData feed.
- How to Create an Import Scenario in AcumaticaBuild an Acumatica import scenario step by step: map CSV fields to DAC targets, test with a sample file, and schedule recurring imports safely.
- Acumatica Manufacturing Data Collection: Labor and Production EntryHow shop floor data collection works in Acumatica Manufacturing: clock, labor, move and material entry, who should enter what and how to keep data clean.
AI on your ERP
- AI for Acumatica Inventory and Purchasing: Stock, Reorder and Vendor Questions AnsweredAI for Acumatica inventory and purchasing: reorder risk, receipts, vendor lead times and stock questions answered in plain English via the REST API, read-only.
- AI for Acumatica in Metal Fabrication: Heat Lots, Remnants and Routing Answers From Live DataPrivate AI on Acumatica for metal fabricators: heat-lot traceability, remnants, routing time and quote questions answered from live data via REST and OData.
Integrations
- How to connect Power BI to AcumaticaConnect Power BI to Acumatica using OData Generic Inquiries, the on-prem data gateway or a warehouse, with manufacturing dashboards and natural-language Q&A.
- How to add AI agents to AcumaticaHow to build AI agents on Acumatica: a tool layer over the contract-based REST API and Generic Inquiries, approval before writes, cloud or on-prem models.