Aerospace Counterfeit Avoidance Standards and Clauses Reference

Counterfeit avoidance requirements come from standards, contract clauses and customer manuals. This reference lists the main ones with who they apply to, so you can tell which are relevant to your contract and which are only good practice.

Download:
Standard or clauseSubjectApplies toWhat it addressesType
AS9100D 8.1.4
Prevention of counterfeit parts
Aerospace organizations certified to AS9100
Requires planned and implemented processes appropriate to the organization and product to prevent use of counterfeit parts and their inclusion in product
Quality management standard
SAE AS5553
Counterfeit Electronic Parts: Avoidance, Detection, Mitigation and Disposition
Organizations buying or using electronic parts
Counterfeit risk management for electronic parts including purchasing, receiving, response and reporting
SAE standard
SAE AS6174
Counterfeit Materiel: Assuring Acquisition of Authentic and Conforming Materiel
Organizations buying materiel other than electronic parts
Extends counterfeit avoidance to raw material, fasteners, hardware and other items
SAE standard
SAE AS6081
Counterfeit Electronic Parts Avoidance Protocol, Distributors
Distributors of electronic parts
Requirements for distributors to avoid supplying counterfeit electronic parts
SAE standard
SAE AS6171
Test Methods Standard, Counterfeit Electrical, Electronic and Electromechanical Parts
Test labs and buyers of suspect parts
Common test methods to detect suspect counterfeit electronic parts
SAE standard
SAE AS6496
Counterfeit Electronic Parts Avoidance, Authorized and Franchised Distribution
Authorized and franchised distributors
Distributor requirements for authorized distribution channels
SAE standard
IDEA-STD-1010
Acceptability of Electronic Components Distributed in the Open Market
Inspectors of electronic components
Visual inspection criteria for components bought on the open market
Industry standard
DFARS 252.246-7007
Contractor Counterfeit Electronic Part Detection and Avoidance System
Covered DoD contractors subject to CAS
Requires an operating system to detect and avoid counterfeit electronic parts, with defined system criteria
DFARS clause
DFARS 252.246-7008
Sources of Electronic Parts
DoD contractors supplying electronic parts or products containing them
Restricts sources of electronic parts to original manufacturers, authorized suppliers and trusted suppliers, with notice and test rules for exceptions
DFARS clause
FAR 52.246-26
Reporting Nonconforming Items
Contractors under the clause
Requires reporting of counterfeit or suspect counterfeit items and major or critical nonconformances to the Government-Industry Data Exchange Program
FAR clause
NDAA FY2012 Section 818
Detection and avoidance of counterfeit electronic parts
DoD and its contractors
Statutory basis for the DFARS counterfeit electronic parts clauses
Statute
GIDEP
Government-Industry Data Exchange Program
Participating government and industry members
Exchange of nonconformance, counterfeit and alert information between participants
Program
ISO/IEC 17025
General requirements for the competence of testing and calibration laboratories
Labs used for counterfeit detection testing
Accreditation basis commonly expected of an external test lab
ISO standard
Customer quality clauses
Prime or OEM supplier quality requirements
Suppliers to the prime or OEM
Often add source approval, notification and flowdown requirements beyond the standards
Contract requirement

This table describes what each document addresses in general terms. It does not quote the documents and it is not legal advice. Always read the current revision and the exact clause text in your contract.

Map clauses to purchase orders

Want each PO tagged with the counterfeit and DFARS clauses that apply? We can show how that works in an ERP.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this reference

Search by number, subject or applies to. If you are a machine shop or fabricator, AS9100D clause 8.1.4 and AS6174 for materiel are likely to matter most. If you build or assemble electronics for defense, add AS5553, the DFARS clauses and the testing standards. Match the table against the clauses in your purchase orders and your customer quality manuals, then confirm the current revision of each document with your standards subscription.

Standards versus clauses

A standard such as AS5553 is a consensus document that becomes binding when a customer or a certification scheme calls it up. A clause such as DFARS 252.246-7008 is binding because it is in your contract. The difference matters for audits: you can be nonconforming against a contract clause even if you hold AS9100 certification. Keep a list of which clauses are flowed to you on each program.

  • Standards bind through contract or certification
  • DFARS and FAR clauses bind through the contract
  • Customer clauses can be stricter than either

Reading the table for your situation

Ask three questions. What do we buy: electronics, materiel, or both? Who do we sell to: commercial aerospace, prime defense contractors, or the government directly? What does the contract flow down? The answers narrow the table to a handful of rows. Then check that your counterfeit prevention plan names the same documents.

Common mistakes

A common error is assuming DFARS 252.246-7007 applies to every supplier. Its system criteria apply to covered contractors, though the requirements often flow down in practice. Another is treating AS5553 as the standard for fasteners when AS6174 is the materiel companion. Revisions also change, so avoid quoting clause numbers from old procedures without checking the current text.

Frequently Asked Questions

What is the difference between AS5553 and AS6174?

AS5553 addresses counterfeit electronic parts. AS6174 addresses counterfeit materiel more broadly, such as raw material, fasteners and mechanical hardware. A company buying both usually needs to address both in its plan.

Does AS9100 require compliance with AS5553?

AS9100D clause 8.1.4 requires a process to prevent counterfeit parts but does not by itself mandate a specific SAE standard. Customers and contracts often call up AS5553 or AS6174, so follow what your orders require.

Where do I find the exact DFARS clause text?

The Defense Federal Acquisition Regulation Supplement is published by the US government and is available online. Always read the clause date in your contract, since the version incorporated into the contract is the one that applies.

Is this table complete?

No. It lists the main documents. Specific primes and programs add their own requirements. Treat the table as a starting map and confirm against your contract and customer quality manual.

We can help map which clauses apply to each purchase order and link them to supplier records in your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs