DFARS Flowdown Subcontractor Risk Tracker
Primes and sub-tier suppliers are expected to pass cyber duties down the chain. This worksheet keeps one row per subcontractor so you can see who handles controlled information and whom you have not yet checked.
| Subcontractor | Handles CDI/CUI | 7012 flowed down | Assessment evidence received | CUI volume (1 low to 5 high) | Cyber maturity (0 low to 5 high) | Annual spend | Risk score | Spend-weighted risk | Next review | |
|---|---|---|---|---|---|---|---|---|---|---|
15 | 63 | |||||||||
12 | 10.2 | |||||||||
0 | 0 | |||||||||
4 | 12.4 | |||||||||
6 | 1.44 |
Flowdown of DFARS 252.204-7012 applies where subcontract performance involves covered defense information, so set Unknown to a decision quickly. Scores are a prioritization aid only. Confirm clause applicability with your contracts team and keep the evidence you receive.
Optional supplier flag setup
We can show how to carry CUI and flowdown flags on the supplier record and purchase order in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
List each subcontractor, mark whether they handle covered defense information or CUI, and record whether the cyber incident reporting and safeguarding clause was flowed down. Rate CUI volume from one to five and rate the supplier's cyber maturity from zero to five using whatever evidence you have, such as an assessment score, certification or questionnaire. The sheet computes a risk score and a spend-weighted score so you can sort by exposure.
- Resolve every Unknown within one review cycle.
- Keep the evidence file name or link in your records.
- Sort by weighted risk to plan outreach.
The scoring logic
Risk score equals CUI volume times the maturity gap, which is five minus maturity. A supplier that handles heavy CUI with weak controls scores high; one that handles none scores zero regardless of maturity. The spend-weighted figure divides by 100,000 to keep numbers readable and surfaces large vendors with moderate risk. DFARS 252.204-7012 also expects subcontractors to report cyber incidents to the prime and to DoD, so confirm that route is known.
Common mistakes
Teams flow clauses down to every vendor out of caution, then cannot track the volume, or they skip distributors who in fact pass drawings to a third party. Another mistake is accepting a verbal statement of compliance. Request evidence that matches the level required by your contract and review it on a schedule, especially after ownership or IT changes at the supplier.
Frequently Asked Questions
Which clause covers cyber incident reporting?
DFARS 252.204-7012 covers safeguarding covered defense information and cyber incident reporting, and it is flowed down to subcontractors whose performance involves such information. Confirm applicability for each subcontract.
How do I rate cyber maturity?
Use evidence you hold: a posted assessment score, a third-party certification where required, a completed questionnaire or an audit. No evidence means a low rating until proven otherwise.
Does a zero CUI volume mean no action?
You still keep a record of why the clause was not needed and recheck if the scope of work changes, for example if you start sending drawings.
Can I import this into my ERP?
Export to Excel or CSV and load the fields into supplier user-defined fields or a custom table. Mapping depends on your ERP, so test in a non-production environment.
If supplier approval, purchase order clauses and CUI flags are scattered across ERP and email, we can help consolidate them so buyers see flowdown status at order entry.
Related Tools
CUI Enclave vs Enterprise Scope Cost Calculator
Model whether a dedicated CUI enclave is cheaper than bringing every user into scope, with a break-even CUI headcount and a what-if chart.
Compliance & ContractsPlan of Action and Milestones (POA&M) Template
Fill in a security requirement gap and get a formatted POA&M document with weakness, risk, resources, milestones and sign-off lines.
Aerospace & DefenseDPAS Rated Order Acceptance Deadline Calculator
Find how many working and calendar days remain to accept or reject a DO or DX rated order and how much your lead time must shrink to meet the required delivery.
Compliance & ContractsExport Compliance Program ROI Calculator
Compare program cost with the expected annual loss avoided, then see payback and multi-year net benefit as the effectiveness of controls changes.
More Aerospace & Defense tools
See all- CMMC Level 2 Remediation Budget Calculator
- NIST 800-171 Audit Log Storage Sizing Calculator
- Export License Delay Schedule Risk Calculator
- CMMC 2.0 Level 2 Readiness Assessment
- ITAR Compliance Checklist for Manufacturers
- DFARS 252.204-7012 Compliance Self-Assessment
- AS9100 Audit Readiness Checklist
- Export Control Screening Checklist
- Defense Contractor AI Readiness Assessment
Keep exploring
Free tools
- Defense Subcontractor Flow-Down Tracker WorksheetA supplier-by-supplier register of flowed-down clauses, CUI access, certification status and acknowledgement dates.
- Aerospace External Provider Flowdown ChecklistChecklist of items to include on aerospace purchase orders so external providers receive process, quality, record and regulatory requirements.
- Manufacturing Contract Risk Exposure AssessmentTen questions that score how well your contract practices control liability, IP, flowdown and renewal risk.
ERP fixes and how-tos
- NetSuite Outsourced Manufacturing: Subcontract Work Order FlowSet up NetSuite outsourced manufacturing: vendor charge items, PO to work order link, sending components to the subcontractor, receipt and costing.
- Costpoint Cloud or On-Prem for a Contractor Handling CUI?Deciding between Deltek Costpoint cloud and self-hosted for a defense contractor with CUI: scope, shared responsibility, cost, control, what to verify.
Guides
- SyteLine Outside Processing Configuration GuideConfigure SyteLine outside processing. Subcontractor operations, PO generation, cost tracking, and receipt processing for outsourced manufacturing steps.
- AI Review of Prime Purchase Order Flow-DownsHow defense subcontractors use on-prem AI to review prime PO flow-downs, FAR and DFARS clauses, Q-notes and quality requirements before accepting an order.
- The Defense CIO AI Briefing for 2026: Deploying AI Under CMMC, ITAR, and DFARSDefense CIO AI briefing for 2026: CMMC 2.0, ITAR, and DFARS constraints on AI, plus how defense contractors deploy LLMs without risking CUI exposure.