Africa Major Ports and UN/LOCODE Reference Table
Port of loading and port of discharge fields appear on purchase orders, shipping instructions, bills of lading and customs entries. Using a clean, standard code for each port saves hours of manual correction. This table lists major African seaports with their UN/LOCODE values and the inland corridors they serve.
| Port | Country | UN/LOCODE | Region | Role for inland trade |
|---|---|---|---|---|
Durban | South Africa | ZADUR | Southern | Large container and general cargo gateway, serves Gauteng and neighboring SADC countries by road and rail. |
Cape Town | South Africa | ZACPT | Southern | Container, fruit and general cargo port serving the Western Cape. |
Richards Bay | South Africa | ZARCB | Southern | Bulk cargo port, notably coal and other dry bulk. |
Maputo | Mozambique | MZMPM | Southern | Gateway on the Maputo corridor to Gauteng and landlocked eSwatini region. |
Beira | Mozambique | MZBEW | Southern | Beira corridor port serving Zimbabwe, Zambia and Malawi. |
Walvis Bay | Namibia | NAWVB | Southern | Atlantic port with road corridors to Botswana, Zambia and South Africa. |
Luanda | Angola | AOLAD | Southern | Main general cargo and container port for Angola. |
Lobito | Angola | AOLOB | Southern | Atlantic port at the start of the Benguela railway corridor toward the DRC and Zambia. |
Dar es Salaam | Tanzania | TZDAR | East | Central corridor gateway for Tanzania and landlocked neighbors such as Zambia, Rwanda and Burundi. |
Mombasa | Kenya | KEMBA | East | Northern corridor gateway for Kenya, Uganda, Rwanda, Burundi and eastern DRC. |
Djibouti | Djibouti | DJJIB | East | Main sea access for Ethiopian imports and exports. |
Port Said | Egypt | EGPSD | North | Mediterranean end of the Suez Canal, major container transshipment area. |
Alexandria | Egypt | EGALY | North | Major Mediterranean container and general cargo port. |
Damietta | Egypt | EGDAM | North | Mediterranean container and bulk port east of Alexandria. |
Tanger Med | Morocco | MAPTM | North | Large container and transshipment complex at the Strait of Gibraltar. |
Casablanca | Morocco | MACAS | North | Main port for Moroccan industrial and consumer cargo. |
Dakar | Senegal | SNDKR | West | Atlantic port serving Senegal and Mali by road and rail. |
Abidjan | Cote d'Ivoire | CIABJ | West | Largest port in francophone West Africa, serves Burkina Faso and Mali transit. |
Tema | Ghana | GHTEM | West | Main container port for Ghana, also used for transit to Burkina Faso. |
Lome | Togo | TGLFW | West | Deep water container port with significant transshipment and Sahel transit. |
Cotonou | Benin | BJCOO | West | Port serving Benin and transit traffic toward Niger and Nigeria. |
Lagos | Nigeria | NGLOS | West | Lagos port complex including Apapa and Tin Can Island, with the newer Lekki deep sea port nearby. |
Port Louis | Mauritius | MUPLU | Indian Ocean | Main port of Mauritius, also a regional transshipment hub. |
UN/LOCODE values come from the UN/ECE code list. Check the current list for exact terminals and berths, and always confirm terminal names with your forwarder before you set a port of discharge on a purchase order or shipment.
Clean up your port and location master
Optional: we can profile free text port fields in your ERP and map them to UN/LOCODE values.
Optional. The tool and every export work without this. No spam.
How to use the table
Search by port name, country or code. Copy the UN/LOCODE into your ERP location or port master, and use the role column when comparing routings for a landlocked destination. A shipment to Lusaka may arrive through Dar es Salaam, Beira or Durban, and each choice changes transit time, border crossings and demurrage risk. Add the corridor and typical transit days to your own copy of the sheet after you export it.
What a UN/LOCODE is
A UN/LOCODE is a five character code. The first two characters are the ISO country code and the last three identify the place, for example ZA plus DUR for Durban. It is maintained by the United Nations Economic Commission for Europe and is used by carriers, customs systems and logistics platforms. Using the same code across your ERP, your forwarder's system and customs documents makes reconciliation and landed cost reporting simpler.
Choosing a port for landlocked destinations
Do not pick the closest port on the map. Compare corridor performance, border post delays, transit bond requirements, rail availability and the free days that the shipping line allows at each port. For high value electronics or defense related cargo, include security and insurance conditions on the route. Many manufacturers keep a primary and a backup route in the ERP so planners can switch when a port is congested.
- Ask forwarders for door to door transit time, not only port to port.
- Check free days for containers and storage at each port.
- Confirm transit bond or customs guarantee rules for the route.
Common mistakes
Frequent mistakes are using a city name instead of a port code, mixing up Lagos terminals, and assuming the same free days apply at every port. Another is leaving the port field as free text in the ERP, which produces dozens of spellings of Durban. Load the code list as a validated table and make the field a lookup.
Frequently Asked Questions
Is every African port listed here?
No. It covers major seaports commonly used by manufacturers for imports and exports. Smaller ports, river ports and dry ports exist and have their own codes. Check the UN/LOCODE list for any location not shown.
Why does Lagos have one code for several terminals?
UN/LOCODE identifies a place, not each terminal. Apapa, Tin Can and Lekki are terminals in the Lagos area. Use the terminal name in a separate field when your forwarder or customs entry needs it.
Can I use this for air freight?
This table covers seaports. Airports use IATA codes, which are different from UN/LOCODE. Keep a separate lookup for airports in your ERP.
How current is the port information?
Codes are stable, but corridor roles, terminal operators and capacity change. Use the role column as orientation and confirm current conditions with your forwarder or port authority.
If port and route data in your ERP is inconsistent, Netray can profile your shipping and purchase tables and propose a clean location master.
Related Tools
Africa Port Demurrage and Storage Cost Calculator
Estimate demurrage, detention and storage for containers held at port after free days expire, with two daily rate tiers.
Compliance & ContractsAfrica Import Customs Clearance Document Checklist for Manufacturers
A pre-arrival and clearance checklist for machinery, components and raw materials entering African ports.
Country & TaxAfrica Tax Authority and Tax ID Reference
Look up the revenue authority, the name of the tax ID and the headline VAT rate for 19 African countries when you set up vendor, customer and legal entity master data.
Costing & FinanceAfrica FX Devaluation Landed Cost Sensitivity Calculator
Model how a depreciation of the naira, cedi, kwacha, birr or shilling moves the local-currency landed cost of an imported part.
More Supply Chain & Inventory tools
See all- Africa LCL vs FCL Container Breakeven Calculator
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
Keep exploring
Free tools
- China Major Ports and Airports Code Reference (UN/LOCODE and IATA)Find the UN/LOCODE or IATA code, province and typical role of the main Chinese seaports, river ports and airports for bookings and ERP master data.
- Africa Port Demurrage and Storage Cost CalculatorEstimate demurrage, detention and storage for containers held at port after free days expire, with two daily rate tiers.
- Plant Switch Port Budget WorksheetList devices by plant area, add growth, and get the ports required, switches needed and spare ports for each closet or cell.